BEFORE YOU INSTALL THE LIFT GATE
1. Check the lift gate for shipping damage.
2. Remove the shipping bands, etc. if the gate was shipped vertically, set the gate on the ground.
CAUTION –DO NOT INSERT FORKLIFT FORKS AT BOTTOM OF GATE NEAR DOOR.
Remove the shipping bands, etc. To set lift gate horizontal, chain or lash top cross tube
near chain anchor
3. Remove the box, open and read the installation manual. Check that all major parts have
arrived, such as the electrical box, optional mud flap (if ordered), etc.
4. Inspect the area under the trailer where the lift gate is to be mounted. Be sure the area is clear
of obstructions where the lift gate will be installed. Check the cross member material. If the
cross members are made of aluminum, the aluminum conversion kit (Option #133TLS) must
be ordered and used to mount the lift gate.
5. The use of a battery charger as the sole power source to operate the lift gate is unauthorized
and will prevent the lift gate from working properly. The lift gate must always be operated in
conjunction with at least one (1) 12 volt heavy duty lift gate battery. A minimum of 9.5 volts
must be maintained in order for the DOWN valve and 10.5 volts for the IN/OUT valves to
operate.
6. Read the following pages prior to beginning the installation.
A. Minimum mounting space requirements
B. Pre-installation of the lift gate.
C. Side door mounting information.
D. Installation of the lift gate.
E. Installation adjustments.