
LSX-500 Anatomy: Packing List [Two Boxes Packaging]
Needed equipment: Two 15/16 inch wrenches (not included)
Best if assembled with two people
Part# Part Name Qtys
1 Uprights (with Plastic Plugs, Silkscreen Numbers) [Bo 1] 4
2 Attachment Bars (with Plastic Plugs, Labels)[Bo 2] 2
3 Floor Support Bars [Bo 1] 2
4 Floor Stabilizing Bar[Bo 2] 2
5 Banner [Bo 2] 1
6 Top Cross Supports [Bo 1] 2
7 Tubular Front-Back Supports [Bo 2] 2
Below Parts are in Bo 2
Hardware
Pack Box
4" He Bolt+Steel Washer+Lock Nut[Step1] 4
3 1/4" He Bolt + Lock Nut [Step2] 4
4" He Bolt+Lock Nut[Step3] 16
2" Eye Bolt+Steel Washer+Lock Nut [Step 4] 4
1 Polybag Foam, Foam Cover, Zip Ties 2
1 Polybag Super Lift Belt (With S, M, L Leg Wraps) 1
1 Polybag Universal Lift Belt (With S, M, L Leg Wraps) 1
1 Polybag Lift Straps 1
1 Polybag Overhead Safety Harness 1
1 Polybag
Ruler with Adhesive Velcro 1
Assembly Instruction Manual 1
Training Guide Booklet 1