
TI-480 CCD-0007865REV: 09.19.2023 Page 3
Preparation
Installation
1. Depress pedal (Fig. 1A) as if you were
ushing.
2. Wearing gloves, reach into toilet and pull
out the existing ush ball seal (Fig. 1B) and
safely discard.
3. Use a paper towel and approved cleaner to
clean ush ball seal area.
4. Take new ush ball seal (Fig. 1C), at side
DOWN, and install into lip immediately under
the bowl.
5. Make sure the ush ball seal does not fall
into the tank.
Fig.1
C
B
A
Post-Installation Verication
Immediately After Installation
Make sure FlowMax toilet will ush correctly by depressing the pedal.
Once condent toilet will ush, apply lubricant and seal conditioner. Allow seal conditioner
to cure for 8 to 24 hours.
After Seal Conditioner has Cured
Turn on water and perform a ush test to make sure FlowMax will hold water.