manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Liteplan
  6. •
  7. Lantern
  8. •
  9. Liteplan CE1R/2W/M3 Series User manual

Liteplan CE1R/2W/M3 Series User manual

This manual suits for next models

2

Popular Lantern manuals by other brands

DS Produkte TRF18P0752-1 instructions

DS Produkte

DS Produkte TRF18P0752-1 instructions

Stahl ECOLUX 6610 Series operating instructions

Stahl

Stahl ECOLUX 6610 Series operating instructions

SNOWJOE SUNJOE 24V-LGT500-CT Operator's manual

SNOWJOE

SNOWJOE SUNJOE 24V-LGT500-CT Operator's manual

PRG VARI LITE VL5 Service manual

PRG

PRG VARI LITE VL5 Service manual

Raytec VARIO2 series installation guide

Raytec

Raytec VARIO2 series installation guide

ENSA LEDBT18WS2 installation instructions

ENSA

ENSA LEDBT18WS2 installation instructions

LUG OFFICE LB LED N/T Installation instruction

LUG

LUG OFFICE LB LED N/T Installation instruction

Draper RLEDL19/B instructions

Draper

Draper RLEDL19/B instructions

Green Lighting TRI-SENSOR GL4612LU Assembly & fitting instructions

Green Lighting

Green Lighting TRI-SENSOR GL4612LU Assembly & fitting instructions

Panasonic EY3741B57 operating instructions

Panasonic

Panasonic EY3741B57 operating instructions

Clas Ohlson LCC8T instruction manual

Clas Ohlson

Clas Ohlson LCC8T instruction manual

Coolon WDN-140 manual

Coolon

Coolon WDN-140 manual

shada 1000436 instruction manual

shada

shada 1000436 instruction manual

BEGA 84 036 Instructions for use

BEGA

BEGA 84 036 Instructions for use

BEGA 33 596 Instructions for use

BEGA

BEGA 33 596 Instructions for use

Dale Tiffany GT701162 Assembly instructions

Dale Tiffany

Dale Tiffany GT701162 Assembly instructions

Wagan Brite Nite Pop-Up USB Lantern user manual

Wagan

Wagan Brite Nite Pop-Up USB Lantern user manual

Eaton Crouse-Hinds Pauluhn DLLA M2 Series Installation & maintenance information

Eaton

Eaton Crouse-Hinds Pauluhn DLLA M2 Series Installation & maintenance information

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

IP41
CE1R fitting
Disassembling the CE1R fitting
CE1R/2W/M3/**
CE1R/2W/ST/**
CE1R/3W/DALI/**
Technical Specification:
- Supply Voltage: 220-240V AC 50/60Hz
- Insulation Class: II
- Ingress Protection: IP41
- Emergency Duration: 3 hours
- Light Source: for M3 and ST version 2W LED
for DALI version 3W
- Battery 6.4V 1.6Ah LiFEPO4 for M3 & ST
Battery 9.6V 1.5Ah LiFEPO4 for DALI
- Battery Recharge Time: 12h
- Max Battery Temperature: 55°C
- Ambient Temperature: 0 - 40°C
- Viewing Distance: 25m
- Charge indicator: Green / Red LED
- Deep Discharge Protection DDP
- Self-Test & DALI versions available
- Surface assembly (ceiling)
- Assembly indoors to flat surface
- Polycarbonate body, Plexi Glass
- Maintained or Non-Maintained Operation
Important:
It is recommended that the unit is installed by a competent person
ensuring the installation complies with the necessary standards. The
company accept no responsibility for incorrect installation, operation
or maintenance. The unit requires an unswitched supply for charging
the battery and a switched supply for a maintained unit. After
installation of the fitting, the battery must be charged for 24 hours.
LED indication Chart
Testing / Commissioning:
Ensure the load is connected
Enter the commissioning date on battery pack and connect the
battery
Switch on the unswitched supply – Check that the green charge LED
illuminates
Switch on the maintained supply – Check that the fitting illuminates as
normal
Switch off the maintained supply
Switch off the unswitched supply – Check that the green charge led
extinguishes and the fitting illuminates
Enter the commissioning date on battery pack
Switch on the unswitched supply
It is recommended that the batteries are renewed every 6 years.
The fitting is equipped with non-replaceable LED.
Self-Test Function:
A Function Test automatically runs every 28 days. During this test the
fitting is switched into emergency mode for 1 minute. During the test
the battery discharge current is checked.
A Full Duration Test automatically runs every 364 days. During this
test the fitting is switched into emergency mode for 3 hours . During
the test the battery discharge current and battery voltage is checked
Hole dimensions
300
45
min
150mm
I
II
202 mm
206 mm
299 mm
230mm
20 mm
Ø19
Ø12
Ø43
130mm
206mm
43mm
327mm
130mm
Mounting detailsConnections for DALI version
Dimensions
Additional guidelines
Guidelines for installation
Ensure a permanent supply to connection L
Ensure a switched supply connection L1
For Non-Maintained use only L, do not connect to L1
Ensure correct polarity of the battery
The drawing in the fitting may vary to the actual product, connect as per label on fitting.
When fitting a flush fitting, refer to installation instruction, including any ceiling manufacturer's instructions.
Connections for Maintained, Self-Test and Non-Maintained versions
Assembly instruction