The C350 system is to be used on potable water only. If there is a hot water heater, it must have a check valve to prevent
hot water from entering the system. The user must ensure that the feed water to the system is microbiologically safe and
meets the operating specifications outlined in the specifications on page 3. If your water analysis shows levels in excess of
the maximums, contact Living Water for pretreatment recommendations.
Install the system where it will be protected from extreme heat, cold and precipitation. Always abide by local plumbing codes
when installing the system.
Installation Requirements
1. Connect a 3/8" line from the feed water supply to the bulkhead connector marked FEED.
2. Connect a 1/4" line from the connector located under the middle cartridge filter (membrane) to the drain.
3. Pressurized storage tank - Connect a 3/8” line from the bulkhead connector marked TANK to the pressurized storage tank.
4.Connect a 3/8" line from the bulkhead connector marked PRODUCT to the point-of-use dispensing device or faucet.
Plumbing
1.The system will ship from the factory pre-flushed.
2. Check all tubing connections to ensure they are firmly seated. Check to see that all filter cartridges are fully in the locked
position (clockwise) on their heads.
3. Turn on the water supply and check for leaks.
4. Plug the system into an electrical outlet. CAUTION: The pump will start.
5. Allow the system to run and the tank to fill.
6. When the tank is full, the pump will shut-off. The tank pressure can be monitored by checking the pressure gage on top
of the unit. The pump will shut off at approximately 60-65psi, and turn on when water levels in the tank go below 40-45psi.
7. Within one to two hours after initial application of water pressure, check again for leaks especially at the tank, faucet
tubing and connectors. These parts will not see full pressure until approximately 1 hour after the system is activated.
Initial Startup
COMMERCIAL REVERSE OSMOSIS