
8, 10, the cathode adjustment needed for steady flow setting knob 6 to
current value, and then the demolition of short circuit conductor. Adjust
the voltage to the desired voltage value, connects the load to the output
very eight straight, the negative 10 (pay attention to the positive and
negative polarity correctly), can be normal use, steady flow indicator
lights up 5 at this time. Work in steady flow state power, i.e., constant
current, voltage changes overload.
(5)Note: please do not load to start the power switch, otherwise easy
to damage the power supply box of load. Connect the load to the output
terminals "+" "-", pay attention to the positive and negative polarity is
correct. When requiring higher ripple coefficient, please ensure that the
"+" "-" output terminals must have a reliable grounding "GND", in order
to reduce the ripple
四、Maintain
4-1 Insurance tube replacement
If there are any insurance tube burn out, you must find out the reason,
the native of insurance available capacity of the same failure tube
replaced.
4-2 Maintain
The power supply before delivery by the precision calibration,
non-professional workers do not open the without authorization. If you
have internal damage, please contact with dealers, high pressure
machine, please do not repair yourself.