CableTRAN Series MoCA1.1+ Controller User Manual
Connection Indicator Light
On: CPE equipment connected
Flicker: Sending and receiving data
Off: Power disconnected or broken
Installation
1.Attention
In order to guarantee normal work of equipment and extend service life, please follow the
following regulations during the process of installation:
1) Please handle gently during the process of installing and moving equipment.
2) Please use the original power adapter.
3) Please put the machine on the horizontal or vertical place, far from heat source, avoid
getting wet and keep ventilation.
4) Please put the machine in the dry environment with no dust.
5) Please connect the coaxial cable when the equipment is power off.
6) Please make sure that optical receiver and the associated equipment are normal
before installation (e.g.: ONU, Switch).
7) Please make sure to connect the ground wire to avoid lightning stroke and static.
2. Installation Steps
1) Equipment fixed
If horizontal, please put the machine on the flat ground; if vertical, please pull the hook
on the bottom out and hang it on a secure place.
2) Ground connection
Use the ground wire to connect the ground.
3) Coaxial cable connection
Connect the RF interface of optical receiver to TV IN1;
Connect the RF OU1 with the branch distributor network.
4) Ethernet connection
Connect ETH interface with the associated equipment. If it needs debug, connect the
debug computer to debug interface.
5) Power connection
Connect the power adapter and switch on the power, and check whether the indicator
light is normal or not.
6) Parameter configuration
Configure the parameter of controller and CPE by using WEB or NMS.