
4
Technical specification
Feed Rate: Refer to name plate Dimensions: See Figure #1
*Model 10 min. 0.13 gal/day, 0.49-LPD .02-
LPH Electrical Rating: Refer to name plate
*Model 10 max. 13.0-gal/day, 49-LPD, 2-LPH Maximum Ambient Temperature: 104ºF (40ºC)
*Model 50 min. 0.68-gal/day,2.57-LPD, 0.11-LPH Maximum Pressure: 25-PSI, 1.6 bar
*Model 50 max. 60.0-gal/day,227-LPD,9.46-LPH Materials of Construction
*Model 75 min.0.97-gal/day,3.67-LPD, 0.15-LPH Pump Head: Chemical Resistant Resin
*Model 75 max. 97.0-gal/day, 367-LPD, 15.3-LPH Pump Head Tubing: Special Approved Synthetic Rubber
Injection Fitting (standard w/check valve): PVC
Suction/Discharge Tubing: Polyethylene
*Denotes approximate feed rates. Actual output must be
measured at time of application Pump Housing: Chemical Resist Resin
INSTALLATION
1. Mounting: Locate the feeder so there is
direct access to the power cord plug.
DO NOT POSITION SO THAT
COOLING VENTS IN THE REAR OF
THE CASE ARE OBSTRUCTED, .19in.
(4.7mm) minimum ventilation clearance
is required.
2. For ‘CE’ approved units the bracket
mount (Item #34 on page 2) must be
utilized for stationary mounting of pump.
3. Alternate mounting (not approved for
‘CE’):Set the feeder on a flat level
surface that will support its weight. The
feeder should be mounted on its 4 (four)
rubber feet (or use keyholes on back for
wall mounting (4.75in./12.60cm typical
spacing). Locate the feeder so there is
direct access to the power cord plug.
4. Electrical - Verify the electrical requirements for the pump as listed on the name plate and connect to
an appropriate electrical source in compliance with local codes for the specific application.
5. Injection Fitting - Relieve system pressure in the drain piping run where the injection fitting is to be
installed. See Figure #2. The injection fitting must not be installed in a dead end pipe or a deeply
recessed tee. It should be installed so as to place the tip at the center of the fluid stream. The
injection fitting has .25-NPT threads. If necessary drill a .44in.-diameter hole and using care not to tap
to deeply, tap for .25-NPT. Apply plumbers tape to the injection fitting threads and install into piping
system. DO NOT REMOVE THE PLASTIC SLEEVE ON THE TIP OF THE FITTING. It is a functional
part. Inspect piping system and eliminate piping cross-connections to prevent feeding
chemical to areas not needing treatment.
6. Suction and Discharge Tubing - Take the 15-ft. (4.5m) length of .25in.-dia. tubing included, measure
and cut the lengths needed to run from the pump head to the injection fitting, and to the chemical tank
(Figure #2). Cut the tubing ends square.
7. Refer to maintenance section to install the pump head tubing.
Figure #2