manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. MechaPlus
  6. •
  7. Industrial Equipment
  8. •
  9. MechaPlus Pro Basic Series User manual

MechaPlus Pro Basic Series User manual

Pro-Basic 10-05 Montageanleitung
Congratulations on aquiring a machine from our Pro Line.
A few comments about the assembly of the machine.
Please read this description through thouroughly before you begin.
All screws are to be tightened only slightly - when the machine is completely assembled are they to be tightened firmly !
* Firstly get an overview over the parts and check the BOM
* Take a look at the pictures on the CD included
* Power supply: The connection should be done by a professional.
*
Do NOT turn up the voltage on the power supply !
www.cnc-modellbau.net 1
*
Do NOT turn up the voltage on the power supply !
- 24V are preset - the controller will blow if turned to more than 28V !!
For assembly you will need the following tools:
* A152 2/3/4/5/6
* Torx wrench T40
* Wrench SW 13 / 14
* Flat wrench 13mm
* Mallet small
* Oil/grease
* Oil/grease
* Side-cutters small
* Screwdriver small/medium
* Sliding rule (calliper)
* Tape measure
* Centre punch
* Small hand drill
* Drill 2,5mm
* Marker/pencil
www.cnc-modellbau.net 1
Pro-Basic 10-05 Montageanleitung
Profile connector
The profile connectors can be assembled in 4 directions
www.cnc-modellbau.net 2
Make sure that the sliding block slips into a groove
The grub screw (headless screw) hast to be level with the top side
www.cnc-modellbau.net 2
Pro-Basic 10-05 Montageanleitung
Profile connector
www.cnc-modellbau.net 3
Insert the Torx screw ( Torx T40 ) and screw lightly with a cordless screwdriver or ratchet! The screw forms the thread. A bit of oil or
grease will make it easier.
Don't screw in the screws completely, leave approx. 1mm
air between head and sliding block. The sliding block should
now "rattle" with a bit of backlash.
TIP:
Test screwing on the feet of the machine first - the threads have to be pre-formed (see page 5)
www.cnc-modellbau.net 3
Pro-Basic 10-05 Montageanleitung
Underparts
First lay out all parts belonging to the underframe on an even surface.
Allocate the parts.
The struts for the working area have to be inserted into the upper profile
before
assembling the 2nd front part.
www.cnc-modellbau.net 4
TIP:
2 flange bearings and the motor bracket on the Y axis
should now be assembled to the front part.
see page 7
You will need 16 profile connectors..
4 connectors are needed per corner.
Screw the connectors into the front and side parts the "long" way.
Screw the connectors into the front and side parts the "long" way.
If the connectors are assembled correctly, the corners can be
slid open easily.
Remember: Fasten all connectors lightly !!
Under part
Allen key® 4mm
The connectors are tightened with this screw.
Moving or loosening is possible at any time.
www.cnc-modellbau.net 4
Pro-Basic 10-05 Montageanleitung
Upper part
Allen key® 4mm
The corner part hast to be level !
The easiest way to assemble the frame is when it is placed
on a straight, flat table, top side down.
Assemble the machine feet after the frame has been put together
www.cnc-modellbau.net 5
Machine feet
Assemble machine feet underneath on the inside.
TIP !
Pre-form the thread for the feet with a profile connector screw.
To assemble place a M8 washer under the screw nut.
SW 13 / 14
SW 13 / 14
The machine can be adjusted by the feet later.
The threads (4x) of the portal/gantry should also be pre-formed.
www.cnc-modellbau.net 5

Other manuals for Pro Basic Series

1

This manual suits for next models

1

Popular Industrial Equipment manuals by other brands

ABB +Q957 user manual

ABB

ABB +Q957 user manual

G.B.C BASIC EDGE 50 instruction manual

G.B.C

G.B.C BASIC EDGE 50 instruction manual

Tronair Batpak 11-6602-1000 Operation & service manual

Tronair

Tronair Batpak 11-6602-1000 Operation & service manual

Pilz PNOZ mi2p Operation manual

Pilz

Pilz PNOZ mi2p Operation manual

Clemco Zero BNP 6012 manual

Clemco

Clemco Zero BNP 6012 manual

Erskine Attachments V-Plow Operator's manual

Erskine Attachments

Erskine Attachments V-Plow Operator's manual

ABB HT610965 Operation manual

ABB

ABB HT610965 Operation manual

Morra MH 540 user manual

Morra

Morra MH 540 user manual

Eaton S090ST manual

Eaton

Eaton S090ST manual

GRIGGIO G 240 P4 instructions

GRIGGIO

GRIGGIO G 240 P4 instructions

Nexen AIR CHAMP HT45 user manual

Nexen

Nexen AIR CHAMP HT45 user manual

WTE V5 installation manual

WTE

WTE V5 installation manual

ABB HT845232 Operation manual

ABB

ABB HT845232 Operation manual

SMC Networks CJP Series Operation manual

SMC Networks

SMC Networks CJP Series Operation manual

JohnDow Industries JDI-AFT58 Operator's manual

JohnDow Industries

JohnDow Industries JDI-AFT58 Operator's manual

IMB MB9016A instruction manual

IMB

IMB MB9016A instruction manual

Clarke CUMB1 Assembly & operating instructions

Clarke

Clarke CUMB1 Assembly & operating instructions

amiad Arkal Spin Klin 2 user guide

amiad

amiad Arkal Spin Klin 2 user guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.