E-BAM-9800 Operation Manual Rev M Page 2
Table of Contents
1INTRODUCTION 4
1.1 About This Manual......................................................................................................4
1.2 Technical Service........................................................................................................4
1.3 E-BAM: Environmental Beta Attenuation Monitor .......................................................4
1.4 Beta Radiation Safety Statement................................................................................5
1.5 The E-BAM and U.S. EPA Equivalent Methods..........................................................5
1.6 E-BAM Specifications .................................................................................................6
2E-BAM UNIT ASSEMBLY AND START-UP 7
2.1 Assembling the E-BAM...............................................................................................7
2.2 Electrical Connections ................................................................................................9
2.3 Power-up and Automatic Operation..........................................................................11
2.4 Power-up Settings Verification and Automatic Self-Test...........................................11
2.5 Filter Tape Loading...................................................................................................14
2.6 Warm-up Period........................................................................................................15
3E-BAM USER INTERFACE and MENU SYSTEM 16
3.1 The User Interface - Keypad and Display Functions.................................................16
3.2 Using the Main Sampling Screen..............................................................................17
3.3 Using Main E-BAM Menu System.............................................................................18
4SAMPLE SITE SELECTION 21
4.1 Site Selection Requirements.....................................................................................21
4.2 Fall Hazard and Security Cautions............................................................................22
4.3 Confined Sampling Locations ...................................................................................22
4.4 Smoke and Ash Monitoring.......................................................................................23
4.5 Remote Monitoring With Solar or Battery Power ......................................................23
5FIELD CALIBRATIONS AND FLOW CHECKS 25
5.1 Leak Checks and Nozzle/Vane Cleaning..................................................................25
5.2 Ambient Temperature Sensor Audit..........................................................................28
5.3 Ambient Barometric Pressure Sensor Audit..............................................................28
5.4 Flow Audits and Calibrations ....................................................................................29
5.5 Filter RH Sensor Audit..............................................................................................31
5.6 Filter Temperature Sensor Audit...............................................................................31
5.7 Pump Tests...............................................................................................................32
5.8 Analog Output Audits................................................................................................33
5.9 Span Membrane Tests..............................................................................................34
6THE E-BAM MEASUREMENT CYCLE 36
6.1 The Hourly Measurement Cycle................................................................................36
6.2 The Real-Time Average Measurement Cycle...........................................................37
6.3 Comparing the Hourly and Real-Time Values...........................................................40
7SETUP MENU DESCRIPTIONS 41
7.1 The Clock Setup Screen...........................................................................................41
7.2 The Tape Advance and Real-Time Average Setup Screen......................................41
7.3 The MACHINE TYPE PM10/PM2.5 Setup Screen.......................................................42
7.4 The Analog Output Setup Screen.............................................................................43
7.5 The Serial Port Setup Screen ...................................................................................43
7.6 The RH Control Setup Screen ..................................................................................44
7.7 The Flow Rate and Flow Type Setup Screen ...........................................................44
7.8 The Ambient RH Sensor Setup Screen ....................................................................45
7.9 The Pump Protection Setup Screen..........................................................................46