MinXray HF100 User manual

HF100
»
HF100H
SERVICE
MANUAL
MINXRAY...
3611
Commercial
Avenue
Northbrook,
Illinois
60062-1822,
U.S.A.
Phone:
(847)
564-0323
Fax:
(847)
564-9040
Toll
Free:
(800)
221-2245


HF100/HF100H
SERVICE
MANUAL
98JAN9
This
manual
is
established
for
repair:
adjustment
of
portable
x-ray
device
HF100
and
HF100H.
Copy
and
transfer
without
notice
is
prohibited.
contents
1.Introduction
2.Specifications
3.Operating
procedures
4.Pre-adjustment
5.Re-adjustment
ofkV
6.Re-adjustment
of
Pre-heat
time
and
mA
7.Re-adjustment
of
exposure
time
8.Sample
of
output
waveform
9.Circuit
diagram
10.Reference
materials
11
13
16
17
18
19


1.
Introduction
This
service
manual
is
applied
for
HF100
and
HF100H
x-ray
unit.
HF100H
is
human
use
version.
But
there
are
mechanical
and
electric
parts
which
are
not
exchangeable.
So,
replacement
on
repair
should
be
done
carefully.
Major
difference
between
HF100
and
HF100H
are
as
follows.
Parts
HF100
HF100H
Collimator
mounting
ring
for
R-120H
for
R70
Key
board
PC.Board
(M3107A)
20mA
for
HF100H
Timer
P.C.Board
(M3108A)
20mA
fixed
type
for
HF100H
Control
P.C.Board
(M9112)
exchangeable
exchangeable
Inverter
(M9111)
exchangeable exchangeable
Insert
Box
exchangeable exchangeable
|
Collimator
transformer
for
R-120H
for
R70

2.
SPECIFICATIONS
POWER:
Range
Minimum
voltage
with
no
load
---------
Maximum
voltage
with
no
load
--------
Frequency
Electricity
consumption
at
120V
------
Maximum
voltage
consumption
--------
100
~
130VAC
100VAC
140VAC
50/60Hz
minimum
20A
(40kV)
maximum
32A(100kV)
3.5kVA
+
10%
NOTE:
This
unit
would
be
severely
damaged
if it
is
used
with
incorrect
line
voltage.
OUTPUT
:
Inverter
:
120kHz
high
frequency
inverter
system
with
neutral
ground
circuit,
2kW
-
60kHz
inverter.
tube
potential
feedback
system
tolerance
+3kVor
+10%
Filament
circuit:
0.5
Watt
-
45kHz
inverter
tube
current
feedback
system
tolerance
+10%
pre-heat
time:
approximately
2sec.
WARM
UP
TIME:
Approximately
10
seconds
after
each
exposure
and
after
the
initial
Power
On.
X-RAY
OUTPUT
:
Maximum
tube
voltage:
100kV
+10%
Minimum
tube
voltage:
40kV
10%
(adjusted
at
97.5
—
99kV)
(adjusted
at
41
—
39kV)
kV
switch:
2kV
steps
tube
current
:
20mA
+10%
constant
(adjusted
at
19mA)
timer
range
-
HF100:
0.01
—
2.00
sec.
0.01
sec.
steps
HF100H
:
0.08
—
4.00
sec.
0.01
sec.
steps
(adjusted
at
each
value
£1%
of
time
base
pulse
of
100Hz)
X-RAY
TUBE
:
TOSHIBA
D-124S
focal
spot
size:
1.2mmX1.2mm
target
material:
tungsten
angle
:
16°
anode
heat
storage
capacity:
14kJ
(20.0kHU)

COLLIMATOR:
Continuously
adjustable
light
beam
type
with
central
ray
indicator,
and
cassette
size/distance
to
aid
in
correct
positioning.
R-120H
On
time
:
90
sec.
bulb:
Fuji
Lamp
Inc.,
No.
JC12V40W
product
life
:
longer
than
50
hours
Tlluminance
:
over
160
lux
at
21”
SID
Contrast
ratio:
over
3:1
at
3:1
at
21”
SID
R70
Refer
instruction
manual
of
Advantech.
FILTRATION:
inherent
filtration
2.2mm
Al
collimator
filtration
0.5mm
Al
total
filtration
2.7mm
Al
WEIGHT:
HF100
-----
16.5kgs
HF100H
---
18.5kgs
SIZE
:
HF100
---
29
cm
(W)
X
23
cm
(H)
X
40.0
cm
(L)
HF100H
---
29
cm
(W)
X
23cm
(H)
x
38.5
cm
(L)
POWER
CORD:
3.6m
EXPOSURE
CORD:
3.0m

3.
OPERATING
PROCEDURES
CONNECTION:
After
confirming
POWER
CORD
and
EXPOSURE
SWITCH
are
usual
condition,
connect
them
to
main
body
of
x-ray
unit
certainly.
(If
connector
has
lock,
confirm
it
is
locked.)
Confirm
POWER
SWITCH
is
OFF
and
connect
POWER
CORD
to
wall
receptacle
of
proper
mains.
(When
you
used
extension
cord,
3.5kW
should
be
obtained.)
POWER
ON:
Set
POWER
SWITCH
on
control
panel
to
on,
then
each
indicator
will
be
turned
on.
When
the
unit
is
warming
up,
exposures
can
not
be
taken.
After
approx.
10
sec.,
WARM
UP
indicator
will
go
off.
The
unit
is
now
ready
to
use.
CAUTION
DO
NOT
SWITCH
ON
AND
OFF
QUICKLY
IN
A
SHORT
TIME.
WHEN
TURNING
ON
AGAIN
AFTER
TRUNING
OFF,
WAIT
FOR
AT
LEAST
1
MINUTE.
OTHERWISE,
HIGH
FREQUENCY
INVERTER
CANNNOT
WORK
PROPERLY.
kV
SETTING:
Set
kV
in
the
range
of
40kV
to
LOOKV.
TIMER
SETTING:
Set
timer
in
the
range
of
(HF100
:
0.01
sec.
to
2.00
sec.)(HF100H
:
0.08
to
4.00
sec.)
depends
on
subject,
distance
and
screen/film
combination.
Time increments
are
0.01
sec.
ADJUSTMENT
OF
RADIATION
FIELD
:
Pressing
the
collimator
switch
will
illuminate
the
field
for
approx.
(HF100:
90sec.)
HF100H
:
30
sec).
Adjust
light
field
to
position
of
radiograph
by
two
knobs
for
adjustment
of
opening.
During
this
time,
use
the
adjustment
knobs
to
size
the
radiograph
as
you
need.
RADIOGRAPHY
:
Make
sure
that
WARM
UP
indicator
is
OFF
before
pressing
exposure
switch.
CAUTION
WARM
UP
INDICATOR
BECOMES
OFF
AFTER
10
SEC.
FROM
POWER
ON.
WARM
UP
INDICATOR
BECOMES
OFF
AFTER
10
SEC.
FROM
EACH
EXPOSURE.
IF
WARM
UP
INDICATOR
IS
ON,
RADIOGRAPHY
IS
IMPOSSIBLE.
Make
sure
all
WARNING
LAMPS
are
off.
After
all
safety
checks,
press
only
first
stage
of
EXPOSURE
SWITCH.
STANDBY
indicator
goes
off
after
1
sec.
Then,
unit
is
ready
for
exposure.
Press
second
stage
of
EXPOSURE
SWITCH.
X-RAY
indicator
is
lit
and
radiography
is
executed
for
the
time
set.
The
EXPOSURE
SWITCH
is
a
DEDMAN
style.
So,
if
the
button
is
released,
exposure
is
stopped.
So,
hold
the
button
until
exposure
is
complete.
WARM
UP
indicator
will
light
after
exposure.
X-RAY
BUZZER
is
ON
and
OFF
(only
HF
100).
-4-

NOTE:
The
first
stage
of
EXPOSURE
SWITCH
is
pre-heat
of
filament.
DON’T
KEEP
ONLY
FIRST
STAGE
OF
EXPOSURE
SWITCH
“ON”
LONGER
THAN
30
SEC.
POWER
OFF:
When
the
POWER
SWITCH
is
pressed,
all
of
indicators
on
the
control
panel
are
off.
WARNING
LAMP:
HF100/HF100H
have
2
kinds
of
warning
lamps.
If
either
of
them
is
lit,
x-
ray
cannot
be
generated.
Each
detail
is
as
follows.
KIND
OF
WARNING
LAMP
DETAILS
COUNTERMEASURE
WARM
UP
The
internal
circuit
is
|
Wait
until
light
goes
off.
warming
up.
ERROR
Unit
malfunction.
Stop
exposing
and
follow
steps
below.
x
If
ERROR
indicator
is
lit
even
when
EXPOSURE
SWITCH
BUTTON
is
released,
it
means
an
unusual
situation
has
been
occurred.
Therefore,
turn
off
POWER
SWITCH,
wait
3
minutes,
then
start
procedures
over
again.
This
unit
generates
x-ray
by
an
inverter.
Therefore,
it
requires
warm
up
time
to
be
stable
after
power
on
and
each
exposure.
When
WARM
UP
indicator
is
off,
warm
up
is
finished.

4.
PRE-ADJUSTMENT
+
Each
PC
Boards
deliverd
from
Mikasa
Factory
have
already
been
adjusted.
[L
24VDC
power
supply
adjustment]
(SVB24SB)
Check
output
(DCV)
at
Red
(+)
and
Black
(-)
wires.
-Adjust
VR
to
be
24VDC
+0.
3V
2.
M3108A
adjustmenti
(refer
page
7)
kV
adjustment:
kV
is
decreased
by
turning
clockwise.
|
1.
2.
This
adjustment
is
need
the
special
test
equipment
(HF
tester)
Check
the
DC
voltage
between
the
kV
test
point
(+)
and
(-)
on
the
HF
tester.
|
Set
the
kV
selector
to
100kV
and
turn
VRI
(M3108A)
so
that
the
DC
voltage
is
5.0
VDC.
Check
the
each
kV.
Finaly
check
the
kV
by
using
an
external
kV
tester
such
as
the
Victoreen
NERO.
The
readings
will
indicate
a
little
lower
than
the
actual
output
because
of
the
tester
dynamics
for
high
frequency
x-ray
production,
so
don't
adjust
over
97kV
as
indicated
by
testing
device.
mA
adjustment:
mA
is
decreased
by
turning
of
VR5
clockwise.
1.
2.
This
adjustment
is
need
the
special
test
equipment
(HF
tester)
Check
the
DC
voltage
between
the
mA
test
point
(+)
and
(-)
on
the
HF
tester.
Set
the
mA
indicator
to
20mA
and
turn
VR5
(M3108A)
so
that
the
DC
voltage
is
2.0
VDC.
Exposure
time
adjustment:
[Exposure
time
is
decreased
by
turning
clockwise.
Time
base
is
100
Hz
(
10
msec.).
When
short
pin
of
JP2
is
pulled
out,
X-RAY
LED
is
lit
not
related
with
timer.
Measure
voltage
between
of
TIME
terminal
and
GND
terminal
by
Oscilloscope,
and
adjust
by
turning
VR6.
IMPORTANT
Disconnect
the
connector
JP2
on
M3108A
PC
board
before
pull
out
short
pin
of
X-ray.
Otherwise,
inverter
board
will
work
and
X-ray
will
be
generated
unrelated
with
timer
setting
and
X-ray
unit
might
be
broken.
*
Put
in
and
pull
out
connectors
at
POWER
OFF.

12V
—
1
0mS
一
%
TIME
BASE
WAVEFORM
REFFRENCE:
There
are
three
short
pins
on
M3108A
(
LBD,
10SEC
and
TEST).
Each
factors
are
as
follows.
LBD:
When
put
in,
lighting
time
of
collimator
is
45
sec.
When
pull
out,
it
is
90
sec.
10SEC:
When
put
in,
WARM
UP
time
is
1
sec.
When
pull
out,
it
is
10
sec.
This
short
pin
is
for
adjustment
at
factory
before
shipment.
So,
don't
use
the
unit
with
short
pin.
TEST:
Never
pull
out
this
short
pin.

akla
께
레
그
va
Pal
va
차
a
amo.
Ra
ms
A
d
>,
人
oMIKASA,
[131264
MR
сю,
в,
м,
Васа
ах
L
二
če
5
ŘÍS
[+]
E
É
mê rs
PE
mae
me!
B
ts
“e
TR?
Sa
(3.
M9111
PC
board
adjustments|
(
refer
page
9)
adjustment
of
followings
+
over
voltage
protection
circuit
(
VRI
)
+
over
current
protection
circuit
(
VR2
)
+
DC
voltage
adjust
circuit
(
VR3)
adjusting
the
DC
voltage
have
to
use
special
equipment.
(4.
M9112
PC
board
Adjustments|
(
refer
page
10)
Adjustment
of
frequency
of
Inverter
board.
(VRI)
Adjustment
of
Pre-heat
time.
(VR3)
Adjustment
of
kV.
(VR4)
Adjustment
of
mA.
(VR5)

M9111
PC
BOARD
adjustment
a
ㄴㄴ
n-
cs
u
?
RE
2
ps
Le
mel
aa
|
m,
|
|
9
Lo
c
Ἡ
Q
gayi
e
L
el
TF
=
This
adjustment
has
to
be
done
after
connect
all
of
connectors
completely
But
actual
exposure
is
not
necessary.
*
Each
PC
boards
delivered
from
Mikasa
Factory
have
already
been
adjusted.
1.
Adjustment
of
VR3
(
DC370Y
)
Adjust
voltage
between
370V
(+)
and
GND
(-)
to
be
368.5
-
372V
by
turning
VR3.
Voltage
is
increased
by
turning
clockwise.
|
2.
Adjustment
of
VR2
(
Over
Current
Protection
circuit)
Adjust
voltage
between
OCP
(+)
and
GND
(-)
to be
1.09
-
1.11Y
by
turning
VR2.
[Voltage
is
increased
by
turning
clockwise.
|
3.
Adjustment
of
VRI
(
Over
Voltage
Protection
circuit
)
Adjust
voltage
between
OVP
(+)
and
GND
(=)
to
be
@V
by
turning
VRI.
Woltage
is
decreased
by
turning
clockwise.
|
If
actual
measured
voltage
would
be
B,
a
can
be
calculated
as
following.
a=B
x
0.
0061

M9112
PC
BOARD
adjustment
MIKASA
M9112
©
sw
©
|
LHC
tés
am
1“
45
9
US
PII
o
u
+
Bo
18
Фо
ラ
je
一
metto]
=
(|
—
tê
Ce
~~
us
Or!
5
09
一
vi
4
RI
R45
る
の
が
È
ATI
ーー
AN
де
TH
ti
Yeo
ut
+
cis
HT
の ©
ns
一
一
.
一
一
cz
a
Ras
acs
^^^
cu
cis
~
vRI
ral
^
や
て
ーー
トー
H
一
V,
Så
e
|
μαμα
ο
zá
lo
YR
jE
x
mp
For]
=
c
$
cs
ono
BR
<
.
==
M
i
oli.
v7
ai
;
1
『
ms
Om
|
に
.
8
T2__GNDGlg
-
5
|=
)
18
|
»
C2
一
+
8
È
10
7330
€
一
=)
(>)
T
2
$0
3
Proy
23
E
“om
Rad
MA
smo
us
VRS
S
ea
y
28
ναι
+=
=~
πμ
ας
ΕΙ
πα
©
~
Py
ST
ml9
adire
os
MA
u?
>
ME
人
5)
O
y
em
1313
v
er
QE"
czo
İmara
———
e
31
m
on
э
vis
q
YR4EPSET
x
자
中
13
T
k
|
355,
4
TE
+
2
|
iz
VR
>
の
|
|
a
Sie
a
This
adjustment
has
to
be
done
after
connect
all
of
connectors
completely.
But
actual
exposure
is
not
necessary.
*
Each
PC
boards
delivered
from
Mikasa
Factory
have
already
been
adjusted
1.
Adjustment
of
FQI
Adjust
frequency
between
FQ]
(+)
and
GND(-)
to
be
120kHz
by
turning
VRI.
[Frequency
is
increased
by
turning
clockwise.
2.
Check
of
FQ2
Check
if
frequency
between
FQ2
(+)
and
GND(-)
is
90kHz
+5%.
3.
Adjustment
of
Pre-Heat
voltage
Adjust
voltage
between
PRE
(+)
and
GND(-)
to
be
0.
43V
by
turning
VR3
Voltage
is
increased
by
turning
clockwise.
|
4.
Set
VR4
(=EP
SET)
to
be
center.
6.
Set
VR5
(=IP
SET)
to
be
center.
-
10
-

5.
Readjustment
of
kV
This
adjustment
has
to
be
done
after
connect
all
of
connectors
completely
Actual
exposure
is
not
necessary.
Note
1:
This
adjustment
requires
that
an
exposure
be
made.
Please
observe
all
radiation
related
safety
precautions.
Note
2:
This
adjustment
must
be
done
whenever
an
insert
or
an
inverter
board
(M9101B
PCB)
is
replaced.
Equipment:
Dual
trace
storage
oscilloscope
and
DC
voltmeter.
Oscilloscope
settings:
Ep
@M9102B
Channel
1
|
Volt/Div.
Ip
@M9102B
Channel
2
0.5
Volt/Div
Time
10
mSec/Div
DC
Voltmeter:
Positive
prove
kV
@9102B
Negative
probe
chasis
ground
X-ray
unit
setting:
70kY
-
0.1
sec.
Adjustment
VR:
VR4
@M9112B
Check
the
kV by
oscilloscope,
and
adjust
average
of
peak
value
of
EP
wave
form
by
VR4
to
be
3.
4V.
After
the
adjustment,
set
X-ray
unit
to
100kV
and
adjust
average
of
peak
value
of
EP
wave
form
by
VR4
to
be
4.
4V.
CAUTION)
Check
the
kV
by
using
an
external
kV
tester
such
as
the
Victoreen
NERO.
And
do
not
adjust
over
100kV
as
kV
tester
has
deviation
of
+3kV
itself.
Adjust
between
97.5
て
99kV.
-
11-

5-1.
(Adjustment
of
70kV
by
turning
VR4]
Adjust
the CHI
Tek
Run:
SkS/s
4
Sample
1
ο
ο
eee
wee
em
et
eee
tae
5-2.
[Adjustment
of
100kV
by
turning
VR4
(EP)
by
VR4
to
be
4.9V
+0.5V.
Adjust
the
CHI
Tek
Run:
SkS/5
Sample
we
7
m
It
pent
Soe
taht
at
инь
l
vp
Ανω
K
риа
вне
азов
B
ré
or
ry
—
koz
9
(EP)
by
VR4
to
be
3.4V
+0.5Y.
kV
is
increased
by
turning
clockwise.
|
art
]
-
ーー・ーー…
ーーーーーーーー・
ーー
Chit
High
34V
Chi
Max
3.72V
+
QD
TE
TM
ZT
τν
kV
is
increased
by
turning
clockwise.
Chi
High
3.94
V
ChI
Max
6.7
V
-
15
-

6.
Readjustment
of
Pre-Heat
and
mA
This
adjustment
has
to
be
done
after
connect
all
of
connectors
completely.
Actual
exposure
is
necessary
Note
1:
This
adjustment
requires
that
an
exposure
be
made.
Please
observe
all
radiation
related
safety
precautions.
Note
2:
This
adjustment
must
be
done
whenever
an
insert
or
an
M9112
Board
is
replaced.
Equipment:
Dual
trace
storage
oscilloscope.
Oscilloscope
settings:
Ep
@M9112
Channel
I
1.0
Volt/Div.
Ip
@M9112
Channel
2
1.0
Volt/Div
Time
10
mSec/Div
X-ray
unit
setting:
60kY
-
0.1
sec.
80kY
-
0.1
sec.
Adjustment
VR:
VR3
@M9112
Set
kV
to
82kV・20mA.
Adjust
Pre-heat
time
to
30
msec
+10%.
[Pre-heat
time
is
decreased
by
turning
clockwise.
|
VR5
@M9112
Adjustment
of
mA.
Adjust
to
19mA.
-
13
-

6-1.
[Adjustment
of
Pre-heat
Time
by
turning
VR2-VR3|
1.
Pre-heat
Time
is
short.
Make
Pre-heat
Time
longer
by
turning
VR3
counterclockwise.
т
т
I |
1
1
!
1
ーーーーー
+
-----
+
ーー ニニ
ーー
レー
ニニ
ーー
トー ニニ
ーー
時
ニニ
ーー
ニー
トーー
ニ
ーー
キル
ニニ
ーー
ニー
キオ
ニニ
ーーー
キー
ニニ ニー
1 i
,
U
1
1
ἵ-----
ヒュ
ーー
ニー
ニー
トーー
ニ
ーー
ヒー
ニニ ーー
トーー
ニ
ーー
ニー
ニー
ニー
キー
ニニ
ーー
ネー
ニニ
ニニ
こも
ニニ
ーー
ニー
ネー
ニー
ニー ニー
1
1
!
{
giant
n
か
ーー
gie
piper.
i i
po.
rr
了----r-----r---~--r-----g-----r-----
1-----1-----1-----
1
bem
ーー
トー
ニニ
ニー
トー
ニニ
ーー
トー
ニー
ニオ
ト
<
ニー
ニキ
ーー
ここ
1
に
ーー ここ
|
ーー
トーーーーー
ト
ーーーーー
L-
bo
Ed
i
|
ーーー
ト
ーー
ニーー
トニ
ーー
ニー
ヒー
ニー
ニー
トー
ニーーー
ニ
ーー
ニー
と
ーー
ニーー
も
ニニ
ーー
ニュ
ーー
ニニ
ニー
タ
ーー
ニーーー
i
1
,
:
|
ーーーーー
benne
peer
ーーー
ト
ーー
ニー
ニー
キー
ニー
ニー
る
ニー
ニー
ニーー
トーーーーー
ャ
ーー
ニー
ニャ
ーー
ニー
ニー
ネー
ニーーー
1 1
a +
!
|
1
1
—
一
>
20msec
+
CH2
(IP)
+
GND
level
2.
Pre-heat
Time
is
long.
Make
Pre-heat
Time
shorter
by
turning
VR3
clockwise.
トー
ニー
ニー
ニー
—
4
Omsec—
3.
Pre-heat
Time
is
correct.
トニ
ーーーー
ト
ーー
ニー
ニー
シー
ニニ
ーー
に
レー
ニー ニー
|
ニー
ニー
テニ
ーー
ニー
ニー
ヒー
ニー
ニーーー
ヒ
ーー
ニー
ニー
に
ーー
ニニ
ーー
30msec
*
Acceptable
limit
20
msec
-
40
msec
-
14-
©
CH2
(IP)
+
GND
level
+
CH2
(IP)
を
GND
level

6-2.
lAdjustment
of
mA
by
turning
VRS)
X
Adjust
average
of
peak
value
of
IP
wave
form
to
be
1.
9V
by
turning
VRS.
XHF100:
80kV-20mA
|
-----
|
-----
|
-----
ее
----
"デー
=
に
キー
に
vr
za
İaşe
pde
p
maes
+
CHI
(E
P
)
—
+
CH2
(IP)
1
peo
1.9V
|
|.
1
«
GND
level
-
15
-

7.
Readjustment
of
exposure
time
This
adjustment
has
to
be
done
after
connect
all
of
connectors
completely.
Actual
exposure
is
necessary.
Note
1:
This
adjustment
requires
that
an
exposure
be
made.
Please
observe
all
radiation
related
safety
precautions.
Check
the
exposure
time
by
using
an
external
exposure
time
meter
such
as
the
VICTOREEN
NERO.
X-ray
unit
setting:
82kV
-
0.5
sec.
Adiustment:
Exposure
time
is
decreased
by
turning
clockwise.
(VR6
on
the
M3108A
PC
board)
-
16
-
This manual suits for next models
1
Table of contents
Popular Portable Generator manuals by other brands

Scheppach
Scheppach Special Edition SG3000 Translation from the original instruction manual

Omega
Omega BSG 3100R user guide

Anritsu
Anritsu MG3702xA Series Operation manual

Westinghouse
Westinghouse WGen9500DF user manual

Kohler
Kohler SDMO TECHNIC 6500 E C5 Instruction and maintenance manual

Nordmann Engineering
Nordmann Engineering AT 3000 D operating instructions

Clarke
Clarke G900 Operation & maintenance instructions

Briggs & Stratton
Briggs & Stratton 30239 owner's manual

unilab
unilab NFU 600 Notes for Use

Rohde & Schwarz
Rohde & Schwarz SMIQ03HD operating manual

SRS Labs
SRS Labs DC205 Operation and service manual

Broadcast Devices
Broadcast Devices SCA-100 Technical reference manual