
Table of contents
Maschinenfabrik Reinhausen GmbH 202045293079/01 ENVACUTAP® VM-Ex
4 Packaging, transport and storage .................................................................................. 36
4.1 Packaging ......................................................................................................................................... 36
4.1.1 Suitability.............................................................................................................................................................36
4.1.2 Markings..............................................................................................................................................................37
4.2 Transportation, receipt and handling of shipments........................................................................... 37
4.3 Storage of shipments........................................................................................................................ 38
4.4 Unpacking shipments and checking for transportation damages ..................................................... 39
5 Mounting ........................................................................................................................... 40
5.1 Installation information...................................................................................................................... 40
5.2 Preparatory work .............................................................................................................................. 41
5.2.1 Fitting mounting flange on transformer cover......................................................................................................41
5.2.2 Fitting stud bolts on mounting flange ..................................................................................................................41
5.3 Installing the on-load tap-changer in the transformer (standard version) ......................................... 42
5.3.1 Fastening on-load tap-changer to transformer cover ..........................................................................................42
5.3.2 Fastening VACUTAP® VM 300 to transformer cover .........................................................................................50
5.3.3 Connecting the tap winding and on-load tap-changer take-off lead....................................................................53
5.3.4 Performing transformer ratio test before drying ..................................................................................................63
5.3.5 Performing DC resistance measurement on transformer....................................................................................64
5.3.6 Drying on-load tap-changer in autoclave ............................................................................................................64
5.3.7 Drying on-load tap-changer in transformer tank..................................................................................................66
5.3.8 Filling the oil compartment of the on-load tap-changer with insulating fluid........................................................80
5.3.9 Performing transformer ratio test after drying .....................................................................................................81
5.4 Installing on-load tap-changer in transformer (bell-type tank version).............................................. 82
5.4.1 Inserting on-load tap-changer into supporting structure......................................................................................82
5.4.2 Connecting the tap winding and on-load tap-changer take-off lead....................................................................90
5.4.3 Performing transformer ratio test before drying ................................................................................................100
5.4.4 Performing DC resistance measurement on transformer..................................................................................101
5.4.5 Drying on-load tap-changer in autoclave ..........................................................................................................101
5.4.6 Lifting top part of on-load tap-changer head off supporting flange (bottom part) ..............................................103
5.4.7 Attaching the bell-type tank and connecting the on-load tap-changer to the top part of the on-load tap-changer
head ..................................................................................................................................................................111
5.4.8 Drying on-load tap-changer in transformer tank................................................................................................122
5.4.9 Filling the oil compartment of the on-load tap-changer with insulating fluid......................................................136
5.4.10 Performing transformer ratio test after drying ...................................................................................................137
5.5 Fitting protective devices and drive components............................................................................ 138
5.5.1 Electrically connecting the temperature sensor ................................................................................................138