Table of contents
Maschinenfabrik Reinhausen GmbH 202047545652/00 ENVACUTAP® VR-Ex
4 Packaging, transport and storage .................................................................................. 35
4.1 Packaging ......................................................................................................................................... 35
4.1.1 Suitability.............................................................................................................................................................35
4.1.2 Markings..............................................................................................................................................................36
4.2 Transportation, receipt and handling of shipments........................................................................... 36
4.3 Storage of shipments........................................................................................................................ 37
4.4 Unpacking shipments and checking for transportation damages ..................................................... 38
5 Mounting ........................................................................................................................... 39
5.1 Installation information...................................................................................................................... 39
5.2 Preparatory work .............................................................................................................................. 40
5.2.1 Fitting mounting flange on transformer cover......................................................................................................40
5.2.2 Fitting stud bolts on mounting flange ..................................................................................................................40
5.3 Installing the on-load tap-changer in the transformer (standard version) ......................................... 41
5.3.1 Fastening on-load tap-changer to transformer cover ..........................................................................................41
5.3.2 Connecting the tap winding and on-load tap-changer take-off lead....................................................................79
5.3.3 Performing transformer ratio test before drying ..................................................................................................86
5.3.4 Performing DC resistance measurement on transformer....................................................................................87
5.3.5 Drying on-load tap-changer in autoclave ............................................................................................................87
5.3.6 Drying on-load tap-changer in transformer tank..................................................................................................95
5.3.7 Filling the oil compartment of the on-load tap-changer with insulating fluid......................................................109
5.3.8 Performing transformer ratio test after drying ...................................................................................................110
5.4 Installing on-load tap-changer in transformer (bell-type tank version)............................................ 111
5.4.1 Inserting on-load tap-changer into supporting structure....................................................................................111
5.4.2 Connecting the tap winding and on-load tap-changer take-off lead..................................................................130
5.4.3 Performing transformer ratio test before drying ................................................................................................137
5.4.4 Performing DC resistance measurement on transformer..................................................................................138
5.4.5 Drying on-load tap-changer in autoclave ..........................................................................................................138
5.4.6 Lifting top part of on-load tap-changer head off supporting flange (bottom part) ..............................................147
5.4.7 Attaching the bell-type tank and connecting the on-load tap-changer to the top part of the on-load tap-changer
head ..................................................................................................................................................................151
5.4.8 Drying on-load tap-changer in transformer tank................................................................................................159
5.4.9 Filling the oil compartment of the on-load tap-changer with insulating fluid......................................................173
5.4.10 Performing transformer ratio test after drying ...................................................................................................174
5.5 Fitting protective devices and drive components............................................................................ 175
5.5.1 Electrically connecting the temperature sensor ................................................................................................175
5.5.2 Installing protective relay in piping and connecting...........................................................................................175