NEC 4xi NEC User manual

Extron • System 4
xixi
xixi
xi
Switcher Series • User’s Manual • P/N 68-413-02 Rev. E
Configuration and ConnectionsNEC Installation
SYSTEM 4xixi
xixi
xi
PROJECTOR COMMUNICATIONS KIT
ATTENTION!
PLEASE READ THIS DOCUMENT FOR IMPORTANT
INSTALLATION INSTRUCTIONS
THIS KIT HAS BEEN SHIPPED WITH THE FOLLOWING COMPONENTS:
Kit Type: NEC
Included Communications Adapter(s):
Quantity Part Number Description
1 26-472-01 ADP, UNV, “D”
1 26-458-01 ADP, NEC MT
1 26-494-01 ADP, UNV, “K”
1 26-467-01 ADP, UNV, “A”
THE TABLE BELOW LISTS THE POSSIBLE CONFIGURATION(S) AND CORRESPONDING
COMMUNICATIONS ADAPTER(S) FORYOUR PROJECTOR MANUFACTURER’S VARIOUS
MODELS. PLEASE NOTE THAT YOUR SWITCHER HAS BEEN CONFIGURED AS
INDICATED BY THE “✔”IN THE “CONFIG AS”COLUMN. IF YOUR PROJECTOR MODEL
DIFFERS FROM THIS CONFIGURATION, YOU MUST RECONFIGURE YOUR SWITCHER
WITH THE CORRECT SETTINGS.
PLEASE REFER TO THE FOLLOWING PAGES FOR COMPLETE CONFIGURATION AND
SIGNAL CONNECTION INSTRUCTIONS.
THIS SWITCHER HAS BEEN CONFIGURED FOR: NEC XG
CONFIG MODEL SW1 SW2 SW3 SW4 SW5 SW6 PROJ COMM
AS 1 2 3 4 CABLE ADAPTER
✔NEC XG off on on off 0 0 4 F 0 J9 26-472-01
NEC/Runco off on on off 0 0 7 5 0 J9 26-472-01
NEC MT Series off on off on 0 0 0 F 0 J15 26-458-01
NEC GT 2000 off on off on 0 0 4 E 0 J15 26-494-01
NEC host comm* off on off on 0 0 5 E 0 J15 26-467-01
NEC GT 1150 off on off on 0 0 5 E 0 J15 26-467-01
* As of printing: MT1045/1040, XT5000, VT440/540
Page 1

Extron •System 4
xixi
xixi
xi
Switcher Series •User’s Manual •P/N 68-413-02 Rev. E
NEC Installation Configuration and Connections
(Note: Information depends on
S
y
stem 4
x
i
setup.
)
(See note.)
(See note.)
(See note.)
(See note.)
[System 4
xi
model and software
version displayed here]
Page 2
}
SW1
ON
SW2
SW4
SW3 SW5
J9
34
12
Connecting System 4xixi
xixi
xi to NEC/Runco or NEC XG Projector
If the System 4xi is already configured for an NEC/Runco or NEC XG projector,
go to step 4. If it is not set up correctly, it will be necessary to change switch
settings on the System 4xi ’s Main Controller Board. Begin at Step 1 to verify the
correct configuration.
1. Use the Front Panel to display the Information Menu to verify that the System 4xi
is already set up for the NEC/Runco or NEC XG projector. Apply power to the
System 4xi and do the following:
a. Press to display the MENU SELECT on the LCD screen.
b. Press or to step to Menu 8.
c. Press to select this menu.
d. Press or to display the configuration. The example to the left is general,
yours will show the System 4xi model name, the software version and the
followinginformation:
PRJ = NEC (
or
NEC_XG
for XG model
)
PRJ BAUD = 9600
UNIT No. = 000
HST BAUD = 9600 (value depends upon setup Menu 3)
2. Go to the procedure on page 2-3 to remove the System 4xi cover and then go to
page 2-4 to set up the Main Controller board. Return to Step 3 (below) when the
configuration is correct.
Config Projector SW1: 1-2-3-4 SW2 SW3 SW4 SW5 SW6 Prj Cable Comm
as Adapter
NEC/Runco off-on-on-off 0 0 7 5 0 J9 26-472-01
✔NEC XG off-on-on-off 0 0 4 F 0 J9 26-472-01
System 4xi to NEC/Runco Configuration System 4xi to NEC XG Configuration
3. Double-check your work and be sure the System 4xi cover is on securely.
4. Install the System 4xi in its place of operation (i.e. rack), but not powered on.
__________ Changes in some switch configurations are not detected until the power is
removed at the AC cord, and then restored.
If the Projector Cable is wrongly connected to J15 on the Main Controller Board,
Menu 8 will not indicate the error.
Use the appropriate cable diagram on page 6 and continue.
5. The NEC Adapter (NC COM) has two male connectors, one 9-pin and one
15-pin. Plug the 15-pin male connector to the female connector marked
“Remote 1”on the NEC connector panel.
SW1
ON
SW2
SW4
SW3 SW5
J9
34
12

Extron •System 4
xixi
xixi
xi
Switcher Series •User’s Manual •P/N 68-413-02 Rev. E
Configuration and ConnectionsNEC Installation
6. Plug the 15-pin HD connector of the Projector Communications Extension cable
(shown as CC 50') into the PJ Comm port on the System 4xi. The other end has
a 9-pin female connector. Plug this into the other 9-pin male D connector on the
NC COM adapter.
______ Secure all of the connector screws.
7. Plug the (4 or 5) BNC connectors from one end of the (user-supplied) RGBS/HV
cable onto the System 4xi output and those on the other end onto the matching
BNCs on the NEC connector panel. See cable diagram.
8. Power up the projector and set the projector as follows:
•if your system has less than 10 inputs, set the projector to SW_Level 1 mode
•if your system has 10 or more inputs, set the projector to SW_Level 2 mode
9. Apply AC power to the System 4xi.
____________ For the NEC XG: always apply AC power to the projector and place it in Stand-
NEC Memory Assignments
by power
before applying AC power to the System 4
xi
. This procedure
must be
followed anytime AC power to the system has been interrupted or the CC cable
detached. Failure to follow this AC power up sequence will cause
communication errors.
The following two examples and accompanying tables provide information for
setting up the NEC projector (not the System 4xi). Please refer to the projector
documentation for further details.
The table on the right lists the Extron channel assignments and the
corresponding NEC host and peripheral slot
assignments using Extron System Switchers.
The physical location of the Extron channel
assignments will depend on the system
setup.
The tables and charts in the examples below
illustrate System Switcher channel
assignments for NEC models PG, PG+, PGX
and XG.
__________ System 4xi can support a maximum of 22
channels: 1 System 4xi
(
host
) looped to
multiple System 10 Switchers (
peripherals
).
Page 3
EXTRON
CHANNEL
NUMBER
NEC SLOT
ASSIGNMENT:
HOST
NEC SLOT
ASSIGNMENT:
PERIPHERALS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
M01
M01
M01
M01
M01
M01
M01
M01
M01
M01
M02
M02
M02
M02
M02
M02
M02
M02
M02
M02
M03
M03
M03
15
16
17
18
19
20
21
22
23
S01
S02
S03
S04
S05
S06
S07
S08
S09
S10
S01
S02
S03
S04
S05
S06
S07
S08
S09
S10
S01
S02
S03
96 M10 S06
97
98
99
100
M10
M10
M10
M10
S07
S08
S09
S10

Extron •System 4
xixi
xixi
xi
Switcher Series •User’s Manual •P/N 68-413-02 Rev. E
NEC Installation Configuration and Connections
Page 4
Example 1: System 4xi with SW4 ARMX or SW6 ARMX Switcher
and Projector in SW_LEVEL 1 Mode
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
NEC SLOT
ASSIGNMENT
(SW_LEVEL 1)
EXTRON
CHANNEL
NUMBER
NEC SLOT
ASSIGNMENT:
Host
(4) 5 6789
(M04) M05 M06 M07 M08 M09
NEC SLOT
ASSIGNMENT:
Peripherals
N/A N/A N/A N/A N/A N/A
{
*channels 8 and 9 available to SW6 ARMX only
(looped)
EXTRON
CHANNEL
NUMBER
NEC SLOT
ASSIGNMENT:
Host
1234
M01 M02 M03 M04
EXTRON SYSTEM 4 (Host)
NEC SLOT
ASSIGNMENT:
Peripherals
EXTREXTRONON SW4 ARMX or SW6 (Peripherals
N/A N/A N/A

Extron •System 4
xixi
xixi
xi
Switcher Series •User’s Manual •P/N 68-413-02 Rev. E
Configuration and ConnectionsNEC Installation
Page 5
Example 2: System 4xi with Multiple System 10 Plus* Switcher peripherals and Projector in
SW_LEVEL 2 Mode
* System 8 Plus could also be used as a peripheral
Projector Input Channel List
The NEC projector channel input numbers
correspond to the System 4xi input numbers. With
the projector's remote, press Operate, 4 (Input
Select). The Input Select information will display.
Selecting an input number (left column) will tell the
System 4xi to switch to the corresponding input
channel.
Channel List Display for an NEC Projector
System 4xixi
xixi
xi - NEC/Runco and NEC XG Projector Connections
Use the following diagrams as a guide when connecting the System 4xi to an
NEC/Runco or NEC XG projector. Refer to NEC/Runco or NEC XG
documentation to continue the installation.
EXTRON
CHANNEL
NUMBER
NEC SLOT
ASSIGNMENT:
Host
(4) 5 6 7 8 9 10 11 12 13
(M01) M01 M01 M01 M01 M01 M01 M02 M02 M02
EXTRON SYSTEM 10 (Peripheral 1)
NEC SLOT
ASSIGNMENT:
Peripheral
(S04) S05 S06 S07 S08 S09 S10 S01 S02 S03
EXTRON
CHANNEL
NUMBER
NEC SLOT
ASSIGNMENT:
Host
1234
M01 M01 M01
EXTRON SYSTEM 4 (Host)
NEC SLOT
ASSIGNMENT:
Periperal
S01 S02 S03 S04
(looped)
M01
EXTRON
CHANNEL
NUMBER
NEC SLOT
ASSIGNMENT:
Host
(13) 14 15 16 17 18 19 20 21 22
(M02) M02 M02 M02 M02 M02 M02 M02 M03 M03
EXTRON SYSTEM 10 (Peripheral 2)
NEC SLOT
ASSIGNMENT:
Peripheral
(S03) S04 S05 S06 S07 S08 S09 S10 S01 S02
(looped)
NEC SLOT
ASSIGNMENT
(SW_LEVEL 2)
Host
M01
M02
M03
M04
M05
M06
M07
M08
M09
M10
S01
S02
S03
S04
S05
S06
S07
S08
S09
S10
Peripheral
Operate
No
01
02
03
04
05
06
07
08
09
10
Name
NTSC 3.58
NTSC 4.43
PAL
SECAM
VGA480
Date
06/29/95
06/29/95
06/29/95
06/29/95
06/29/95
Input
Video
Video
Video
Video
RGB
4
(Input List)

Extron •System 4
xixi
xixi
xi
Switcher Series •User’s Manual •P/N 68-413-02 Rev. E
NEC Installation Configuration and Connections
Page 6
CC 50'
H/V
RGB
3,4 or 5 BNC
15-Pin
1234
ACAT Out R(Video) G(Y) B(C) VH/HV S-Video Remote 1 Remote 2
Video Option Out In
On/Off Input Select Enter
MultiSync XG
135
NEC Projector
15-Pin
Adapter
NC COMD
D
26-472-01
9-Pin
Female
Male
Male
Male
5
7
6
H/V
RGB
15-Pin
1234
Male
Adapter
NC COM
26-311-01
15-Pin HD
9-Pin
CC 50'
VideoS-VideoOption 1Remote1
Remote 2
NEC/Runco Projector
RG
BV
HV
3, 4 or 5 BNC
AC Input
Power
5
7
6
Female
Male
Male
Connecting the System 4
xixi
xixi
xi
to an NEC XG 135 Projector
Connecting the System 4
xixi
xixi
xi
to an NEC/Runco Projector
____________ In a rack mount, do NOT allow the weight of the cables to be supported by the
System 4xi. See page 2-5 for cabling guidelines.

Extron •System 4
xixi
xixi
xi
Switcher Series •User’s Manual •P/N 68-413-02 Rev. E
Configuration and ConnectionsNEC Installation
Page 7
(Note: Information depends on
S
y
stem 4
x
i
setup.
)
(See note.)
(See note.)
(See note.)
(See note.)
[System 4
xi
model and software
version displayed here]
Connecting System 4xixi
xixi
xi to NEC MT Series Projector
If the System 4xi is already configured for an NEC MT Series projector, go to
step 4. If it is not set up correctly, it will be necessary to change switch settings
on the System 4xi ’s Main Controller Board. Begin at Step 1 to verify the correct
configuration.
1. Use the Front Panel to display the Information Menu to verify that the System 4xi
is already set up for the NEC MT Series projector. Apply power to the System 4xi
and do the following:
a. Press to display the MENU SELECT on the LCD screen.
b. Press or to step to Menu 8.
c. Press to select this menu.
d. Press or to display the configuration. The example to the left is general,
yours will show the System 4xi model name, the software version and the
followinginformation:
PRJ = NEC_MT
PRJ BAUD = 9600
UNIT No. = 000
HST BAUD = 9600 (value depends upon setup Menu 3)
2. Go to the procedure on page 2-3 to remove the System 4xi cover and then go to
page 2-4 to set up the Main Controller board. Return to Step 3 (below) when the
configuration is correct.
Config Projector SW1: 1-2-3-4 SW2 SW3 SW4 SW5 SW6 Prj Cable Comm
as Adapter
NEC MT Series off-on-on-off 0 0 0 F 0 J15 26-458-01
3. Double-check your work and be sure the System 4xi cover is on securely.
4. Install the System 4xi in its place of operation (i.e. rack), but not powered on.
__________ Changes in some switch configurations are not detected until the power is
removed at the AC cord, and then restored.
If the Projector Cable is wrongly connected to J9 on the Main Controller Board,
Menu 8 will not indicate the error.
Use the following connection diagram and continue.
5. The NEC Adapter (NC COM) has two male connectors, one 9-pin and one
15-pin. Plug the 15-pin male connector to the female connector marked
“Remote 1”on the NEC connector panel.
}
SW1
ON
SW2
SW4
SW3 SW5
J15
34
12

Extron •System 4
xixi
xixi
xi
Switcher Series •User’s Manual •P/N 68-413-02 Rev. E
NEC Installation Configuration and Connections
System 4xixi
xixi
xi - NEC MT Series Projector Connections
Use the diagram below as a guide when connecting the System 4xi to the NEC
MT Series Projector. Refer to NEC documentation to continue the installation.
Connecting the System 4
xixi
xixi
xi
to the NEC MT-1000 Projector
____________ In a rack mount, do NOT allow the weight of the cables to be supported by the
System 4
xi
. See page 2-5 for cabling guidelines.
__________ System 4
xi
channel numbers correspond to the projector’s “Group”numbers.
Page 8
6. Plug the 15-pin HD connector of the Projector Communications Extension cable
(shown as CC 50') into the PJ Comm port on the System 4xi. The other end has
a 9-pin female connector. Plug this into the other 9-pin male D connector on the
NEC COM adapter.
______ Secure all of the connector screws.
7. Plug the (4 or 5) BNC connectors from one end of the (user-supplied) RGBS/HV
cable onto the System 4xi output and those on the other end onto the matching
BNCs on the NEC connector panel. See cable diagram.
8. Power up the projector and set the projector as follows:
•if your system has less than 10 inputs, set the projector to SW_Level 1 mode
•if your system has 10 or more inputs, set the projector to SW_Level 2 mode
9. Apply AC power to the System 4xi.
RGBHV 5 BNC
15-Pin
Male
9-Pin Male
NEC-LCD
Adapter
26-458-01
9-Pin Female
SY-VGA
26-173-01
15-Pin Male
OUTPUT
PJ COMM
RS 232
AUDIO AUDIO AUDIO AUDIO AUDIO
H/HV
R/C G/Y BR/C G/Y B
V
INPUT 4
H/HV V
R/C G/Y B
INPUT 3
H/HV V
R/C G/Y B
INPUT 2
H/HV V
R/C G/Y B
INPUT 1
H/HV V

Extron •System 4
xixi
xixi
xi
Switcher Series •User’s Manual •P/N 68-413-02 Rev. E
Configuration and ConnectionsNEC Installation
Page 9
(Note: Information depends on
S
y
stem 4
x
i
setup.
)
(See note.)
(See note.)
(See note.)
(See note.)
[System 4
xi
model and software
version displayed here]
Connecting System 4xixi
xixi
xi to NEC GT 2000 (or equivalent) Projector
If the System 4xi is already configured for an NEC GT 2000 projector, go to step
4. If it is not set up correctly, it will be necessary to change switch settings on the
System 4xi’s Main Controller Board. Begin at Step 1 to verify the correct
configuration.
1. Use the Front Panel to display the Information Menu to verify that the System 4xi
is already set up for the NEC GT 2000 projector. Apply power to the System 4xi
and do the following:
a. Press to display the MENU SELECT on the LCD screen.
b. Press or to step to Menu 8.
c. Press to select this menu.
d. Press or to display the configuration. The example to the left is general,
yours will show the System 4xi model name, the software version and the
followinginformation:
PRJ = NEC_GT
PRJ BAUD = 9600
UNIT No. = 000
HST BAUD = 9600 (value depends upon setup Menu 3)
2. Go to the procedure on page 2-3 to remove the System 4xi cover and then go to
page 2-4 to set up the Main Controller board. Return to Step 3 (below) when the
configuration is correct.
Config Projector SW1: 1-2-3-4 SW2 SW3 SW4 SW5 SW6 Prj Cable Comm
as Adapter
NEC GT 2000 off-on-on-off 0 0 4 E 0 J15 26-494-01
3. Double-check your work and be sure the System 4xi cover is on securely.
4. Install the System 4xi in its place of operation (i.e. rack), but not powered on.
__________ Changes in some switch configurations are not detected until the power is
removed at the AC cord, and then restored.
If the Projector Cable is wrongly connected to J9 on the Main Controller Board,
Menu 8 will not indicate the error.
Use the following connection diagram and continue.
}
SW1
ON
SW2
SW4
SW3 SW5
J15
34
12

Extron •System 4
xixi
xixi
xi
Switcher Series •User’s Manual •P/N 68-413-02 Rev. E
NEC Installation Configuration and Connections
Page 10
5. The NEC Com Adapter (26-494-01) has two male connectors, one 9-pin and one
15-pin. Plug the 15-pin male connector to the female connector marked
“REMOTE 2/PC”on the NEC connector panel.
6. Plug the 15-pin HD connector of the Projector Communications Extension cable
(shown as CC 50') into the PJ Comm port on the System 4xi. The other end has
a 9-pin female connector. Plug this into the other 9-pin male D connector on the
NEC COM adapter.
______ Secure all of the connector screws.
7. Plug the (4 or 5) BNC connectors from one end of the (user-supplied) RGBS/HV
cable onto the System 4xi output and those on the other end onto the matching
BNCs on the NEC connector panel. See cable diagram.
8. Power up the projector and set the projector as follows:
•if your system has less than 10 inputs, set the projector to SW_Level 1 mode
•if your system has 10 or more inputs, set the projector to SW_Level 2 mode
9. Apply AC power to the System 4xi.
System 4xixi
xixi
xi - NEC GT 2000 Projector Connections
Use the diagram below as a guide when connecting the System 4xi to the NEC
GT 2000 Projector. Refer to NEC documentation to continue the installation.
Connecting the System 4xi to the NEC GT 2000 Projector
____________ In a rack mount, do NOT allow the weight of the cables to be supported by the
System 4
xi
. See page 2-5 for cabling guidelines.
__________ System 4
xi
channel numbers correspond to the projector’s “Group”numbers.
RGBHV 5 BNC
15-Pin
Male
9-Pin Female
CC 50'
9-Pin Male
COM Adapter
P/N 26-494-01
"K"
15-Pin Male
OUTPUT
PJ COMM
RS 232
AUDIO AUDIO AUDIO AUDIO AUDIO
H/HV
R/C G/Y BR/C G/Y B
V
INPUT 4
H/HV V
R/C G/Y B
INPUT 3
H/HV V
R/C G/Y B
INPUT 2
H/HV V
R/C G/Y B
INPUT 1
H/HV V
○ ○ ○ ○○○○○○○○
○○○○○○○○○○○○
○ ○ ○○○○○○○○○○○○○○○○○○○○○○○○○

Extron •System 4
xixi
xixi
xi
Switcher Series •User’s Manual •P/N 68-413-02 Rev. E
Configuration and ConnectionsNEC Installation
Page 11
(Note: Information depends on
S
y
stem 4
x
i
setup.
)
(See note.)
(See note.)
(See note.)
(See note.)
[System 4
xi
model and software
version displayed here]
Connecting System 4xixi
xixi
xi to NEC XT 5000 (or equivalent) Projector
If the System 4xi is already configured for an NEC XT 5000 projector, go to step
4. If it is not set up correctly, it will be necessary to change switch settings on the
System 4xi’s Main Controller Board. Begin at Step 1 to verify the correct
configuration.
1. Use the Front Panel to display the Information Menu to verify that the System 4xi
is already set up for the NEC XT 5000 projector. Apply power to the System 4xi
and do the following:
a. Press to display the MENU SELECT on the LCD screen.
b. Press or to step to Menu 8.
c. Press to select this menu.
d. Press or to display the configuration. The example to the left is general,
yours will show the System 4xi model name, the software version and the
followinginformation:
PRJ = NEC 10XX
PRJ BAUD = 38400
UNIT No. = 000
HST BAUD = 9600 (value depends upon setup Menu 3)
2. Go to the procedure on page 2-3 to remove the System 4xi cover and then go to
page 2-4 to set up the Main Controller board. Return to Step 3 (below) when the
configuration is correct.
Config Projector SW1: 1-2-3-4 SW2 SW3 SW4 SW5 SW6 Prj Cable Comm
as Adapter
NEC XT 5000 (host control) off-on-on-off 0 0 5 E 0 J15 26-467-01
3. Double-check your work and be sure the System 4xi cover is on securely.
4. Install the System 4xi in its place of operation (i.e. rack), but not powered on.
__________ Changes in some switch configurations are not detected until the power is
removed at the AC cord, and then restored.
If the Projector Cable is wrongly connected to J9 on the Main Controller Board,
Menu 8 will not indicate the error.
Use the following connection diagram and continue.
SW1
ON
SW2
SW4
SW3 SW5
J15
34
12
}

Extron •System 4
xixi
xixi
xi
Switcher Series •User’s Manual •P/N 68-413-02 Rev. E
NEC Installation Configuration and Connections
Page 12
5. The NEC Com Adapter (26-467-01) has two male connectors, both 9-pin. Plug
one end to the female connector marked “OPTION IN”on the NEC connector
panel.
6. Plug the 15-pin HD connector of the Projector Communications Extension cable
(shown as CC 50') into the PJ Comm port on the System 4xi. Plug the 9-pin
female connector into the other 9-pin male D connector on the NEC COM
adapter.
______ Secure all of the connector screws.
7. Plug the (4 or 5) BNC connectors from one end of the (user-supplied) RGBS/HV
cable onto the System 4xi output and those on the other end onto the matching
BNCs on the NEC connector panel. See cable diagram.
8. Power up the projector and set the projector as follows:
•if your system has less than 10 inputs, set the projector to SW_Level 1 mode
•if your system has 10 or more inputs, set the projector to SW_Level 2 mode
9. Apply AC power to the System 4xi.
System 4xixi
xixi
xi - NEC XT 5000 Projector Connections
Use the diagram below as a guide when connecting the System 4xi to the NEC
XT 5000 Projector. Refer to NEC documentation to continue the installation.
Connecting the System 4xi to the NEC XT 5000 Projector
____________ In a rack mount, do NOT allow the weight of the cables to be supported by the
System 4
xi
. See page 2-5 for cabling guidelines.
__________ System 4
xi
channel numbers correspond to the projector’s “Group”numbers.
CC 50'
15-Pin HD
9-Pin
Adapter
NC COM
26-467-01
A
A
9-Pin
Male
Female
Male
Male
RGBHV 5 BNC
CC 50'
OUTPUT
PJ COMM
RS 232
AUDIO AUDIO AUDIO AUDIO AUDIO
H/HV
R/C G/Y BR/C G/Y B
V
INPUT 4
H/HV V
R/C G/Y B
INPUT 3
H/HV V
R/C G/Y B
INPUT 2
H/HV V
R/C G/Y B
INPUT 1
H/HV V
This manual suits for next models
4
Other NEC Cables And Connectors manuals
Popular Cables And Connectors manuals by other brands

Tripp Lite
Tripp Lite N201-007-BL Specifications

Tripp Lite
Tripp Lite N001-025-GY-R Specifications

Tripp Lite
Tripp Lite N320-15M-RD Specification sheet

Tripp Lite
Tripp Lite N506-05M Specification sheet

Tripp Lite
Tripp Lite Yellow Cat6 Snagless Patch Cable N201-020-YW Specifications

HQ Power
HQ Power VDPSPxN Series user manual

Tripp Lite
Tripp Lite 037332268655 owner's manual

Tripp Lite
Tripp Lite N424-01M Specification sheet

Tripp Lite
Tripp Lite N370-02M Specification sheet

FRONIUS
FRONIUS OPT/i TPS SpeedNet Connector installation instructions

Tripp Lite
Tripp Lite B116-A03 owner's manual

Inakustik
Inakustik 004245114 user manual