
2
• This covers faulty goods. Visit newline.nz for details.
• Installation instructions must be followed for the warranty to be valid.
HEALTH AND SAFETY
BEFORE YOU START
ATTENTION
WARRANTY
1. Unpack glass, stand on soft packing on oor and walls prior to assembly.
2. Do not rework glass panels. Avoid striking any edge as toughened glass will
explode.
3. Two persons for heavy glass lifting especially tting/installing into channels.
4. Wear appropriate protective clothing, gloves, and eye protection during installation.
1. Aluminium Channels must be fully protected against scratches and abrasions.
2. Channels are inspected and packed in a plastic tube for you to check. Do not install
any channel that has a defect.
3. Apply a protection tape to the faces of the wall channels before you start.
4. It is the installer’s responsibility that all installation complies with council regulations.
5. Tape down cardboard packaging on Tile Tray to protect against tool or other potential
impacts or contamination.
ASTON HINGED DOOR INTRODUCTION
TOOLS AND MATERIALS REQUIRED
PARTS SUPPLIED
Glass Panels • Wall & Floor Channel Set • Bostik V60 • Hinges & Hardware • Glass Packer
Set • 2 Connector Angles
2
3
1. It is required that the installer must be skilled in this this type of installation.
2. The Tray Base, Plumbing, Waterproong, Water Stops and Tiling must be
compliant with all regulations and are not included in this document.
3. The walls must be a 3mm maximum variation to plumb up to the shower height.
The oor must have a maximum variation of 3mm to level within shower.
4. The ordered Shower Specication must be matched to your Tray Design.
5. Read these current instructions through, familiarise yourself with all aspects of
installation, tools & equipment required, and materials used.
2M
Silicone
Tape
Cleaning
Rags
Self-Adhesive
Blocks