
2
TABLE OF CONTENTS
IMPORTANT SAFETY INFORMATION.............................. 3
REQUIREMENTS & CODES .............................................. 4
GENERAL INFORMATION................................................. 5
Before you install this unit............................................................ 5
Locating the Equipment ............................................................... 5
Heating Load................................................................................ 5
COMBUSTION AIR & VENTING REQUIREMENTS .......... 6
Vent Termination.......................................................................... 7
CIRCULATING AIR SUPPLY ............................................. 8
Air Ducts ...................................................................................... 8
Unconditioned Spaces................................................................. 8
Acoustical Duct Work................................................................... 8
UNIT INSTALLATION......................................................... 9
Packaging Removal..................................................................... 9
Rigging & Hoisting ....................................................................... 9
Clearances to Combustible Materials .......................................... 9
Ground Level ............................................................................... 9
Rooftop ........................................................................................ 9
Horizontal to Downflow Conversion ............................................. 10
Condensate Drain (Air Conditioning) ........................................... 10
Air Filter Requirements ................................................................ 11
Installing Filters in the Internal Filter Rack ................................... 11
1” to 2” Filter Conversion......................................................... 11
Removing Filters from Internal Filter Rack................................... 11
ELECTRICAL WIRING ....................................................... 12
Pre-Electrical Checklist................................................................ 12
Grounding .................................................................................... 12
Line Voltage................................................................................. 12
Thermostat / Low Voltage Connections....................................... 13
2-Stage Heat / 1-Stage Cool Thermostat ................................ 13
Single Stage Heat / Single Stage Cool Thermostat ................ 13
Heat Anticipator ........................................................................... 13
Cooling Configurations................................................................. 13
Heating Configurations ................................................................ 13
Blower Speed............................................................................... 13
Configuring the Fixed Speed Blower....................................... 14
Selecting Cooling Airflow......................................................... 14
Selecting Heating Airflow ........................................................ 14
Dehumidification Options............................................................. 14
Optional Furnace Control Board Connections ............................. 14
Electronic Air Cleaner.............................................................. 14
Humidifier ................................................................................ 14
GAS SUPPLY & PIPING..................................................... 15
Leak Check.................................................................................. 15
High Altitude Conversion - Natural Gas ....................................... 16
LP / Propane Gas Conversion ..................................................... 16
START UP & ADJUSTMENTS........................................... 17
Pre-Start Check List..................................................................... 17
Start-Up Procedure...................................................................... 17
Air Circulation .......................................................................... 17
Lighting the Appliance ............................................................. 17
Verifying System Heating ........................................................ 18
Verifying & Adjusting Temperature Rise ................................. 18
Gas Supply Pressure Verification & Adjustment ..................... 18
Verifying the Firing Rate of the Appliance ............................... 18
Measuring the Manifold Pressure............................................ 19
Adjusting the Manifold Pressure.............................................. 19
Removing the Manometer/Pressure Gauge............................ 19
Verifying Over-Temperature Limit Control Operation.............. 19
Verifying Burner Operation...................................................... 19
Verifying System Cooling ........................................................ 21
OPERATING SEQUENCE.................................................. 22
Heating Mode............................................................................... 22
Thaw Cycle Start Up / Shutdown................................................. 23
Blocked Vent / Condensate Disposal Shut Down........................ 23
Cooling Mode - Single Stage Operation ...................................... 23
De-Humidification Control............................................................ 23
Fan Mode..................................................................................... 23
COMPONENT FUNCTIONS ............................................... 23
EQUIPMENT MAINTENANCE............................................ 24
Heat Exchanger & Burner Maintenance ...................................... 24
Cleaning of Burners ..................................................................... 25
REPLACEMENT PARTS.................................................... 25
TROUBLESHOOTING........................................................ 25
Cooling Mode............................................................................... 25
Heating Mode............................................................................... 25
FIGURES & TABLES.......................................................... 26
Figure 8. Unit Dimensions ....................................................... 26
Table 7. Center of Gravity & Shipping Weights....................... 27
Airflow Information.................................................................... 28
Table 8. Cooling Airflow Settings ............................................ 28
Table 9. Heating Airflow Settings ............................................ 28
Table 10. Blower Performance - 2 & 2.5 Ton .......................... 29
Table 11. Blower Performance - 3 Ton ................................... 30
Table 12. Blower Performance - 3.5 Ton ................................ 31
Table 13. Blower Performance - 4 & 5 Ton ............................. 32
Gas Information ......................................................................... 33
Table 14. Gas Pipe Capacities................................................ 33
Table 15. Gas Flow Rates....................................................... 33
Figure 9. Gas Valve Label....................................................... 34
Electrical Data ............................................................................ 35
Table 16. Electrical Data. ........................................................ 35
Table 17. Copper Wire Size .................................................... 35
Table 18. Thermostat Wire Gauge .......................................... 35
Electrical Diagrams.................................................................... 36
Figure 10. Two Stage Heating / Single Stage Cooling
Configuration.......................................................... 36
Figure 11. Fixed Speed Motor Control Board.......................... 36
Figure 12. Ignition Control Board - 624817 ............................. 36
Wiring Diagrams ........................................................................ 37
Figure 13. Single Phase, 2-5 Ton, 208/230V ......................... 37
Charging Charts......................................................................... 38
Figure 14. Charging Chart for 2 Ton Units .............................. 38
Figure 15. Charging Chart for 2.5 Ton Units ........................... 38
Figure 16. Charging Chart for 3 Ton Units .............................. 39
Figure 17. Charging Chart for 3.5 Ton Units ........................... 39
Figure 18. Charging Chart for 4 Ton Units .............................. 40
Figure 19. Charging Chart for 5 Ton Units .............................. 40
Internal Filter Conversion ......................................................... 41
Figure 20. Filter Comversion ................................................... 41
APPENDIX A - HEAT EXCHANGER CONDENSATE
DRAIN & VENT KIT (HORIZONTAL MOUNT
APPLICATIONS)................................................................. 42
About the Kit ................................................................................ 42
Vent Pipe & Drain Hose Assembly .............................................. 42
Vertical Drain Pit Method ............................................................. 42
Preparing the pit ...................................................................... 43
Percolation Test (Optional)...................................................... 43
Vertical Drain Pipe Installation ................................................ 43
Horizontal Drain Trench Method.................................................. 43
Preparing the Trench............................................................... 44
Horizontal Drain Pipe Installation ............................................ 44
Completing the Vent Installation .................................................. 44
APPENDIX B - HEAT EXCHANGER CONDENSATE
DRAIN & VENT KIT (ROOF CURB MOUNT
APPLICATIONS)................................................................. 46
About the Kit ................................................................................ 46
Before Setting unit on the Curb.................................................... 46
Setting the Unit ............................................................................ 47
Completing the Heat Exchanger Condensate Drain Installation.. 47
Condensate Disposal................................................................... 47
Completing the Vent Pipe Installation and Assembly .................. 47
INSTALLATION CHECKLIST............................................. 52