Parklio CHAIN User manual

01| Page
www.parklio.com | info@parklio.com | +385977247276
Hercegovacka 78, 21 000 Split | Commercial Court in Split | MBS: 060323069 | Raieisen Bank,
Zagreb, Petrinjska 59 | IBAN: HR7724840081107194017 | VAT: HR60755958894
PARKLIO™ CHAIN USER MANUAL
PARKLIO™ CHAIN
USER MANUAL

02 | Page
www.parklio.com | info@parklio.com | +385977247276
Hercegovacka 78, 21 000 Split | Commercial Court in Split | MBS: 060323069 | Raieisen Bank,
Zagreb, Petrinjska 59 | IBAN: HR7724840081107194017 | VAT: HR60755958894
PARKLIO™ CHAIN USER MANUAL
Thank you for the condence you have shown us by purchasing our product.
Pleasereadthismanualfirst!
Dear Customers,
We hope that all your expectations of this product will be fullled. Parklio™
Chain
is manufactured using the latest technologies and has undergone rigorous
quality control
procedures.
TheUserGuide illhelpyouuseyourproductquicklyandsafely.
• Read the user manual before installing and using your product.
• Always follow the safety instructions.
• Keep this user manual at hand for future reference.

03 | Page
www.parklio.com | info@parklio.com | +385977247276
Hercegovacka 78, 21 000 Split | Commercial Court in Split | MBS: 060323069 | Raieisen Bank,
Zagreb, Petrinjska 59 | IBAN: HR7724840081107194017 | VAT: HR60755958894
PARKLIO™ CHAIN USER MANUAL
1. Layout ......................................................................................................................................... 04
2. Configuration .......................................................................................................................... 05
3. Electrical connections ......................................................................................................... 06
4. Enabling and disabling the pre-flashing, photocell test and multi-user
function............................................................................................................................................... 07
5. Problems and their solutions........................................................................................... 08
6. Description and dimension of the column ................................................................. 09
7. Installation ................................................................................................................................ 10
7.1. Preliminary controls............................................................................................................... 10
7.2. Installation of the column.............................................................................................. 10
8. Maintenance plan (every 6 months)..................................................................................... 11
9. Connectingof thebrakingjoint.................................................................................................. 11
10. Technical Data ............................................................................................................................ 12
TABLE OF CONTENTS

04 | Page
www.parklio.com | info@parklio.com | +385977247276
Hercegovacka 78, 21 000 Split | Commercial Court in Split | MBS: 060323069 | Raieisen Bank,
Zagreb, Petrinjska 59 | IBAN: HR7724840081107194017 | VAT: HR60755958894
PARKLIO™ CHAIN USER MANUAL
1. LAYOUT
Length of the chain (m) 4 6 8 10 12 14 16 18 20
Relative height in
the middle X (cm)
75 70 65 60 55 50 45 40 35
1. Parking post
2. Control unit
3. Prole for the chain
4. Chain
Attention: The value in the table has been determinated using a
chain of 400 grams/meter

05 | Page
www.parklio.com | info@parklio.com | +385977247276
Hercegovacka 78, 21 000 Split | Commercial Court in Split | MBS: 060323069 | Raieisen Bank,
Zagreb, Petrinjska 59 | IBAN: HR7724840081107194017 | VAT: HR60755958894
PARKLIO™ CHAIN USER MANUAL
2. CONFIGURATION
Action is a control unit dedicated to the movement of the chain barrier with 24Vdc
motor. The coexistence of various types of safeties such as the control of the
absorbed power by the motor and the velocity of the motor allows a rapid
intervention of the anti – squeezing security (sense). Through the encoder present
in the motor it is possible to control the exact position of the chain and to use it
without mechanical limit switches. The control unit has inputs for mechanical limit
switches, for the step by step button, for the pedestrian opening, for the safety
photocells and the output for ashing light 24 Vac. The unit also allows the
regulation by trimmer both the automatic re-closure and the motor force. Action
can control motors at 24 – 30 Vcc with a maximum consumption of 7A.

08 | Page
www.parklio.com | info@parklio.com | +385977247276
Hercegovacka 78, 21 000 Split | Commercial Court in Split | MBS: 060323069 | Raieisen Bank,
Zagreb, Petrinjska 59 | IBAN: HR7724840081107194017 | VAT: HR60755958894
PARKLIO™ CHAIN USER MANUAL
5. PROBLEMS AND THEIR SOLUTIONS

06 | Page
www.parklio.com | info@parklio.com | +385977247276
Hercegovacka 78, 21 000 Split | Commercial Court in Split | MBS: 060323069 | Raieisen Bank,
Zagreb, Petrinjska 59 | IBAN: HR7724840081107194017 | VAT: HR60755958894
PARKLIO™ CHAIN USER MANUAL
3. ELECTRICAL CONNECTIONS

07 | Page
www.parklio.com | info@parklio.com | +385977247276
Hercegovacka 78, 21 000 Split | Commercial Court in Split | MBS: 060323069 | Raieisen Bank,
Zagreb, Petrinjska 59 | IBAN: HR7724840081107194017 | VAT: HR60755958894
6.1 Pre-flashing: The chain movement is always signalized by a pre-blinking, advising the user that the chain is next to
move.
6.2 Multi-user function: During the opening phase of the chain, every other command is ignored. Once opened the chain
(completely down, it is possible to close it using the step-by-step command or using the automatic re-closure. During the
closing phase, a step-by-step command blocks and inverts the movement.
6.3 Photocell test: Every time the motor is switched on, the control unit automatically controls if the photocells are
functioning properly.
This operation increases the security system. If a photocell is damaged (for instance output relay stuck) or in case of
undesired photocell input short
circuit. This test is executed immediately after that the control unit has received an order of “moving“, but before
power is applied to the motor.
PARKLIO™ CHAIN USER MANUAL
4. ENABLING AND DISABLING THE PRE-FLASHING,
PHOTOCELL TEST AND THE MULTI-USER FUNCTION
To modify the status of any of these functions it is necessary to enable the setting mode. In the phase of learning the control
unit automatically goes through all possible functions in which it is possible to intervene. The led of the ashing light signals the
selected function each time with a variable number of ashings. The passage from a function to another one is executed
automatically (it is enough to maintain always pressed the red button). The control unit starts selecting the rst function
(signaled by 1 ashing), successively, keeping pressed the red button you pass at the second function ( signaled by 2 ashings)
and so on. To enable the setting / learning mode proceed as follows:
1. Raise the chain to its upper position (completely closed).
2. Press and keep pressed the red button
3. After 4 - 5 seconds the led of the ashing - light executes a series of 8 ashings (notifying the next entry to the learning mode).
Once the series of ashings end the control unit is in the learning mode. Do not release the red button yet.
4. Once individualized (through the number of ashings of the ashing-light led) the function that you want to modify, release
the red button. This way the function is selected. Once selected the function, the control unit puts in evidence the setting by
ashing with a slow frequency ( 1 ashing /second) or with a rapid frequency ( 2 ashings / second) as pointed out on the next
table:
5. Press now the button ( see table) correspondent to the new status you wish set for the selected function. The frequency of
flashing will vary ac- cording to the chosen mode.
At this point it is possible to modify further functions or, if you have nished, go out from the setting phase. In case you want to
modify other functions, press and keep pressed the red button. After few seconds, the control unit will start again to select in
sequence the several functions. Instead if you want to exit from the learning mode, it is sufcient to bring the lever of the
selector Sw1 in manual position, wait 1-2 sec and successively report it in automatic position. In this way, the control unit gets
out of the learning mode and prepares itself for the normal functioning.

09 | Page
www.parklio.com | info@parklio.com | +385977247276
Hercegovacka 78, 21 000 Split | Commercial Court in Split | MBS: 060323069 | Raieisen Bank,
Zagreb, Petrinjska 59 | IBAN: HR7724840081107194017 | VAT: HR60755958894
PARKLIO™ CHAIN USER MANUAL
6.DESCRIPTIONAND DIMENSION OF THE COLUMN
1. Column
2. Gear motor with encoder
3. Control unit
4. Auto blocking nut M10
5. Washer 20x10
6. Backing plate
7. Screw M10x70
8. Anterior cover
9. Posterior cover
10. Closing screw M5x10

10 | Page
www.parklio.com | info@parklio.com | +385977247276
Hercegovacka 78, 21 000 Split | Commercial Court in Split | MBS: 060323069 | Raieisen Bank,
Zagreb, Petrinjska 59 | IBAN: HR7724840081107194017 | VAT: HR60755958894
PARKLIO™ CHAIN USER MANUAL
7.INSTALLATION
All measures are expressed in millimeters unless otherwise indicated.
1. Control the stability and solidity of the zone where the columns are
going to be xed.
2. Use an omni-polar interrupter with contact distance of at least 3mm.
3. The connection to the power supply must be separated than the
connections to the security and commanding devices
1. Screw in for 1,5 - 2,0 cm the 4 screws M10x70 in dotation to the base.
2. Place the base on the previously prepared base of cement (Fig.3)
3. The upper part of the base should be clean and perfectly horizontal.
4. Pass the plastic tubes of the cables through the central opening on the
base and check again the stability of the base.
5. Unscrew the 8 screws [10] take off the frontal [8] and the rear cover [9] of
the column (Fig. 4 )
6. Place now the column structure on the base.
7. Fix now the column to the base with the 4 washers [5] and 4 nuts [4].
8. Fix the frontal covers [8] of both columns with 4 screws [10].
9. Now you can x the chain to the apposite holes on both columns
respecting the level X in the middle of the chain barrier indicated at the
table on page 1 (Fig. 5 )
7.1. PreliminaryControl
7.2. InstallationoftheColumn(Fig.1,Fig.2,Fig.4)

11 | Page
www.parklio.com | info@parklio.com | +385977247276
Hercegovacka 78, 21 000 Split | Commercial Court in Split | MBS: 060323069 | Raieisen Bank,
Zagreb, Petrinjska 59 | IBAN: HR7724840081107194017 | VAT: HR60755958894
PARKLIO™ CHAIN USER MANUAL
8.MAINTENANCEPLAN(EVERY6MONTHS)
9.CONNECTIONOFTHEBRAKINGJOINT
1. Cut the power supply off or disconnect the batteries if present. Clean and
grease the guide internally.
2. See if there are wired parts and replace these if necessary.
3. Grease the internal transmitting chain.
4. Check the xation nuts.
5. Control the electrical connections
6. Supply the power again.Check out the correct functioning of the obstacle
recognition ( encoder system ).
7. Check out the correct functioning of all and of the security commands.
STEP1
STEP2
STEP 3

Power supply
12 | Page
www.parklio.com | info@parklio.com | +385977247276
Hercegovacka 78, 21 000 Split | Commercial Court in Split | MBS: 060323069 | Raieisen Bank,
Zagreb, Petrinjska 59 | IBAN: HR7724840081107194017 | VAT: HR60755958894
PARKLIO™ CHAIN USER MANUAL
10.TECHNICALDATA
230 Vac 50 Hz
Current Draw 1.0 A
Motor Power 60 W
Motor Power 645 Nm
Service 50 %
Protection Degree IP 34
Lubrication Permanent
Weight 25 Kg
Max chain weight 8.5 Kg
Table of contents
Other Parklio Control System manuals
Popular Control System manuals by other brands

Force America
Force America SSC6100 CAN ULTRA Operation manual

Eaton
Eaton iLumin Plus Installation quick guide

Crestron
Crestron MP2 Operation guide

Electronics Line
Electronics Line iconnect installation manual

Knight
Knight UMP Hospitality instruction manual

Liberty Pumps
Liberty Pumps OilTector OTC-115 Operation and maintenance manual