3 Issue 1 –ER - Oct 2019
In the interest of safety, all personnel involved in the lifting
operation must read the operation manual and comply with
the following;
1. The lift must not be used for man riding.
2. Do not step on the forks or platform.
3. As a minimum requirement, the lift should be inspected every 6 months and serviced annually
by a competent person. The lift also requires a thorough examination and certificate of test as
determined by the competent person at least every 12 months. See the Service Contract
section for full statutory responsibilities.
4. Do not use the lift if it is not supported with valid documentation recording a thorough
examination being carried out by a competent person within the last 12 months.
5. Do not interfere with the factory settings
6. Do not modify or re-install this machine without seeking guidance from Penny Hydraulics
Ltd. Only use correct and certified lifting accessories. Any lifting or securing attachments
must be formally certified by thorough examination every 6 months.
7. Only use genuine parts and accessories.
8. The lift must not be overloaded. Refer to the Max Working Load signs attached to the
equipment
9. Always park the lift at the bottom when not in use.
10. The lift must only be operated by trained and competent personnel. A training register is
included at the back of this manual.
11. Whilst the transfer of goods is in progress, access to the area should be restricted to those
personnel essential to the operation.
12. No persons should go near the forks or platform whilst they are raised.
13. All safety notices must be read and complied with at all times.
14. Never interfere with the unit, it should run smoothly at all times. If in doubt call the
HELPLINE telephone Number 01246 811475.
15. Keep the MezzLift properly maintained by a competent person.
16. Where barriers, guards and/or safety gates are fitted, always ensure that they are in place
before commencing any work.
17. Isolate, immobilize and lock off the equipment before commencing any maintenance routine.
Please note that any control panel may remain live, even when the motor is not running.