Peqlab peqPOWER 250 User manual

Instruction Manual
250 Volt Power Supply
0412E Creating the future
t
ogethe
r
.

Instruction Manual peqPOWER 250 Volt Power Supply
CONTENTS
WARNING 1
SAFETY INFORMATION 1
PRODUCT CONTENTS 2
PRODUCT SPECIFICATIONS 3
OVERVIEW 4
OPERATIONAL KEYS 6
GETTING STARTED 6
IMPORTANT GUIDELINES 7
OPERATIONAL MODES 8
CHOOSING LIMITING PARAMETER SETTINGS 10
TROUBLESHOOTING 11
OPERATIONAL ELECTRICAL PARAMETERS 12
COMMON ERRORS FOUND WITH ELECTROPHORESIS POWER SUPPLIES 12
REPAIR AND MAINTENANCE 13
TECHNICAL SUPPORT AND ORDERING INFORMATION 15
WARRANTY 16
EQUIPMENT DISPOSAL 16
PEQLAB_v0412_E

Instruction Manual peqPOWER 250 Volt Power Supply
WARNING
Federal Communications Commission Advisory
This equipment has been tested and found to comply with the limits for a Class A digital device, pursu-
ant to part 15 of the FCC rules. These limits are designed to provide reasonable protection against
harmful interference when the equipment is operated in a commercial environment. This equipment
generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance
with the instruction manual, may cause harmful interference to radio communications. Operation of this
equipment in a residential area is likely to cause harmful interference in which case the user will be re-
quired to correct the interference at their expense. Changes or modifications not expressly approved by
the party responsible for compliance could void the user’s authority to operate the equipment.
SAFETY INFORMATION
Avoiding Electrical Shock
The peqPOWER 250 Volt Power Supply produces up to 3 A or 250 voltage outputs which are electri-
cally isolated from ground to reduce the risk of electrical shock to the user. Follow the guidelines below
to ensure safe operation of the unit.
The peqPOWER 250 Volt Power Supply has been designed for use with electrophoresis cells with
shielded banana plugs thus minimizing any potential shock hazard to the user. Always use gel box sys-
tems that are compatible with the Power Supply, have been designed for your specific applications, and
are suitable for the voltage and current range of the Power Supply. PEQLAB recommends against the
use of gel box systems and / or power leads that have unshielded banana plugs.
To avoid electrical shock:
1. NEVER connect or disconnect wire leads from the power jacks when the red indicator light
at the Start/Stop key is on or when “RUNNING” is displayed on the screen.
2. WAIT at least 5 seconds after stopping a run before handling output leads or connected ap-
paratus.
3. ALWAYS make sure that hands, work area, and instruments are clean and dry before mak-
ing any connections or operating the power supply.
4. ONLY connect the power supply to a properly grounded AC outlet.
Avoiding Damage to the Instrument
1. For proper ventilation, leave at least 10 cm of space behind the instrument, and at least
5 cm of space on each side.
2. Do not operate the power supply in high humidity environments (> 95 %), or where conden-
sation may occur.
3. To avoid condensation after operating the power supply in a cold room, wrap the unit in a
plastic bag and allow at least 2 hours for the unit to equilibrate to room temperature before
removing the bag and operating the unit.
Symbols
Used on the peqPOWER 250 Volt Power Supply to indicate an area where a potential shock
hazard may exist.
PEQLAB_v0412E 1

Instruction Manual peqPOWER 250 Volt Power Supply
PEQLAB_v0412E 2
PRODUCT CONTENTS
Types of Products
This manual is supplied with the following products:
Cat. No. 55-E250-230V peqPOWER 250 Volt Power Supply (230 VAC, 50-60 Hz)
Cat. No. 55-E250-110V peqPOWER 250 Volt Power Supply (110 VAC, 50-60 Hz)
Product Contents
Component Quantity
250V Power Supply 1 each
Instruction Manual 1 each
Extra Fuse 1 each
Power Cord 1 each
Warranty Card 1 each
Upon Receiving the Instrument
Immediately upon arrival, please check carefully that the shipment is complete and has not been dam-
aged in transit. For missing parts or to report any kind of damage, please contact PEQLAB (see 'TECH-
NICAL SERVICE AND ORDERING INFORMATION'). Please retain all packaging materials until the de-
livery has been completely checked, since this will speed up the return of goods if required and reduce
environmental impact. Any form of returns, replacements or credit notes must be agreed in advance by
PEQLAB.
To ensure safe, reliable operation, always operate the peqPOWER 250 Volt Power Supply
in accordance with the manufacturer’s instructions. Always wear protective gloves and
safety glasses when working in a laboratory environment.

Instruction Manual peqPOWER 250 Volt Power Supply
PRODUCT SPECIFICATIONS
peqPOWER 250 Volt Power Supply Specifications
Input Power (Switchable) 115 VAC, 50-60 Hz
230 VAC, 50-60 Hz
Fuses One 4 A / 250 V, one extra fuse is provided
Output power max 300 watts
Output voltage range 5 ~ 250 V
Output current range 10 mA ~ 3 A
Timer ~ 99.99 per step
Terminal pairs 4:4 positive voltage and 4 negative voltage
Operating Modes
Constant Voltage 1 V step
Constant Current 1 mA step
Constant Power 1 watt step
Crossover Auto
Display type LCD Graphic type
Display size 53.64 x 15.64 mm (W x H)
Pause function Yes
Safety feature No Load Detection
Load Change Detection
Overload detection
Ground Leak
Auto Restart
Programmable Yes
Store file no.: 10
Program: up to 10 steps
Stackable Yes
Housing material Flame retardant ABS
Housing size 200 x 300 x 90 mm (W x D x H)
Operating temp. 0 – 40 °C
Operating environment 100 % RH, 75 kPa-106 kPa, Altitude not to exceed 2000 meters
Weight 2.5 kg
Certifications CE; TUV; UL
Warranty 3 years
PEQLAB_v0412E 3

Instruction Manual peqPOWER 250 Volt Power Supply
OVERVIEW
The peqPOWER 250 Volt Power Supply is a microprocessor-controlled power supply designed to meet
most electrophoresis needs in a single easy to use unit. The power supply’s small foot print and stacking
feature conserve valuable bench space. The power supply is capable of running constant voltage, con-
stant current or constant power applications and programming mode concurrently. This instrument is
ideal for DNA/RNA electrophoresis, SDS-PAGE, native PAGE, and IEF applications. With four sets of
output jacks that can be used simultaneously, the peqPOWER 250 Volt Power Supply is designed to run
applications at maximal power and efficiency. The peqPOWER 250 Volt Power Supply offers three
modes: Constant Voltage, Constant Current and Constant Wattage Mode. This manual describes the
setup and operation of peqPOWER 250 Volt Power Supply including important information on safety
and maintenance of the unit.
Features of the peqPOWER 250 Volt Power Supply
Important features of the peqPOWER 250 Volt Power Supply are listed below:
Constant Voltage, Power or Current
Capable of running multiple electrophoresis units
Large LCD display with clear menu prompts for easy use
Programming capabilities for limiting voltage (V), current (mA), power (W).
Four sets of output terminals
Capability to specify run durations by time or volt-hours
Purpose of the Manual
This manual includes the following information:
Safety information
Instructions for setting up the instrument
Operating instructions
Guidelines for repair and maintenance
Follow the recommendations and guidelines provided in this manual for your safety, best results, and
optimal performance of your peqPOWER 250 Volt Power Supply.
PEQLAB_v0412E 4

Instruction Manual peqPOWER 250 Volt Power Supply
PEQLAB_v0412E 5
Description of Buttons and Switches
Front View of peqPOWER 250 Volt Power Supply
Rear View of peqPOWER 250 Volt Power Supply
Control Buttons
LCD Displa
y
Output Jacks
Volta
g
e Selector
Power Switch
Fuse Drawer
Power Inlet

Instruction Manual peqPOWER 250 Volt Power Supply
OPERATIONAL KEYS
Key Functions
STOP key: Used to stop operation from the Running Screen
START/PAUSE key: Used to start operation / temporarily interrupt power to an
operation in progress without terminating electrophoresis and to resume power
after pausing without resetting the timer
CONSTANT key: Used to set up constant voltage or current values
MODE key: Used to choose either Constant Voltage, Constant Current or Constant
Wattage mode
Down Arrow key: Used to move cursor down between parameters and to decrease
numeric values
Up Arrow key: Used to move cursor up between parameters and to increase nu-
meric values
STOP
START
PAUSE
CONSTANT
MODE
GETTING STARTED
Installing the peqPOWER 250 Volt Power Supply
1. Check the label located near the AC inlet to ensure that the unit is compatible with locally pro-
vided voltage.
2. Place the peqPOWER 250 Volt Power Supply on a level laboratory bench. Keep the area
around the power supply clear to ensure proper ventilation of the unit.
3. For your safety: Position the unit properly such that the On-Off switch and the AC inlet located
on the rear of the unit are easily accessible.
4. Ensure the AC power switch is in the Off position.
5. Attach the power cord to the AC inlet. Use only properly grounded AC outlets and power cords.
6. Connect the leads from the electrophoresis unit; insert the red lead (+) into the red output jack,
and the black lead (-) into the black output jack.
PEQLAB_v0412E 6

Instruction Manual peqPOWER 250 Volt Power Supply
IMPORTANT GUIDELINES
Introduction
The important guidelines for operating the peqPOWER 250 Volt Power Supply are provided in this sec-
tion. We recommend that you carefully review these guidelines before operating the instrument.
Important
For best results, do NOT use the peqPOWER 250 Volt Power Supply at its maximum electrical load lim-
its. Variations in buffer conditions can result in exceeding the power supply’s maximum voltage, current,
or power output capacity and produce undesirable variations in electrophoretic separations.
General Operating Instructions
Follow the instructions below to operate the peqPOWER 250 Volt Power Supply.
Turn on the peqPOWER 250 Volt Power Supply using the power switch on the rear of the in-
strument. Upon start-up, the current settings appear on the screen.
Use the START/PAUSE and STOP keys and output jacks for applications.
Use the CONSTANT key to set up operation mode.
Recommendation
The duration of electrophoresis can be defined in time (hours/minutes). When using this or any electro-
phoresis product, we recommend that you adhere to the protocols given in the electrophoresis product
manuals, and durations, specified in time.
Important
For best results, follow these important guidelines when running multiple gels and electrophoresis units
concurrently.
For example:
• Avoid running samples of widely differing salt concentrations or sample buffers at the same time or on
the same gel.
• Properly prepare and desalt your samples.
Note: Variations in conductivity due to differences in buffer salt concentrations can affect the run of all
the samples run at the same time.
PEQLAB_v0412E 7

Instruction Manual peqPOWER 250 Volt Power Supply
OPERATIONAL MODES
Introduction
The peqPOWER 250 Volt Power Supply is designed to operate under different modes, Constant mode
or Programming Mode, depending upon your electrophoresis needs.
Use the Constant Voltage, Constant Power or Constant Current Operation for applications that require
only one specific voltage limit, current limit, and power limit continuously during the entire duration of
electrophoresis.
Start-up
On power up use the ▼▲ arrow key to choose the operational Mode (Constant Mode or Program
Mode), then press Mode to select.
On the Display Screen:
The controlling value (Volts, Amp or Watts) is displayed on the left-top side of the display
screen.
The Timer is the first line on the right-top, and the other values (Volts, Amp or Watts) are dis-
played in the second and third line on the right side of the display screen.
Constant Operation Protocol
Instructions for operating the peqPOWER 250 Volt Power Supply in the Constant Operation are pro-
vided in this section. The Constant Voltage, Current or Power Mode allow you to specify a voltage limit,
current limit and power limit to be used during the entire duration of electrophoresis. Review the guide-
lines provided in this manual before starting electrophoresis using the peqPOWER 250 Volt Power Sup-
ply.
A basic Constant Voltage, Current Mode or Constant Power operating procedure of the peqPOWER
250 Volt Power Supply is provided below. We recommend reading the guidelines provided in this
manual for best results before starting an operation.
1. Use the power switch on the rear side of the instrument to turn on the peqPOWER 250 Volt
Power Supply. On Display Screen Constant Mode and Program Mode will appear.
2. With the Constant Mode highlighted press the Mode key
3. Use the Mode Key to navigate to needed parameter (Volt, Amp, or Wat)
4. Press the CONSTANT key to select, Constant Voltage Operation, Constant Current Operation or
Constant Power Operation from the Display Screen.
5. Use the ▼▲ arrow keys to set either voltage (VOLT) or current (AMP) or power (WAT) to the
appropriate values.
6. Use the Mode key to select TIME and use ▼▲ arrow key to set the time (hours/minutes) to spec-
ify the duration of the electrophoresis.
7. Press START/PAUSE key to start electrophoresis.
8. Press the START/PAUSE key again to temporarily interrupt power to ongoing electrophoresis
without terminating the operation along with LED flashing.
9. Press the STOP key to stop electrophoresis.
PEQLAB_v0412E 8

Instruction Manual peqPOWER 250 Volt Power Supply
10. If the parameters need to be changed during the run you must stop electrophoresis by pressing
the Mode key. Enter the changes and then press Start/Stop once again to restart your opera-
tion.
Note: After stopping and restarting an operation, the timer resets to selected time and does not take into
account the time that electrophoresis was in progress before it was stopped.
Basic Programming Protocol
Instructions for operating the peqPOWER 250 Volt Power Supply in the Programming Mode are pro-
vided in this section. The Programmable Mode allows you to vary levels in voltage (V), current (mA),
and power (W) during specified periods of time as discrete changes (STEP) for up to 10 steps, depend-
ing upon your electrophoresis needs.
A basic Programmable Mode operating procedure of the peqPOWER 250 Volt Power Supply is pro-
vided below. We recommend reading the guidelines provided in this manual for best results before
starting an operation.
Selecting a program:
1. Select Program Mode by scrolling down using the ▼key
2. When highlighted press Mode key
3. Select file number using the ▼▲ arrow keys
4. When file number is located press the Mode key
5. Select the number of steps by using the ▼▲ arrow keys
6. To enter the parameters of the run press the Mode key
7. Voltage will appear on the display to enter voltage press Mode key
8. To change voltage, use the ▼▲ arrow keys.
9. Select Amperage or Watts by pressing the Mode key until desired parameter is flashing.
10. Increase or decrease the value by using the▼▲ arrow keys
11. To set the time in hours press the Mode key
12. Increase or decrease the value by using the▼▲ arrow keys
13. Select the Mode key again to select minutes.
14. Increase or decrease the value by using the▼▲ arrow keys
15. Repeat 6 thru 14 above to program successive steps.
Viewing a Program
1. Select the file number using the ▼▲ arrow keys when highlighted press the Mode key.
2. Press the Mode key 3 more times to advance to the programming.
3. If multiple steps use the Mode key to advance through the program to the next step.
Editing a program
1. When a file is selected the parameters can be edited by the Mode button
2. When the parameter is selected, it will flash. Use the ▼▲ arrow keys to either increase or de-
crease values.
PEQLAB_v0412E 9

Instruction Manual peqPOWER 250 Volt Power Supply
3. Press the Mode key to migrate to the next parameter.
4. When the parameter is selected use the ▼▲ arrow keys to increase or decrease the values.
CHOOSING LIMITING PARAMETER SETTINGS
Introduction
The peqPOWER 250 Volt Power Supply is capable of operating at limiting Voltage, or limiting Current
or limiting Power. We recommend operating the peqPOWER 250 Volt Power Supply at limiting voltage
for most applications. See below for more details.
Voltage Limiting
For most electrophoresis methods resistance increases throughout the run. Limiting the voltage provides
the following advantages:
Current and power decrease throughout the run, providing an improving margin of safety over
time.
The same voltage setting can be used regardless of the number or thickness of gels being elec-
trophoresed.
Current Limiting
Discontinuous buffer systems and, to a lesser extent, continuous systems increase resistance during the
run. If you use the current limiting setting on the peqPOWER 250 Volt Power Supply, the voltage will
increase as resistance increases to satisfy Ohm’s law (V=I*R). If no voltage limit is set and a local fault
condition occurs, such as a poor connection, very high local resistance may cause the voltage to in-
crease to the maximum capacity of the power supply. This may lead to local overheating and damage
to the electrophoresis cell or create unsafe conditions. When operating under constant current condi-
tions, set a voltage limit on the power supply at or slightly above the maximum expected voltage.
Power Limiting
Power P is a function of voltage V and current I P=I*V. If voltage is increased power will also be in-
creased depending on the gel system, resistance R should be a constant. Power will be reflected by the
heat generated during a gel run. The power limiting function may be used when running sequencing
gels to remove the APS from the wells and to heat the gel to an optimal temperature for DNA separa-
tions.
PEQLAB_v0412E 10

Instruction Manual peqPOWER 250 Volt Power Supply
TROUBLESHOOTING
Review the information in the table below to troubleshoot operating problems.
Problem Cause Solution
AC power cord is not connected Check AC power cord connections at both
ends. Use the correct cords.
The LCD screen
remains blank and
the fan does not run
when the power is
turned on
The fuse has blown Replace the fuse
1. Electrophoresis leads are not
connected to the power supply.
1. Check the connections to the power supply
and on your electrophoresis cell to make sure
the connection is intact; check condition of
wires in electrophoresis unit.
2. The electrophoresis unit(s), is
not connected.
2. Close the circuit by reconnecting the ca-
bles.
3. There is a broken circuit in
the electrophoresis cell
3. Press START/PAUSE to restart the run.
4. High resistance due to tape
left on a pre-cast gel
4. Correct the condition by making sure the
tape is removed from the pre-cast gel.
5. Incorrect buffer concentra-
tion, or incorrect buffer volumes
in the electrophoresis cell
5. Make sure buffers are prepared correctly,
and the recommended volume of buffer is
added to the electrophoresis unit.
Operation stops
with alarm
The screen displays
“NO LOAD”
6. High voltage application is
set to run on a very low current
6. Change current setting.
Operation stops
with alarm:
Display shows
“OVER VOLTAGE”
Circuit is interrupted
1. Verify that the running buffer is correct.
2. Verify the all cables are attached correctly
3. Turn the Power switch off and on again;
restart application.
4. If you cannot restart the instrument, turn off
the power, disconnect the power cord from
the outlet, and contact Technical Service.
Operation stops
with alarm:
Display shows
“LEAKAGE”
Ground leak detected during
run
1. Check the electrophoresis system for im-
proper grounding.
2. Restart the power supply by turning the
Power switch off and on.
Operation stops
with alarm:
Display shows
“OVER TEMP”
Power supply is overheating 1. Turn off power supply. Check for sufficient
airflow around the power supply fan. After
cooling down, restart the power supply.
2. If you cannot restart the instrument, turn off
the power, disconnect the power cord from
the outlet, and contact Technical Service.
PEQLAB_v0412E 11

Instruction Manual peqPOWER 250 Volt Power Supply
OPERATIONAL ELECTRICAL PARAMETERS
Power Considerations
Electrophoresis is the migration of a charged particle under the influence of an electrical field. The
power supply output parameters voltage, current and power are related by the following two equations:
Voltage (V) = Current (I) x Resistance (R); (V=I*R)
Power (P) = Current (I) x Voltage (V); (P=I*V)
Resistance
Resistance of the assembled electrophoresis cell is dependent on the conductivity of the gel buffer, the
thickness of the gel, and the number of gels being run. Although the resistance is determined by the gel
system, the resistance can vary over the course of an electrophoretic separation. For instance, in the
Tris-Glycine buffer system, the fast moving, highly conductive chloride ions in the gel are gradually re-
placed by the slower moving, less conductive glycine ions from the running buffer as the gel runs. As a
result, the resistance of the gel increases as the chloride/glycine front moves down the gel, and the cur-
rent decreases.
Voltage
The velocity with which an ion moves in an electric field will vary in proportion to the field strength (volts
per unit distance). The higher the voltage the faster an ion will move.
Current
Current is a function of the number of ions passing a given cross-section of the circuit at a given time.
For a given gel/buffer system, at a given temperature, current will vary in proportion to the field
strength (voltage) and/or cross-sectional area (number and/or thickness of the gels). Ions in solution
and at a given voltage will move faster as the temperature increases, increasing current.
Power
The power in Watts, or the rate of heat generated by the system, is directly proportional to voltage and
current (P=I*V).
COMMON ERRORS FOUND WITH ELECTROPHORESIS POWER SUPPLIES
No load
The electrophoresis system is not connected to the power leads, check the power leads
The electrophoresis system has a short, the Pt wire is broken or the banana connectors are dam-
aged
Buffer concentration too low
Buffer volume too low
Short in power cord
Current has dropped below acceptable rating (10 mA)
PEQLAB_v0412E 12

Instruction Manual peqPOWER 250 Volt Power Supply
Short circuit
Load exceeds 3000 mA
Blown fuse in the power supply
Incorrect input voltage (check input voltage switch near power inlet)
Change in load
Electrophoresis systems were added or removed during a run
Buffer leaking in a connected system
Excessive temperature increase
Excessive buffer evaporation
Loose connection in a connected system
Amperage set to low
Change in constant mode
Voltage changes to amperage
oAmperage set too low. Ceiling hit and constant mode changed from voltage to amper-
age. Increase amperage to 3000 mA.
Amperage changes too voltage
oVoltage set to low. Ceiling hit and constant mode changed from amperage to voltage.
Increase voltage to 250 volts
The 250 volt system has automatic cross over, set voltage or amperage, and preset wattage. During the
electrophoresis process only one parameter is limiting at a time. The limiting parameter, together with
the conductivity in the electrophoresis system, and the values for the other parameters determine the
maximum output.
REPAIR AND MAINTENANCE
Introduction
The peqPOWER 250 Volt Power Supply requires no periodic maintenance program with the exception
of an occasional dry wipe-down of the instrument.
Encountering Problems
1. Check the troubleshooting section.
2. Call Technical Service.
3. If the unit must be shipped back for repair, contact PEQLAB for a decontamination form and
shipping instructions.
Cleaning
Device and output jacks must be always clean. Before using any cleaning or decontamination methods
except those recommended by the manufacturer, check with the manufacturer that the proposed method
will not damage the equipment. To clean the centrifuge use a damp cloth and a mild, non-corrosive
detergent (ph < 8). After cleaning, ensure all parts are dried thoroughly before attempting to operate
the unit. Do not immerse the centrifuge in liquid or pour liquids over it.
PEQLAB_v0412E 13

Instruction Manual peqPOWER 250 Volt Power Supply
Disinfection
In case disinfection gets necessary, clean the system with 70 % ethanol or IPA. After cleaning, ensure all
parts are dried thoroughly before attempting to operate the unit. Do not immerse the centrifuge in liquid
or pour liquids over it.
Before using any cleaning or decontamination methods except those recommended by the manufac-
turer, check with PEQLAB that the proposed method will not damage the equipment..
Replacing the Fuse
For additional fuses, contact PEQLAB’s Technical Service.
To replace the fuse:
1. Turn off the main power switch at the rear of the peqPOWER 250 Volt Power Supply and de-
tach the power cord from the rear of the peqPOWER 250 Volt Power Supply.
2. Open the fuse compartment located inside the Power Entry Module by inserting a small flat
blade screwdriver into the slot below the ON/OFF switch. Turn the screwdriver to gently pry
open the fuse compartment.
Note: The fuse compartment will not open with the power cord in place.
3. Pull the fuse holder out of the compartment and inspect the fuse. If the fuse is burned or there is
a break in the fuse element, replace the fuse with an identical type of fuse (4A/250V) as pro-
vided in the fuse holder (see figure below).
4. Place the fuse holder back into the compartment.
5. Snap the cover closed.
PEQLAB_v0412E 14

Instruction Manual peqPOWER 250 Volt Power Supply
TECHNICAL SUPPORT AND ORDERING INFORMATION
This manual is supplied with the following products:
Product Outputs Voltage Current Power Cat. No.
peqPOWER 250 V (230 V) 4 250 3000 mA 300 W 55-E250-230V
peqPOWER 250 V (110 V) 4 250 3000 mA 300 W 55-E250-110V
Also available from PEQLAB are the following power supplies:
Product Outputs Voltage Current Power Cat. No.
peqPOWER 300 V (230 V) 4 300 500 mA 90 W 55-E300-230V
peqPOWER 300 V (110 V) 4 300 500 mA 90 W 55-E300-110V
For technical questions and more detailed information on PEQLAB’s products please visit
www.peqlab.com to find the respective contact person.
Please have the unit’s serial number (located on the bottom panel of the instrument) available when call-
ing. Should an item require return to PEQLAB for service, a decontamination form must be completed
first by the user. Items sent without decontamination form will not be accepted.
All returns must be pre-approved by PEQLAB!
PEQLAB_v0412E 15

Instruction Manual peqPOWER 250 Volt Power Supply
WARRANTY
PEQLAB Biotechnologie GmbH warrants that this product will be free from defects in material and
workmanship for a period of three (3) years from date of purchase. If a defect is present, PEQLAB will,
at its option, repair, replace, or refund the purchase price of this product at no charge to you, provided
it is returned during the warranty period. This warranty does not apply if the product has been dam-
aged by accident, abuse, misuse, or misapplication, or from ordinary wear and tear.
For your protection, items being returned must be insured against possible damage or loss. This war-
ranty shall be limited to the replacement of defective products. IT IS EXPRESSLY AGREED THAT THIS
WARRANTY WILL BE IN LIEU OF ALL WARRANTIES OF FITNESS AND IN LIEU OF THE WARRANTY
OF MERCHANTABILITY.
For research use only. Not intended for any animal or human therapeutic or diagnostic use.
EQUIPMENT DISPOSAL
This equipment is marked with the crossed out wheeled bin symbol to indicate
that this equipment must not be disposed of with unsorted waste.
Instead it's your responsibility to correctly dispose of your equipment at lifecy-
cle -end by handling it over to an authorized facility for separate collection
and recycling. It's also your responsibility to decontaminate the equipment in
case of biological, chemical and/or radiological contamination, so as to pro-
tect from health hazards the persons involved in the disposal and recycling of
the equipment.
For more information about where you can drop off your waste of equipment,
please contact your local dealer from whom you originally purchased this
equipment.
By doing so, you will help to conserve natural and environmental resources and you will ensure that
your equipment is recycled in a manner that protects human health. Thank you.
PEQLAB_v0412E 16

Instruction Manual peqPOWER 250 Volt Power Supply
PEQLAB_v0412E 17
NOTES

D PEQLAB Biotechnologie GmbH, 91052 Erlangen, Freecall (D): 0800 100 20 16, [email protected], www.peqlab.de
AT PEQLAB Biotechnologie GmbH, 6404 Polling, Tel: +43 (0) 5238 84 169, [email protected], www.peqlab.at
UK PEQLAB Ltd., Southampton SO31 7ZN, Freecall (UK): 0808 20 21 302, [email protected], www.peqlab.co.uk
USA PEQLAB LLC, Wilmington, DE 19810, Toll-Free (US): 877 737 5220, [email protected], www.peqlab.us
Creating the future togethe
r
.
Other manuals for peqPOWER 250
1
Table of contents
Other Peqlab Power Supply manuals
Popular Power Supply manuals by other brands

elsner elektronik
elsner elektronik KNX PS640-IP 2U installation instructions

LEGRAND
LEGRAND 4130 17 quick start guide

Array electronic
Array electronic 366XA user manual

WFCO
WFCO WF-8500MBA Series Operator's manual

Techly
Techly IPW-5V1ATY quick start guide

Allen-Bradley
Allen-Bradley 1606-XLE480FP installation instructions