
AEM-CAPXX-PF-EVK Solar Development Kit with e-peas PMIC and CAP-XX Supercapacitors
PowerFilm, Inc. • 1287 XE Place • Ames, IA 50014 USA • www.powerlmsolar.com • 515-292-7606 5/22
Step 1: AEM10941 Conguration
MPPT Ratio: Dened to 70%
Storage Element Voltages Protection: CFG2-CFG1-CFG0
BAL Option: Select “CON”for dual-cells super capacitor and“GND” for any other storage.
PRIM Option: Connect both jumpers “NoPRIM” or remove them if a primary battery is connected.
Dene minimum voltage using R7 and R8.
LDOs Output Voltages: ENHV [HVOUT] - ENLV [LVOUT]
Step 2: Connect the storage element or solder a CAP-XX
super capacitor on the bottom layer (refer to the table on the following page)
Step 3: Connect the Load(s) to HVOUT / LVOUT
Step 4: Connect the PowerFilm Photovoltaic module to SRC
Step 5: Set up complete! See User Guide for additional details and advanced congurations.
Quick Start Guide