Installation manual ProofVision
“Making it work in challenging conditions”
INSTALLATION AND WIRING INSTRUCTIONS
This toothbrush charger unit is suitable for mounting with a 47mm deep 2 gang flush metal box.
Please note – check orientation of box when fitting this unit on a surface pattress box.
For the best mounting results and visual appearance, it is recommended that prior to installation, the
mounting surface between the accessory front plate is first prepared to ensure that it is flat and all
high spots have been removed.
1. Remove product and screws supplied from the packaging
2. Feed incoming supply cable through appropriate knockout entry in back box. Ensure a
protective cable grommet is fitted when using a flush metal box.
3. Remove suitable length of outer sheath from the supply cable. Remove 10mm from the live
and neutral inner insulation to expose the conductor ends.
4. Insert Neutral conductor into the charger supply unit terminal into either of the 2 available
terminals available (mains are both red so are interchangeable)
5. Insert Live conductor into the charger supply unit terminal into either of the 2 available
terminals available (mains are bath red so are interchangeable)
6. Before connecting the protective earth conductor, ensure that all bare earth conductors are
sleeved with a length of Green/ Yellow sleeving (not supplied)
7. Insert sleeved earth conductor into terminal marked with the Earth symbol.
8. Ensure that an additional sleeved earth conductor is also fitted between the charger unit
earth terminal and the earth terminal fitted in the flush metal box.
9. Ensure all terminal screws are tight.
10. Fit the toothbrush charging unit onto the mounting box, taking care not to trap any cables.
11. Secure unit using the fixing screws.
12. Ensure that the plastic frame is correctly fitted and then fit the front plate in place.
13. Refit the supply fuse (if removed) and switch on mains supply.
161mm(H) X 89m(W)