Ruby Tech VC-450LR User manual

VC-450LR
Managed Industrial VDSL2 CO/CPE Modem.
USER’S MANUAL

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
Copyright
Copyright © 2019 by RubyTech Deutschland GmbH. All rights reserved.
Legal Disclaimer
The information given in this document shall in no event be regarded as a guarantee of conditions or characteristics. With respect
to any examples or hints given herein, any typical values stated herein and/or any information regarding the application of the
device, RubyTech Deutschland GmbH hereby disclaims any and all warranties and liabilities of any kind, including without
limitation warranties of non-infringement of intellectual property rights of any third party.
Statement of Conditions
In the interest of improving internal design, operational function, and/or reliability, RUBYTECH reserves the right to make
changes to the products described in this document without notice. RUBYTECH does not assume any liability that may occur due
to the use or application of the product(s) or circuit layout(s) described herein.
Maximum signal rate derived from IEEE Standard specifications. Actual data throughput will vary. Network conditions and
environmental factors, including volume of network traffic, building materials and construction, and network overhead, lower actual
data throughput rate. RubyTech does not warrant that the hardware will work properly in all environments and applications, and
makes no warranty and representation, either implied or expressed, with respect to the quality, performance, merchantability, or
fitness for a particular purpose. Make sure you follow in line with the environmental conditions to use this product.
Safety Warnings
For your safety, be sure to read and follow all warning notices and instructions before using the device.
DO NOT open the device or unit. Opening or removing the cover may expose you to dangerous high voltage points or
other risks. ONLY qualified service personnel can service the device. Please contact your vendor for further information.
1

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
Use ONLY the dedicated power supply for your device. Connect the power to the right supply voltage (110V AC used for
North America and 230V AC used for Europe. VC-450 supports 12 to 48 VDC dual power input (Redundant power)).
Place connecting cables carefully so that no one will step on them or stumble over them. DO NOT allow anything to rest on
the power cord and do NOT locate the product where anyone can work on the power cord.
DO NOT install nor use your device during a thunderstorm. There may be a remote risk of electric shock from lightning.
DO NOT expose your device to dampness, dust or corrosive liquids.
DO NOT use this product near water, for example, in a wet basement or near a swimming pool.
Connect ONLY suitable accessories to the device.
Make sure to connect the cables to the correct ports.
DO NOT obstruct the device ventilation slots, as insufficient air flow may harm your device.
DO NOT place items on the device.
DO NOT use the device for outdoor applications directly, and make sure all the connections are indoors or have waterproof
protection place.
Be careful when unplugging the power, because it may produce sparks.
Keep the device and all its parts and accessories out of the reach of children.
Clean the device using a soft and dry cloth rather than liquid or atomizers. Power off the equipment before cleaning it.
This product is recyclable. Dispose of it properly.
Attention:
Be sure to read this manual carefully before using this product. Especially Legal Disclaimer, Statement
of Conditions and Safety Warnings.
2

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
VC-450LR is a Managed Single Master/Slave LAN Extender that leverages the extraordinary bandwidth promise of VDSL2
technology (max. 100Mbps symmetric), the next step in the delivery of new high-speed Internet applications in Industrial-grade
environments. Quick, easy, economical to install and maintain, the VC-450LR works over existing copper wire infrastructure. VC-
450LR is a Master(CO side) device. And also can switch as Slave(CPE side) by web config menu.
VC-450LR will allow operators worldwide to compete with cable andsatellite operators by offering services such as HDTV, VOD,
videoconferencing, high speed Internet access and advanced voice services including VoIP, over a standard copper
telephone cable. VC-450LR is seen by many operators as an ideal accompaniment to a FTTP rollout, where for instance fiber optic
is supplied direct to an apartment block and from there copper cable is used to supply residents with high-speed VDSL2.
Caution:
The VC-450LR is industrial-grade applications. This product does not have waterproof protection.
Table of Contents
COPYRIGHT..............................................................................................................................................................................................................................................1
1.1 CHECK LIST.......................................................................................................................................................................7
CHAPTER 2. INSTALLING THE MODEM...............................................................................................................................................................................................8
3

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
2.1 HARDWARE INSTALLATION....................................................................................................................................................8
2.2 PRE-INSTALLATION REQUIREMENTS.........................................................................................................................................8
2.3 GENERAL RULES.................................................................................................................................................................9
2.4 CONNECTING THE MODEM.................................................................................................................................................10
2.5 CONNECTING THE RJ-11 / RJ-45 PORTS..............................................................................................................................11
2.5 POINT TO POINT APPLICATION.....................................................................................................................................11
CHAPTER 3. HARDWARE DESCRIPTION...........................................................................................................................................................................................14
3.1 FRONT PANEL..................................................................................................................................................................15
3.2 FRONT INDICATORS...........................................................................................................................................................15
3.3 REAR PANEL....................................................................................................................................................................18
3.4 SIDE PANEL.....................................................................................................................................................................18
CHAPTER 4. CONFIGURE THE VC-450LR VIA WEB MANAGEMENT MENU...............................................................................................................................23
4.1 BASIC SETUP..............................................................................................................................................................24
4.1.1 Login Webpage.....................................................................................................................................................................................................................24
4.1.2 Display status.......................................................................................................................................................................................................................25
4.2 SELECT THE MENU LEVEL.....................................................................................................................................................26
4.3 SYSTEM.........................................................................................................................................................................27
4.3.1 Configuration Backup.........................................................................................................................................................................................................28
4.3.2 Configuration Restore.........................................................................................................................................................................................................29
4.3.3 Update Software...................................................................................................................................................................................................................30
4.3.4 Account Management..........................................................................................................................................................................................................31
4.3.5 Log Level...............................................................................................................................................................................................................................32
4

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
4.3.6 Service Control.....................................................................................................................................................................................................................33
4.3.7 CWNP (TR-069 Settings).....................................................................................................................................................................................................35
4.3.8 Internet Time.........................................................................................................................................................................................................................36
4.3.9 Restore Default.....................................................................................................................................................................................................................37
4.4 STATUS SETUP..............................................................................................................................................................38
4.4.1 LAN Network.........................................................................................................................................................................................................................39
4.4.2 Ethernet..................................................................................................................................................................................................................................40
4.4.3 WAN(Line) Statistics............................................................................................................................................................................................................41
4.4.4 LAN Statistics.......................................................................................................................................................................................................................42
4.4.5 ARP.........................................................................................................................................................................................................................................43
4.5 XDSL SETUP................................................................................................................................................................44
4.5.1 Master/Slave mode & profile Config.................................................................................................................................................................................45
4.5.1.1 VDSL Config Overview.....................................................................................................................................................................................................46
4.6 LAN SETUP..................................................................................................................................................................47
4.6.1 IPv4 Configuration...............................................................................................................................................................................................................48
4.6.2 IPv6 Configuration:..............................................................................................................................................................................................................49
4.6.3 IPv6Static Route...................................................................................................................................................................................................................50
4.6.4 Ethernet Mode.......................................................................................................................................................................................................................52
4.7 QOS SETUP...................................................................................................................................................................53
4.7.1 Qos Queue.............................................................................................................................................................................................................................54
4.8 APPLICATIONS...............................................................................................................................................................55
4.8.1 Telnet Service Setup(for Security)....................................................................................................................................................................................56
4.8.2 SSH Service(Telnet Encryption)........................................................................................................................................................................................57
4.8.3 Printer Sharing......................................................................................................................................................................................................................58
5

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
4.8.4 Multimedia Sharing..............................................................................................................................................................................................................59
4.8.5 UPnP.......................................................................................................................................................................................................................................60
4.8.6 Multicast IGMP......................................................................................................................................................................................................................61
4.8.7 Multicast MLD (IPv6)............................................................................................................................................................................................................62
4.8.8 SNMP......................................................................................................................................................................................................................................63
APPENDIX A: CABLE REQUIREMENTS.............................................................................................................................................................................................66
APPENDIX B: PRODUCT SPECIFICATION.........................................................................................................................................................................................69
APPENDIX C: TROUBLESHOOTING...................................................................................................................................................................................................72
APPENDIX E: COMPLIANCE INFORMATION...................................................................................................................................................................................81
Warranty.....................................................................................................................................................................................................................................................84
Chapter 1. Unpacking Information
1.1 Check List
Thank you for choosing RubyTech VC-450LR Before installing the modem, please verify the contents inside the package.
6

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
Package Contents:
1 x Industrial VDSL2
CPE modem Accessory Kit : 1 x DIN-Rail mounting plate, 2 x screws, 4 x Feet, 1 x
6pin Terminal Block, 1 x 2pin Terminal Block
Notes:
1. Please inform your dealer immediately for any missing or damaged parts. If possible, retain the carton including
the original packing materials. Use them to repack the unit in case there is a need to return for repair.
2. If the product has any issue, please contact your local distributor.
3. Please use the provided protective caps for unused ports.
4. Please look for the QR code on the bottom of the product, the user can launch the QR code scanning program to
scan and download the user’s manual electronic format file. Above QR code icon is for reference.
5. Power Input: This model supports 12~48V DC power adapters with recommended 17 Watts or above.
7

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
Chapter 2. Installing the Modem
2.1 Hardware Installation
This chapter describes how to install the modem, and establish the network connections. The VC-450LR may be
installed on any level surface (e.g. a table or shelf). However, please take note of the following minimum site
requirements before you begin.
2.2 Pre-installation Requirements
Before you start the actual hardware installation, make sure you can provide the right operating environment,
including power requirements, sufficient physical space, and proximity to other network devices that are to be
connected.
Verify the following installation requirements:
Power requirements: DC 12 to 48VDC redundant power.
The modem should be located in a cool dry place, with at least 10cm/4in of space at the front and back
for ventilation.
Place the modem away from direct sunlight, heat sources, or areas with a high amount of
electromagnetic interference.
Check if the network cables and connectors needed for installation are available.
Do not install phone lines strapped together with AC power lines, or telephone office line with voice
signal.
8

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
Avoid installing this device with radio amplifying stations nearby or transformer stations nearby.
2.3 General Rules
Before making any connections to the modem, please note the following rules:
Ethernet Port interface : RJ-45
All network connections to the modem Ethernet port must be made using Category 5 UTP/STP or above
for 100 Mbps, Category 3, 4 UTP for 10Mbps.
No more than 100 meters of cabling may be use between the MUX or HUB and an end node.
VDSL2 Port interface : RJ-11 & Terminal block combo
All network connections to the RJ-11/ terminal block(sharing port) must use 24~26 gauge with single
twisted pair phone wire.
We do not recommend the use of the 28 gauge phone wire or above.
The RJ-11 is an 6P2C connector, two of which are wired. The modem uses the center two pins. The pin
out assignment for these connectors is presented below.
Please note that the line port is no polarity, therefore user can reverse the two wires of the phone cable
when installed. RJ-11 Pin out Assignments
Pin# MNEMONIC FUNCTION
1 NC Unused
2 NC Unused
3 DSL Used
4 DSL Used
9

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
5 NC Unused
6 NC Unused
2.4 Terminal Block and DIN-Rail mount installation
This section describes how to install the Terminal Block and DIN-Rail to the modem, if you do not install the DIN-Rail, please
paste the 4 rubber feet at the bottom of the hulled to avoid scratches of metal housing.
Take out the “2pin / 6pin terminal block” from inside the accessory kit, and install to the modem properly. (Figure 2.4.1)
Please refer to install the DIN-RAIL as following step:
1. Install the DIN-Rail mounting plate to the VC-450LR. (Figure 2.4.2)
2. Please use the suitable DIN-Rail to install, please refer to the dimensions of the DIN-Rail.(Figure 2.4.3)
3. Insert the top of the DIN-Rail into the top slots on the DIN-Rail mounting plate and the DIN-Rail mounting plate will snap into
place. (Figure 2.4.4)
10

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
Figure 2.4.1 Figure 2.4.2 Figure 2.4.3 Figure 2.4.4
2.5 Connecting the RJ-11 / RJ-45 Ports
The line port has 2 connectors: RJ-45 and terminal block. It is used to connect from VC-450(CO) using single pair phone cable
to VC-450(CPE) bridge side (point to point solution). Take note that VC-450 line port cannot be used at the same time. Either
RJ-11 port is connected or terminal block is connected using straight connection (Figure 2.4) or cross-over connection(Figure
2.5)
11

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
Figure 2.5.1 VC-450LR line ports straight connection Figure 2.5.2 VC-450LR line ports straight connection
When inserting a RJ-11 plug, make sure the tab on the plug clicks into position to ensure that it is properly seated.
Do not plug a RJ-11 phone jack connector into the Ethernet port (RJ-45 port). This may damage the bridge. Instead, use only
twisted-pair cables with RJ-45 connectors that conform to Ethernet standard
Notes:
1. Be sure each twisted-pair cable (RJ-45 Ethernet cable) does not exceed 100 meters (333 feet).
2. We advise using Category 5~7 UTP/STP cables for making Bridge or Router connections to avoid any confusion or
inconvenience in the future when you attach high bandwidth devices.
3. Use 24 ~ 26 gauge twisted pair phone wiring, we do not recommend 28 gauge or above.
4. Be sure phone wire has been installed before the VC-450LR boot.
12

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
2.6 Point to Point Application
First a quick overview on a complete setup of LAN extender Master/Slave LAN extender.
VC-450LR is a LAN extender leverages the extraordinary bandwidth promise of VDSL2 technology (max. 100Mbps Symmetric)
(Figure 2.6)
13

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
Figure 2.6 VC-450LR Point to Point application
14

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
Figure 2.6 VC-450LR industrial-grade application
15

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
2.6.1 Connect the VC-450LR(Master) and the VC-450LR(Slave) to the Line
The objective for LAN extender is to pass high speed data over a twisted pair cable. In the setup, connect VC-450LR(Master)
to VC-450LR (Slave) through phone wire(24~26 AWG) or line simulator or any other hardware representation of a cable
network, with or without noise injection and crosstalk simulations.
2.6.2 Connect the VC-450LR(Master) and the VC-450LR(Slave) to LAN Devices
In the setup, usually an Ethernet tester serves as a representation of the LAN side as well as a representation of the
WAN(Line) side.
2.6.3 Run Demos and Tests
The Ethernet tester may send data downstream as well as upstream. It also receives the data in order to check the integrity of
the data transmission. Different data rates can be tested under different line conditions
16

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
Chapter 3. Hardware Description
This section describes the important parts of the VC-450LR. It features the front panel and rear panel.
VC-450LR Outward
3.1 Front Panel
17

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
The figure shows the front panel. (Figure 3.1)
Figure 3.1 Front Panel(VC-450LR)
3.2 Front Indicators
The Modem has Seven LED indicators. The following Table shows the description. (Table 3-1)
Table 3-1 LED Indicators Description and Operation
LED Color Status Descriptions
PWR
(Power LED) Green On(Steady) Lights to indicate that modem had power good
Off The device is not ready or has malfunctioned.
LED Color Status Descriptions
E1 ~ E4 Green On(Steady) The device has a good Ethernet connection.
18

VC-450LR Managed Industrial VDSL2 CO/CPE Modem USER’S MANUAL Ver. B.3
(Ethernet LED) Blinking The device is sending or receiving data.
Off The LAN is not connected or has malfunctioned.
LINK
(Line LED) Green
On(Steady) The Internet or network connection is up.
Fast Blinking 1. The Master device has detected a Slave device and ready to connect.
2. The device is sending or receiving data.
Off The Internet or network connection is down.
CO Green On (Steady) VC-450LR config on Master mode.
Off VC-450LR config on Slave mode
Note:
It is normal for the connection between two VC-450LR to take up to 3 minutes, due to VC-450LR(Master) connect VC-
450LR(Slave) to establish a link mechanism in auto-speed, with detects and calculates Master and Slave both PBO and PSD level,
noise levels and other arguments for getting a better connection.
Table 3-2 Description of the modem rear connectors
Type Connector Description
19
Table of contents