
STEP 3 - Attach1 x bottom shelf (12) to STEP 2 and fix by 8 x M8 long bolts (E) ,
8 x Φ8 flat washers (B) , 8 x Φ8 spring washers (C) and 8 x M8 nuts (D).
STEP 4 - Feed wheel axle (11) through holes in wheel trolley section(8)
,feed 2 x M12 washers (G) and attach wheels (10) securing with
1 x M12 nut (F) per wheel. Enlarged view below for your reference.
STEP 5 - Li the oven and aach to well-assembled trolley
and fix by 4 x M6 bolts (H), 4 x Φ6 flat washers (I)
and 4 x Φ6 spring washers (J).
Note - take care when handling, cauon heavy load,
you should seek assistance to li this oven.
STEP 6 - Aach chimney cap (1) to chimney (2)
and feed chimney(2) to oven body (3).
STEP 7 - Aach door (4) to oven body (3).