OUR GUARANTEE
In addition to the comprehensive 18 month warranty as set out below, and your statutory rights, Eco1Limited guarantee that you will save
at least the Eco1recommended selling price of your Saveometer transmitter (any model or part) within 6 months of installation and
permanent connection in the UK during winter months, or you may return it to us (in appropriate protective packaging, fully insured &
prepaid postage please). If you return any unit in good condition, together with your original dated receipt or evidence of purchase and the
relevant utility bills for the year in question, Eco1will refund your purchase price in full providing your Saveometer has remained
permanently connected. You can register on line using www.saveometer.com/register or by completing and posting the enclosed
guarantee card. To enjoy the Eco1Limited unique guarantee your Saveometer must be registered within 14 days of purchase.
18 MONTH WARRANTY
The Saveometer gas transmitter is guaranteed against manufacturing defects for a period of 18 months. This guarantee does not
cover faults caused by misuse of any sort including contravention of the user guide, or when any part of the product has been
dropped or modified in any way. Please take care of your Saveometer gas transmitter. The full term and conditions of your warranty
are set out in the main user guide that accompanied your new Saveometer display.
Technical Specification
Operational Temperature: 5 deg C –45 deg C (41 deg F –113 deg F) at 85% relative humidity
Dimensions: Transmitter 70 mm W x 115H x 35 D, weight 110g ,
Servicing: Do not attempt to service any part yourself. The transmitter is a sealed unit. Opening or removing
covers may expose you to risks and voids all warranties. Refer all servicing only to qualified
engineers at Eco1Limited.
Batteries: The supplied lithium battery will last between 10 to 12 years in normal use.For replacement contact Eco1 Limited or at
www.saveometer.com. Do not attempt to replace the battery yourself.
Dimensions: Transmitter 70 mm W x 115H x 35 D, weight 150g ,
Cleaning: Only clean the transmitter using a dry cloth. Do not use aerosol or liquid cleaners.
UK roll out of Gas & Electricity Supplier installed Smart Meters (SSM’s)
A gradual roll out of supplier‟s smart meters may soon commence throughout the UK. New meters
will be provided by your gas and electricity supplier, and the Government hopes that they will be
installed in all homes by the end of 2020, or perhaps a little later. Technical standards for these
new smart meters are being formulated and when roll out commences the new meters will enable
all gas and electricity companies to accurately monitor both your gas and electricity consumption in
real time, as well as introducing very sophisticated new charging rates and discounts. When the
new open standard has been agreed and published by Ofgem it is the intention of Eco1Limited
that the Saveometer will be adapted to interface and function with every newly installed smart
meter. All Saveometer users who have registered their warranty will be offered either an upgrade
at a substantially discounted price, or alternatively offered a trade-in value when investing in the
latest Saveometer.
Gas transmitter installation guide R27