(2) For tanks and pipes per installation example L/M -3:
Set three-way valve 20 to position IV. (P-096 000)For pipelines as per installation exam-
ple L/M-1 and L/M-2: Open the test valve at the end opposite the leak detector; in case of
multiple pipe interstitial spaces, the test valves must be opened sequentially at the end op-
posite the leak detector.
(3) Check if the measuring instrument registers a vacuum drop. If no pressure drop occurs,
locate and correct the cause.
(4) Close three-way valve 20 in position I, or suction line side shut-off cock (V4A Version) of
test valve(s) respectively.
(5) Set three-way valve 21 to position I. (P-096 000)
(6) Remove the measuring instrument.
6.4.4 Testing the switching values with the Interstitial Space
(1) Connect the measuring instrument to three-way valve 21, position III. (P-096 000)
(2) For tanks and pipes per installation example L/M -3:
Ventilate with three-way valve 20 (position III) (P-096 000)For pipelines as per installa-
tion example L/M-1 and L/M-2: Open the test valve at the end of the interstitial space oppo-
site the leak detector. In case of multiple pipes, the leak detector-side shut-off cocks of the
interstitial spaces not included in the test can be closed.
(3) Check switching values ”Pump ON” and ”Alarm ON” (with visual and audible, if available).
Record the values.
(4) Activate the “mute” button.
(5) Set three-way valve 20 to position I and close suction line side shut-off cock (V4A Version)
or test valve (in MV version, switch “Commissioning” switch) and check switching values
"Alarm OFF” and "Pump OFF”. Record the values.
(6) The unit passes the test if the measured switching values fall within the specified tolerance.
(7) Open any shut-off cocks that were closed prior to the test.
(8) Set three-way valve 21 to position I. (P-096 000)
(9) Remove the test measuring instrument.
6.4.5 Testing the switching values with the test equipment
(1) Connect the testing device to the two hose ends on each of the free pipe unions of three-
way valves 20 and 21. (P-096 000 and P-115 392-a)
(2) Connect the measuring instrument to the tee of the testing device.
(3) Close the needle valve of the testing device.
(4) a) Set three-way valves 20 and 21 to position II. The operating vacuum is built up in the
test vessel. (P-096 000 and P-115 392-a)
b) MV version: Turn switch “Commissioning”, (build-up of operating vacuum).
(5) Ventilate using the needle valve, check switching values ”Pump ON” and ”Alarm ON” (visu-
al and acoustic, if necessary). Record the values.
(6) Activate the “mute” button, if necessary.
(7) Slowly close the needle valve and check switching values “Alarm OFF” and “Pump OFF”.
(MV version, turn ”Commissioning” switch)