Shel lab SCO5A User manual

AIR-JACKETED CO2INCUBATOR
110 – 120 Volts
Installation - Operation Manual
SCO10A SCO5A

2 | Page
Pictured on the front cover, left to right: SCO10A, SCO5A
Note: The SCO10A requires two power outlets.
48TWarning:48T This product contains chemicals, including triglycidyl isocyanurate, known to the State of
California to cause cancer as well as birth defects or other reproductive harm. For more information,
go to 33Twww.P65Warnings.ca.gov33T.
48T¡Advertencia! Este producto contiene sustancias químicas, incluido el triglicidil isocianurato, que el
estado de California sabe que causa cáncer, así como defectos de nacimiento u otros daños
reproductivos. Para obtener más información, visite www.P65Warnings.ca.gov48T.
Avertissement!Ce produit peut vous exposer à des produits chimiques, dont l'isocyanurate de
triglycidyle, reconnu par l'État de Californie pour provoquer le cancer, des anomalies congénitales
ou d'autres problèmes de reproduction. Pour plus d'informations, visitez le site
www.P65Warnings.ca.gov.

3 | Page
SCO5A SCO10A AIR-JACKETED CO2INCUBATORS
110 – 120 Voltage
Part Number (Manual): 4861730
Revision: April 19, 2020
SHEL LAB is a brand of Sheldon Manufacturing, INC, an ISO 9001
certified manufacturer.
Safety Certifications
These units are TÜV CUE listed as air-jacketed CO2Incubators for professional, industrial, or
educational use where the preparation or testing of materials is done at an ambient air pressure
range of 22.14 – 31.3 inHg (75 – 106 kPa) and no flammable, volatile, or combustible materials are
being heated.
The units were tested to the following standards:
CAN/CSA C22.2 No. 61010-1:2012
CAN/CSA C22.2 No. 61010-2-010:2004 Reaffirmed: 2014-07
UL 61010-1:2012-05
UL 61010A-2-010:2002-03
EN 61010-1:2010
EN 61010-2-010:2014
Supplemented by: UL 61010-2-010:2015

4 | Page
TABLE OF CONTENTS
INTRODUCTION .........................................................................................................................................................7
Read this Manual.................................................................................................................................................................... 7
Safety Considerations and Requirements ...................................................................................................................... 7
Contacting Assistance ..........................................................................................................................................................8
Manufacturing Warranty ......................................................................................................................................................8
Engineering Improvements..................................................................................................................................................8
CO2Gas Supply ......................................................................................................................................................................9
Reference Sensor Devices ................................................................................................................................................ 10
RECEIVING YOUR UNIT ...........................................................................................................................................11
Inspect the Shipment............................................................................................................................................................ 11
Orientation Photos ............................................................................................................................................................... 12
Recording Data Plate Information................................................................................................................................... 14
INSTALLATION .........................................................................................................................................................15
Installation Procedure Checklist ...................................................................................................................................... 15
Required Ambient Conditions........................................................................................................................................... 16
Required Clearances........................................................................................................................................................... 16
Power Source Requirements .............................................................................................................................................17
Lifting and Handling ............................................................................................................................................................ 18
Leveling................................................................................................................................................................................... 18
Install the Incubator ............................................................................................................................................................. 19
Deionized and Distilled Water.......................................................................................................................................... 19
Installation - Clean and Disinfect..................................................................................................................................... 19
Install Chamber HEPA Filter and Duct .......................................................................................................................... 20
Shelving Installation............................................................................................................................................................. 21
Connect to the CO2Supply .............................................................................................................................................. 22
Access Port Stopper ........................................................................................................................................................... 23
GRAPHIC SYMBOLS ............................................................................................................................................... 25
CONTROL PANEL OVERVIEW .............................................................................................................................. 27
OPERATION.............................................................................................................................................................. 29
Theory of Operation ........................................................................................................................................................... 29
Put the Incubator into Operation ..................................................................................................................................... 31
Humidify the Incubator ...................................................................................................................................................... 33
Set the Temperature Setpoint ......................................................................................................................................... 34
Muting the Audible Temperature Alarm....................................................................................................................... 35
Automatic Door Cutoffs ..................................................................................................................................................... 35
Start a Flow of CO2............................................................................................................................................................. 36
Set the CO2Setpoint ...........................................................................................................................................................37
Muting the Audible CO2Alarm ........................................................................................................................................ 38
No Gas Supply Alarm (NGS)............................................................................................................................................. 38
Set the Over Temperature Safety .................................................................................................................................. 39
Loading Samples................................................................................................................................................................. 40
Accessory Compatibility.................................................................................................................................................... 40
Data Output Capabilities ................................................................................................................................................... 41
Condensation and the Dew Point .................................................................................................................................. 42
USER MAINTENANCE............................................................................................................................................. 43
Cleaning and Disinfecting................................................................................................................................................. 43
Minimizing Contamination Exposure ............................................................................................................................. 44
Maintaining Atmospheric Integrity ................................................................................................................................. 44
Gas Lines and HEPA Filters.............................................................................................................................................. 45
Electrical Components....................................................................................................................................................... 45
Storing the Incubator.......................................................................................................................................................... 45
Replace the Chamber HEPA Filter ................................................................................................................................. 46
Calibrate the Temperature Display.................................................................................................................................47
Calibrate the CO2 Display .................................................................................................................................................. 51

5 | Page
UNIT SPECIFICATIONS .......................................................................................................................................... 55
Weight..................................................................................................................................................................................... 55
Dimensions............................................................................................................................................................................ 55
Max Shelves For Unit ......................................................................................................................................................... 56
Capacity ................................................................................................................................................................................. 56
CO2.......................................................................................................................................................................................... 56
Temperature ......................................................................................................................................................................... 56
Power...................................................................................................................................................................................... 56
PARTS LIST............................................................................................................................................................... 57
Accessories........................................................................................................................................................................... 58
Ordering ................................................................................................................................................................................. 58

6 | Page
TABLE OF CONTENTS

7 | Page
INTRODUCTION
Thank you for purchasing a SHEL LAB incubator. We know you have many choices in today’s competitive
marketplace when it comes to constant temperature equipment. We appreciate you choosing ours. We
stand behind our products and will be here if you need us.
READ THIS MANUAL
Failure to follow the guidelines and instructions in this user manual may create a protection
impairment by disabling or interfering with the unit safety features. This can result in injury or death.
Before using the unit, read the manual in its entirety to understand how to install, operate, and
maintain the unit in a safe manner. Ensure all end-users are given appropriate training before the unit
begins service.
Keep this manual available for use by all end-users.
SAFETY CONSIDERATIONS AND REQUIREMENTS
Follow basic safety precautions, including all national laws, regulations, and local ordinances in your
area regarding the use of this unit. If you have any questions about local requirements, please
contact the appropriate agencies.
SOPs
Because of the range of potential applications this unit can be used for, the end-user or their
supervisors must draw up a site-specific standard operating procedure (SOP) covering each
application and associated safety guidelines. This SOP must be written and available to all end-users
in a language they understand.
Intended Applications and Locations
This incubator is intended for constant temperature, humidified microbiological incubation
applications in professional, industrial, and educational environments. The unit is not intended for
use at hazardous or household locations.
Power
Your unit and its recommended accessories are designed and tested to meet strict safety
requirements.
•The unit is designed to connect to a power source using the specific power cord type
shipped with the unit.
•Always plug the unit power cord into a protective earth grounded electrical outlet
conforming to national and local electrical codes. If the unit is not grounded properly, parts
such as knobs and controls can conduct electricity and cause serious injury.
•Do not bend the power cord excessively, step on it, or place heavy objects on it.
•A damaged cord can be a shock or fire hazard. Never use a power cord if it is damaged or
altered in any way.
•Use only approved accessories. Do not modify system components. Any alterations or
modifications to your unit not explicitly authorized by the manufacturer can be dangerous
and are not covered by the manufacturing defect warranty.

8 | Page
INTRODUCTION
CONTACTING ASSISTANCE
Phone hours for Sheldon Customer Support are 6 am – 4:30 pm Pacific Coast Time (west coast of
the United States, UTC -8), Monday – Friday. Please have the following information ready when
calling or emailing Customer Support: the model number, serial number, and part number (see
page 14).
support@sheldonmfg.com
1-800-322-4897 extension 4
(503) 640-3000 extension 4
FAX: (503) 640-1366
Sheldon Manufacturing, INC.
P.O. Box 627
Cornelius, OR 97113
USA
MANUFACTURING WARRANTY
For information on your warranty and online warranty registration please visit:
•sheldonmanufacturing.com/warranty
ENGINEERING IMPROVEMENTS
Sheldon Manufacturing continually improves all of its products. As a result, engineering changes and
improvements are made from time to time. Therefore, some changes, modifications, and
improvements may not be covered in this manual. If your unit’s operating characteristics or
appearance differs from those described in this manual, please contact your SHEL LAB dealer or
customer service representative for assistance.

9 | Page
INTRODUCTION
Note: A CO2gas regulator must be purchased separately from the incubator.
Note: Each incubation chamber in an SCO10A must have its own CO2supply.
CO2GAS SUPPLY
Supply Required
The incubator must be connected to a carbon dioxide gas supply system in order to
establish and maintain a CO2-enriched incubation chamber atmosphere. The supply
can be a building CO2gas system or a supply cylinder (tank).
Supply Quality
Use medical or food-grade CO2. The use of industrial CO2 risks introducing contaminants into the
chamber, may damage the incubator, and is not covered by the manufacturing defect warranty.
Supply Source and Pressure
The incubator requires 15 – 20 psi of CO2gas pressure at the incubator intake port (labeled CO2 to
Chamber).
Dual Stage Regulator
If connecting to a supply cylinder, always use a dual-stage CO2pressure regulator. During normal
operations, the incubator injects small quantities of CO2to maintain the chamber gas
concentration, and precise regulation of the gas input flow is vital for the incubator performance.
Some single-stage regulators have two gauges. Make certain your regulator is a dual-stage
regulator.
Regulator Not Included
See page 58 for ordering information.

10 | Page
INTRODUCTION
REFERENCE SENSOR DEVICES
Must be purchased separately
Reference sensor devices or a combined device are required for calibrating the
incubator temperature and CO2displays.
Reference devices must meet the following standards:
•Accurate to at least 0.1°C
•Accurate to at least 0.1% CO2
The devices should be regularly calibrated, preferably by a third party.
Temperature Probes
For temperature, use a digital device with wire thermocouple probes that can be
introduced into the incubation chamber through the unit access port. Select
thermocouples suitable for the application temperature you will be calibrating at.
CO2 Sampling
For best CO2accuracy, use a digital gas analyzer with sample tubing connecting to
the incubator CO2sample port. The barbed adapter gas fitting on the sample port
connects to a 3/16-inch (4.76 mm) inner diameter (ID), 5/16-inch (7.94 mm) outside
diameter (OD) tubing.
Why Probes and Tubing?
Reference readings taken outside the chamber using wire temperature probes and
CO2drawn through the sample port avoid chamber door openings. Openings disrupt
the chamber temperature and CO2 concentration level. Each disruption requires a
minimum 1-hour wait to allow the atmosphere to re-stabilize before continuing.
No Alcohol or Mercury Thermometers
Alcohol thermometers do not have sufficient accuracy to conduct accurate
temperature calibrations. Never place a mercury thermometer in the incubation
chamber. Always use thermocouple probes.
CO
2
Reference
Temperature
Reference

11 | Page
RECEIVING YOUR UNIT
INSPECT THE SHIPMENT
•When a unit leaves the factory, safe delivery becomes the responsibility of the carrier.
•Damage sustained during transit is not covered by the manufacturing defect warranty.
•Save the shipping carton until you are certain that the unit and its accessories function properly.
When you receive your unit, inspect it for concealed loss or damage to its interior and exterior. If you
find any damage to the unit, follow the carrier’s procedure for claiming damage or loss.
1. Carefully inspect the shipping carton for damage.
2. Report any damage to the carrier service that delivered the unit.
3. If the carton is not damaged, open the carton and remove the contents.
4. Inspect the unit for signs of damage. Use the orientation images in this chapter as
references.
5. The unit should come with an Installation and Operation Manual.
6. Verify that the correct number of accessory items has been included.
7. Carefully check all packaging for accessory items before discarding.
Included Accessories
Model Copper Pan Token Humidification Pan Access Port Stopper* Leveling Feet
SCO5A
1
1
1
4
SCO10A 2 2 2 4
Model Chamber HEPA Filter Chamber Filter Cap CO2Tubing Kit Ceiling Air Duct
SCO5A 1 1 1 1
SCO10A
2
2
2
2
Model Shelves Shelf Slides Shelf Standards Power Cord
SCO5A
3
6
4
1
SCO10A
6
12
8
2
*The access port stopper ships installed in each unit chamber access port.

12 | Page
RECEIVING
ORIENTATION PHOTOS
SCO5A
Back of Unit
CO
2
In Port
Fuse in Power Inlet
USB-Style Port
Control Panel
CO
2
Sample Port
(Side of Unit)
Chamber Gasket
Ceiling Air Duct
Chamber HEPA Filter
Door Latch
Humidification Pan
Viewing Door (Glass)
Chamber Door
Chamber Door Handle
Viewing Doorknob
Access Port
(Side of Unit)
Door Gasket

13 | Page
RECEIVING
Top Incubator
SCO10A
Mounting Bracket and
SCO10 A Data Plate
Bottom Incubator
See the
SCO5A depiction on the previous page for details on the individual incubators in the stack.

14 | Page
RECEIVING
RECORDING DATA PLATE INFORMATION
Record the unit model number, serial number, and part number below for future reference
Customer Support needs this information to provide accurate help during support calls and emails.
•SCO5A
oThe data plate is located on the inside of the incubation chamber door in the top
right corner.
•SCO10A
oThe data plate for the SCO10A is located on the exterior, left-side of the incubator
stack, on or just above the mounting brace.
Data Plate Information
MODEL NO:
SERIAL NO:
PART NO:

15 | Page
INSTALLATION
INSTALLATION PROCEDURE CHECKLIST
For installing the unit in a new workspace location.
Pre-Installation
Verify a CO2gas supply source suitable for your application is
available and can be connected to the incubator, page 9.
Check that the required ambient conditions for the unit are met,
page 16.
Check that the spacing clearance requirements are met, page 16.
•Unit dimensions may be found on page 52.
Check that a suitable electrical outlet and power supply is present,
page 17.
Install the incubator in a suitable location
Review the lifting and handling instructions, page 18.
Install the unit leveling feet, page 18.
Install the incubator in its workspace location, page 19.
Set up the incubator for use
Clean and disinfect the unit and accessories (except the HEPA
filter), page 19.
Install the chamber HEPA filter and ceiling air duct in the
incubation chamber, page 20.
Install the shelving, page 21.
Connect the incubator to the CO2gas supply source, page 22.
Verify that the silicone stopper is installed in the access port
inside each incubation chamber, page 23.

16 | Page
INSTALLATION
REQUIRED AMBIENT CONDITIONS
These units are built for use indoors at room temperatures between 15°C and 30°C (59°F and 86°F), at
no greater than 80% Relative Humidity (at 25°C / 77°F The ambient temperature should not change by
2°C (3.6°F) or more during operation.
Operating outside these conditions may affect the incubator temperature performance.
When selecting a location to install the unit, consider all environmental conditions that can adversely
impact its temperature performance. These include:
•Proximity to ovens, autoclaves, and any device that produces significant radiant heat
•Heating and cooling vents or other sources of fast-moving air currents
•High-traffic areas
•Direct sunlight
REQUIRED CLEARANCES
These clearances are required to provide airflows for ventilation and cooling.
4 inches (102 mm) of clearance is required on the sides and back.
2 inches (51 mm) of headspace clearance is required between the top of the unit and any overhead
partitions.
Power Cord
2” (51 mm)
4” (102 mm)
4” (102 mm)

17 | Page
INSTALLATION
POWER SOURCE REQUIREMENTS
When selecting a location for the unit, verify each of the following requirements is satisfied.
Power Source: The power source must match the voltage and amperage requirements listed on the
unit data plate. These units are intended for 110 – 120 volt, 50/60 Hz applications at the following
amperages:
Model Amperage Model Amperage
SCO5A 6.0 Amps SCO10A 6.0 Amps
*The SCO10A comes with two power cords. It requires 6.0 amps for each cord.
•The wall power source must be protective earth grounded.
•The unit may be damaged if the supplied voltage varies by more than 10% from the data
plate rating.
•Use a separate circuit to prevent loss of the unit due to overloading or circuit failure.
•The recommended wall circuit breakers for these units are 15 amps.
•The wall power source must conform to all national and local electrical codes.
Power Cord: The unit must be positioned so that all end-users can quickly unplug the cord in the
event of an emergency.
•Each unit is provided with a 125-volt, 15 amp, 9ft 5 in (2.86m) NEMA 5-15P power cord.
Always use this cord or an identical replacement.
Fuses: Each unit ships with a fuse installed in the power cord inlet.
•The fuse must be installed and intact for the unit to operate.
•Always find and fix the cause of a blown fuse prior to putting the unit back into operation.
•Fuse type:
o250V T10 Amp, 5x20mm
Standard
NEMA 5-15R
wall socket

18 | Page
INSTALLATION
LIFTING AND HANDLING
The unit is heavy. Use appropriate lifting devices that are sufficiently rated for these loads. Follow these
guidelines when lifting the unit.
•Lift the unit only from its bottom surface.
•Doors, handles, and knobs are not adequate for lifting or stabilization.
•Restrain the unit completely while lifting or transporting so it cannot tip.
•Remove all moving parts, such as shelves and trays, and lock doors in the closed position
during transfers to prevent shifting and damage.
LEVELING
Install the leveling feet in the 4 corner holes on the bottom of the unit. The unit must be level and
stable for safe operation.
Note: To prevent damage when moving the unit, turn all 4 leveling feet so that the leg of each foot
sits inside the unit.

19 | Page
INSTALLATION
INSTALL THE INCUBATOR
Install the unit in a workspace location that meets the criteria discussed in the previous entries of the
Installation section.
DEIONIZED AND DISTILLED WATER
Do not use deionized water to clean the unit, even if DI water is readily available in your laboratory.
•The use of deionized water may corrode metal surfaces and is not covered by the
manufacturing defect warranty.
•The manufacturer recommends the use of distilled water in the resistance range of 50K
Ohm/cm to 1M Ohm/cm, or a conductivity range of 20.0 uS/cm to 1.0 uS/cm, for cleaning
applications.
INSTALLATION -CLEAN AND DISINFECT
The manufacturer recommends cleaning the shelving, ceiling air duct, and chamber prior to Installing
the shelving and ceiling duct in the chamber.
•The unit was cleaned at the factory but may have been exposed to contaminants during
shipping.
•Remove all wrappings and coverings from shelving and the ceiling air duct prior to cleaning
and installation. Do not clean the shelving with deionized water.
•Do not clean the chamber HEPA filter.
•Please see the Cleaning and Disinfecting procedure on page 43 in the User Maintenance
chapter for information on how to clean and disinfect without damaging the unit.

20 | Page
INSTALLATION
INSTALL CHAMBER HEPA FILTER AND DUCT
Note: Exercise caution to avoid striking the sensors and blower fan
wheel on the chamber ceiling when installing the duct.
Note: The incubator must be turned off and unplugged when carrying
out this procedure.
The ring-style chamber HEPA filter traps particulates, as well as
isolating and killing airborne microbes in the incubation chamber.
Perform the following steps to install the filter and ceiling air duct.
Snap the chamber HEPA filter to the mounting collar on the
chamber ceiling air duct.
•It may be necessary to tilt the filter to one side or the
other.
Snap the filter cap to the HEPA filter.
Move the air duct into the incubation chamber with the
attached HEPA filter facing down.
Mount the back of the air duct on the rear chamber mounting
pins, one pin at a time.
Mount the front of the duct on the front chamber mountings,
one at a time.
Back
Step 1
Filter Cap
Back
Step 2
Step 3
Step 5
Front
Step 4
Rear
Mounting Pin
Chamber
Ceiling Air
Duct
Chamber
HEPA Filter
Front
Mounting Pin
This manual suits for next models
1
Table of contents
Other Shel lab Accessories manuals

Shel lab
Shel lab SMI Series User manual

Shel lab
Shel lab SMI31-2 User manual

Shel lab
Shel lab SMI2 User manual

Shel lab
Shel lab SCO6AD-2 User manual

Shel lab
Shel lab SCO5W User manual

Shel lab
Shel lab 5215 User manual

Shel lab
Shel lab SCO6AD User manual

Shel lab
Shel lab SCO6WE-2 User manual

Shel lab
Shel lab SCO6WE User manual