SHENXI MACHINERY CO., LTD-CHINA

To Customer
The outstanding features of the hoist produced by our Company are safe, reliable, stable and
flexible in use.
Thank you for selecting and using our construction hoist! Please carefully read the Manual
before operation and keep it safe for query.
Our Company is dedicated to the updates of the product; no further notification will be given
if there are changes. Contact us if you have any questions or concerns.
The design and manufacture basis standards for SC-Series construction hoist are as following:
Builders hoists for persons and materials with vertically guided cages
--GB 26557-2011 , China
Manufacture Number: Manufacture Date:Compile Date: Version:
A
Address: 121 Furongyi Road, Xishan District, Wuxi City, Jiangsu China
Tel86-510-88215261
Fax86-510-88215261
Websitewww.shenxi.com
www.suspendedplatform.net
Email[email protected]

Technical parameter table of SHENXI SC-Series construction hoist
Remark1.Standard cage dimensionL×W×Hm3.0×1.3×2.5澝3.0×1.4×2.5澝3.2×1.5×2.5 and etcspecial dimension can be made according to requirement of customerͺ
2.Liting height increased can be design according to the requirement of customerͺ
3.Cages and the cage door should be use made by steel mesh grid澝galvanized sheet澝aluminum plate澝checkered plate and so onalso according to the requirement of customerͺ
4.Mast and mast tie can be painted or hot galvanizing processingͺ
5.Motor/reducer option:SEW or NORDͺ
6.No further notification will be given if there are changes.

Cable Ctolly Type Construction Hoist Overall View
Guide Rail
Lifting Hoist
Drive System
Tie-in
Cage
Cable Trolly
Guard rail Electric System
G
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net

Cable Drum Type Construction Hoist Overall View
Lifting Hoist Guide Rail
Cage
Drive System
Tie-in
Cable Drum
Guard rail
Electric System
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net

CONTENTS
Application Guidelines-----------------------------------------------------------------------------A0
A.1 General conditions for using the construction hoist-----------------------------------A1
A.1.1 Climate and geographical conditions----------------------------------------------A1
A.1.2 Environmental conditions -----------------------------------------------------------A3
A.1.3 Conditions related to the design----------------------------------------------------A3
A.1.4 Installation conditions----------------------------------------------------------------A5
A.1.5 Conditions for auxiliary loading and unloading--------------------------------A6
A.2 General responsibility provisions---------------------------------------------------------A6
A.2.1 Provisions related to users-----------------------------------------------------------A6
A.2.2 Provisions related to using conditions---------------------------------------------A8
A.2.3 Provisions related to special risks--------------------------------------------------A9
A.2.4 Provisions related to all stages of using the construction hoist ----------- --A10
A.3 Safety signal-----------------------------------------------------------------------------------A11
A.3.1 Description------------------------------------------------------------------------------ A11
A.3.2 Terms----------------------------------------------------------------------------------- A12
A.3.3Warning signal board---------------------------------------------------------------- A12
Security Rule-----------------------------------------------------------------------------------------B0
B.1 User safety responsibility--------------------------------------- --------------------------- B1
B.2 Safety requirements in installation and disassembly phase------------------------- B1
B.2.1 Responsibilities------------------------------------------------------------------------ B1
B.2.2 Safety measures before installation and disassembly-------------------------- B1
B.2.3 Safety measures during installation and disassembly ------------------------- B2
B.2.4 Safety measures after installation-------------------------------------------------- B3
B.2.5 Safety measures for acceptance test and inspection---------------------------- B5
B.3 Periodic inspection and test---------------------------------------------------------------- B5
B.3.1 Requirements on periodic inspection and test ---------------------------------- B5
B.3.2 Daily safety inspection---------------------------------------------------------------- B6
B.4 Operational safety---------------------------------------------------------------------------- B7
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net

B.4.1 Responsibilities------------------------------------------------------------------------B7
B.4.2 Safety measures for operation----------------------------------------------------- B7
B.5 Maintenance----------------------------------------------------------------------------------B8
B.5.1 Responsibilities----------------------------------------------------------------------- B8
B.5.2 Safety measures for repair and maintenance-----------------------------------B8
Overview and Technical Features--------------------------------------------------------------- C0
C.1 Overview------------------------------------------------ ------------------------------------- C1
C.2 Performance parameter table----------------------------------------------------------- C2
C.3 Brief introduction of construction principle------------------------------------------ C3
Foundation Setting--------------------------------------------------------------------------------- D0
D.1 P Calculation on Bearing Capacity of Foundation-----------------------------------D1
D.2 Model Selection of Concrete Foundation---------------------------------------------- D2
D.3 Concrete Foundation of Mast Tie------------------------------------------------------- D3
D.4 Notes in making concrete foundation---------------------------------------------------D4
Mast and Mast Tie----------------------------------------------------------------------------------E0
E.1 Configuration of Mast--------------------------------------------------------------------- E1
E.2 Type and Selection of Mast Tie---------------------------------------------------------- E3
E.3 Connection of Mast Tie and Wall--------------------------------------------------------E4
E.4 Maximum Installation Spacing and Maximum Cantilever Height of Mast Tie----
---------------------------------------------------------------------------------------------------------- E5
E.5 Calculation of Acting Force F of Mast Tie Applying to Wall Space-------------- E6
Installation and Commissioning------------------------------------------------------------------ F0
F.1 Installation Procedure---------------------------------------------------------------------- F1
F.2 Preparation before Installation----------------------------------------------------------- F1
F.3 Installation------------------------------------------------------------------------------------ F3
F.3.1 Precautions prior to installation----------------------------------------------------- F3
F.3.2 Installation of the base frame, several mast sections below and guard rails of
the base frame-----------------------------------------------------------------------------------------------F3
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net

F.3.3 Installation of cage, drive system guard rail on the top of cage and jib
------------------------------------------------------------------------------------------------------F5
F.3.4 Heighten the mast to 10.5m, then heighten the mast tie to 15m after
attachment of it----------------------------------------------------------------------------------------------F6
F.4 Installation of Electrical Equipment, Control System and Overload Protector
-----------------------------------------------------------------------------------------------------F6
F.4.1 Installation of electrical equipment and control system------------------------- F6
F.4.2 Installation of overload protection device------------------------------------------ F7
F.4.3 Overload protection device quick setup guide-------------------------------------F8
F.5 The Installation of Limit Cam at the Bottom of Mast and Power Driven Lifting
Test------------------------------------------------------------------------------------------------------------ F9
F.6 The Machine Commissioning-------------------------------------------------------------- F9
F.6.1 Guide roller gap adjustment---------------------------------------------------------- F9
F.6.2 Meshing clearance adjustment of rack and pinion------------------------------- F10
F.6.3 Clearance adjustment of back pinion and rack----------------------------------- F10
F.6.4 Adjustment of cable trolley ----------------------------------------------------------- F10
F.6.5 Adjustment of upper and lower limiting switch touch iron---------------------F10
F.6.6 All-Round lubrication of hoist-------------------------------------------------------- F10
F.7 Drop Test--------------------------------------------------------------------------------------- F10
F.7.1 Operational requirements of anti-falling safety device---------------------------F10
F.7.2 Drop test description-------------------------------------------------------------------- F11
F.7.3 Drop test method-------------------------------------------------------------------------F11
F.7.4 Reset of anti-falling safety device-----------------------------------------------------F12
F.8 Heightening of the mast (meanwhile installing the mast tie) and the installation of
limit cam block----------------------------------------------------------------------------------------------F12
F.8.1 Heightening of the mast----------------------------------------------------------------F12
F.8.2 Installation of limit cam on the top of mast----------------------------------------F13
F.9 Installation of Mast Tie--------------------------------------------------------------------- F14
F.10 Installation of Cable Guiding Device--------------------------------------------------- F14
F.10.1 Installation of cable collecting basket and cable protecting rack------------ F14
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net

F.10.2 Installation of cable trolly type of cable guiding device-----------------------
-
F16
F.11 Installation of Floor Call System (Selective Assembly) ----------------------------
-
F18
Operation---------------------------------------------------------------------------------------------- G0
G.1 Safety Check before Operation----------------------------------------------------------- G1
G.2 Operation-------------------------------------------------------------------------------------- G2
Check and Lubrication----------------------------------------------------------------------------- H0
H.1 Safety Cautions------------------------------------------------------------------------------ H1
H.2 Daily Check-----------------------------------------------------------------------------------H1
H.3 Weekly Check--------------------------------------------------------------------------------H2
H.4 Monthly Check------------------------------------------------------------------------------ H2
H.5 Seasonal Check------------------------------------------------------------------------------ H2
H.6 Yearly Check---------------------------------------------------------------------------------H3
H.7 Special Inspection--------------------------------------------------------------------------- H3
H.8 Lubrication----------------------------------------------------------------------------------- H5
Maintenance------------------------------------------------------------------------------------------- I0
I.1 Electrical system failure inspection------------------------------------------------------- I1
I.2 Mechanical system fault inspection experience adjustment diagnosis method
--------------------------------------------------------------------------------------------------- I3
I.3 Replacement of wearable parts------------------------------------------------------------ I5
Disassembly-------------------------------------------------------------------------------------------- J0
J.1 Disassembly of Safety Setup Procedure--------------------------------------------------J1
J.2 Preparatory Phase of Disassembly Operation------------------------------------------J1
J.3 Implementation Phase of Disassembly---------------------------------------------------J2
J.4 Disassembly Operation Procedure--------------------------------------------------------J2
Appendix
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net
O
C

Application Guidelines
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net
A0

A.1 General conditions for using the construction hoist
General conditions for using the construction hoist has described all conditions stated in such relevant parts of
this manual as Chapter C “Overview and technical characteristic”, Chapter D “Basic setup” and Chapter E “Mast tie
and tie-in”. Please consult with our company for those conditions that are not stipulated.
Some particularly important situations about operation of construction hoist will be described again by illustration
in relevant parts of this manual.
A.1.1 Climate and geographical conditions
A.1.1.1 Wind
The using conditions of the construction hoist, such as standard height, counter-force and pressure under the
base mat, are relying on standard wind speed at the location of the construction hoist.
Standard wind speed (GB50009. 2001) is the average wind speed tested in the place that is 10 meters above the
flat ground for successive 10 minutes.
A.1.1.2General conditions
The standard wind speed during the operation of the construction hoist should use the average wind speed
diagram of the located country to determine the standard wind speed area.
Please consult with our company for different standard wind speed areas of other nations or areas except China.
A.1.1.3 Special conditions, such as:
ƔNo average wind speed diagram;
ƔThere are special stipulations or some other situations in the located country or area;
ƔThe altitude is higher than that marked in the average wind speed diagram;
ƔBasin, defile, mountain pass, hills, etc.
Ask users to design in advance to determine the standard average wind speed at the installation location of the
construction hoist. Users can also consult with our company and provide relevant data.
A 1.1.4 Operation of construction hoist
The construction hoist can only be operated where the maximum wind speed is less than 72km/h.
A.1.1.5 Installation, dismantling and location changing of the construction hoist
Installation, dismantling and location changing of the construction hoist can only be conducted when the
maximum wind speed (gust of wind) is less than 45km/h.
A.1.1.6 The environmental air temperature tested in the shady place
The temperature is one that is tested within a non-hermetic and wind &rain-proof cover that is 2 meters above
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net
A1

the ground and within a radius of 100 meters at the location of construction hoist.
Unless otherwise stipulated in the contract (such as special reasons from the located country), the temperature
scope for operating the construction hoist is: working state (non-working): -20ćto +40ć,
When the temperature is not within the scope, please stop the operation of the construction hoist, otherwise, it
should have risks of abnormal operation or damaging the electrical components due to abnormal heating.
A.1.1.7 Humidity and precipitation
The humidity for operating the construction hoist (working or non-working state), precipitation: the maximum
humidity is 95% non-coagulation (unless otherwise stipulated in the contract).
The maximum humidity of the storage of the construction hoist (after dismantling) is 100% .
A.1.1.8 Frost, ice, snow
Frost, ice and snow can increase the weight of the structural parts and they can accumulate with wind and rain.
Frost, ice and snow can damage the parts in the operation and, at worst, can have the risk for persons on duty to fall..
When the construction hoist is covered with frost, ice and snow, the operation of the construction hoist is
prohibited.
A.1.1.9 Thunder and lightning
The thunder and lightning can electrify the structural parts of the construction hoist and endanger persons
directly or indirectly contacting the construction hoist with electric shock hazard. For example: on the steel structure,
tie-in or base frame’s guard rail of the construction hoist.
If storm is possibly coming, operation of the construction hoist should be stopped and set it under non-working
state. Don’t board or leave the construction hoist during the thunderstorm period.
If operators fail to leave the construction hoist in time (thunderstorm happens suddenly), never try to
leave the construction hoist during the thunderstorm period. The risk can be much lower if operators
stay in the cage, but don’t touch the control panel.
A.1.1.10 Sand storm
After the sand storm, sand can be blown into the motor and structural parts and block the gap.
Before restarting, sand-dust in the motor and structural parts should be completely cleared, dismantle movable
parts of relevant structures if necessary.
A.1.1.11 Flood, tide
Unless otherwise stipulated in the contract, the design of the construction hoist has considered these factors.
When encountering flood or tide, the stability of the construction hoist decreases, and should stop operating
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net
A2

immediately.
A .1.1.12 Earthquake
Unless otherwise stipulated in the contract, the design of the construction hoist has not considered earthquakes
of any magnitude.
A.1.1.13 Special installation
Unless otherwise stipulated in the contract, the design of the construction hoist has not considered installation
on the moving foundation, such as RIG, local vessel and floating caisson etc.
A.1.1.14 Mast-tie of the construction hoist
The mast-tie of the construction hoist should be designed to bear the force speculated in the technical parameters
of the construction hoist, and it should be strictly produced within the indicated tolerance range.
A.1.2 Environmental conditions
A.1.2.1 Environment with radioactive chemicals
Unless otherwise stipulated in the contract, the allowable maximum concentration where the construction hoist
is operated should comply with that in the industrial zone or in the areas with heavy traffic.
A.1.2.2 Environment with explosives
The construction hoist can not be used in the environment with explosives.
A.1.2.3 Electromagnetic field
Unless otherwise stipulated in the contract, the construction hoist can be used in the environment whose
electromagnetic field is lower than 10V/m, such as 100kw broadcast or television transmitter within 500 meters
away from the construction hoist or portable transmitter within 0.5m from the electrical cabinet or control panel.
As all the metal structural parts, construction hoist can interfere the emission and receiving of the Hertz wave.
A.1.2.4 Radiation
The construction hoist can not be radiated.
A.1.3 Conditions related to the design
A.1.3.1 Users should be responsible for the adaptation of the construction hoist to the construction site.
A.1.3.2 Power supply
The working power supply and fluctuation scope designed for the construction hoist must be strictly obeyed. Failing
to comply with the given value can lead to the abnormal operation of the construction hoist.
A.1.3.3 Station of operators
In accordance with the selected category, the operators of the construction hoist can conduct in the cab of the
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net
A3

cage or in the cage.
A.1.3.4 Safety device
The safety device of the construction hoist (all the inhibited devices) is prohibited to be operated beyond the
using scope. The adjustment scope of the safety device can not be changed arbitrarily to hinder its operation or
make it lose function.
A.1.3.5 Protection mechanism/ protection device is used to prohibit access to dangerous areas. It can not
be canceled in any case The construction hoist can not be started before all the protection devices are properly
placed (such as safety shield, separating rail, railing and cover plate etc.).
A.1.3.6 General lifetime
The general lifetime of the construction hoist is used to calculate the minimum lifetime of the construction
hoist under abrasion state.
Unless otherwise stipulated in the contract, the general lifetime of the construction hoist should comply with
the ranking method in the standard GB10054 . This ranking method has separately stipulated the lifetime of the
construction hoist and its structural parts.
A.1.3.6.1 Working class of structural parts
The general lifetime of structural parts is represented by the number of the operating cycle (one operating
cycle=the whole circulating process of one cage lifting and one cage descending). The grade of the working class
of the construction hoist is A6.
A.1.3.6.2 Working class of mechanism
The general lifetime of mechanical parts is represented by the working hours of this mechanism. The grade of
the general lifetime of mechanical parts is determined by the category of the construction hoist and its operation.
The loading status of the mechanism stipulates the lifetime of the mechanical parts. The grade of the general
working class of mechanical parts is M5.
A.1.3.7 Advertisement scutcheon of users
Unless otherwise stipulated in the contract, users could not install advertisement scutcheon at will without the
written consent of the manufacturer of the construction hoist.
A.1.3.8 Fire extinguisher
Users are responsible for the provision and installation of fire extinguishers in the cab of the cage or in the cage.
A.1.3.9 Modification or welding of the construction hoist. Without the written consent of manufacturer of the
construction hoist, modification of the construction hoist’s structure (such as adding or refitting parts, incision,
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net
A4

welding etc.) is prohibited.
A.1.3.10 Changing the adjustment device (such as calibration value, adjustment value, etc.) of the construction
hoist by installing accessories is prohibited.
A.1.3.11 Matching of structural parts and replacement and utilization of parts. Users should be responsible for
using the exchangeable structural parts/parts that are not provided or suggested by the manufacturer of the
construction hoist.
Non-genuine parts or parts without confirmation of the manufacturer of the construction hoist are prohibited
for replacement.
A.1.3.12 Custody and check of the construction hoist
Custody of the construction hoist: store in good state and use safely. Check the construction hoist by confirming
the check frequency, the check cycle and the check contents in accordance with items stipulated in this manual.
If relevant standards and provisions of the located place of the construction hoist are stricter than those in this
manual, then check in accordance with the former ones. Fill in tracking card of the construction hoist as the
speculations provided in this manual.
A.1.3.13 Disposal of wastes
Dispose all the wastes in accordance with standards and provisions of the located place, such as: grease, waste
oil, etc....
A.1.4 Installation conditions
If the wind velocity is over 12.5m/s or the weather is bad including thunder and snow, the installation and
dismantling of the construction hoist can not be conducted.
A.1.4.1 Distance from the fixed barrier
Keep the minimum distance between the mobile protrusion for the lifting or descending of the construction
hoist and fixed barrier as stipulated . If not stipulated, this distance from the fixed barrier is at least 0.25 meter.
A.1.4.2 Distance between the construction hoist and the overhead power transmission line
Ensure that the safe distance between parts of the construction hoist and overhead transmission line complies with
the stipulation of the located place of the construction hoist. If not stipulated, the vertical distance is 4 meters
when the voltage is lower than or equal to 40kv, . And the horizontal distance is 2 meters. 5 cm will be added
to the distance for each 1kv exceeding 40kv.
A.1.4.3 Strength requirement of concrete foundation
The concrete foundation of the construction hoist must meet the technical requirements of its installation and
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net
A5

construction intensity before the equipment is installed.
A.1.4.4 Requirements of power box and cables
The power box must be for the exclusive use of the construction hoist, and can not be shared with other electrical
equipment. The voltage and current of the cables connecting to the power box should meet the utilization
requirements of the construction hoist, and the cables must have reliable grounding connection.
A.1.4.5 Installation acceptance
Cooperating with the testing authorities of the located place of the construction hoist, users should conduct
inspection and acceptance of the installed construction hoist in accordance with all the contents in “Rules for
Inspection and Supervision of the Construction Hoist” (GZJG 121. 2002) (Report of Inspection and Acceptance of
Construction Hoist). It can not be used until it is accredited.
A.1.5 Conditions for auxiliary loading and unloading
A.1.5.1 Auxiliary loading and unloading equipment of the construction hoist load or unload the standard knot
load with the help of the installation suspender at the top of the cage. Prohibit the use of all machines and tools that
will generate dynamic influence for loading and unloading, such as electromagnet, grapnel, bucket, etc
A.1.5.2 Loading and unloading of the standard knot load
a) Don’t crane the standard knot load that is not tied tightly;
b) Don’t slantways crane the standard knot load;
c) The craned standard knot load should keep a vertical line with the lifting hook;
d) Don’t add weight to the craned standard knot load.
e) Operators should closely monitor it when the installation suspender is lifting or descending the standard knot
load.
A.1.5.3 No man riding
The installation suspender of the construction hoist can not be used for man riding. If man riding is allowed for
the construction hoist in the located place or country, users shall be fully responsible for it.
A.2 General responsibility provisions
The responsibility provisions involve all relevant personnel. Especially suitable for administrators and operators
of the construction hoist, and relevant personnel should also carefully abide by and execute the provisions.
The use of the construction hoist should strictly abide by Article A.1 “General Conditions for Using the
Construction Hoist”.
A.2.1 Provisions related to users
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net
A6

The administrators and operators of the construction hoist should comply with provisions of the located place
related to protection and accident precaution for installation, dismantlement and operation of the construction hoist.
A.2.1.1 Provisions for the administrators of the construction hoist
a) Entrust the operation of the construction hoist to qualified operators;
ƔAge should comply with the provisions of the located country of the construction hoist.
ƔPhysical conditions should comply with the requirements (eyesight, aural hearing, reactive ability, flexibility,
fit for working at heights).
ƔObtain certificate through training of relevant institutions, and confirm the relevant certificates are qualified
and valid, and have sufficient knowledge about the risk of this job (electric risk, working at heights).
ƔProhibit personnel who don’t comply with the above conditions from operating this construction hoist.
b) Specify responsibilities of all operators of the construction hoist;
ƔEntrust the commanding rights for installation, dismantlement, testing and maintenance of the construction
hoist to qualified technicians;
ƔHuman resource manager arranges and trains those operators during their internship.
ƔManagers should draw up a preliminary scheme for installation and dismantlement that need special
requirements.
c) Ensure that operators of the construction hoist know well the safety stipulations and regularly check the
execution of these provisions;
Stipulate that operators of the construction hoist must:
ƔWear properly (such as hair tucked, proper clothing etc);
ƔWear protection articles: safety helmet and safety shoes; wear gloves when doing hand work;
ƔFasten the safety belt when working at heights (more than 3 meters above the ground);
d) Specify and implement special suggestions in the manual.
ƔRequire that operators of the construction hoist not to leave the control panel before cutting off the electricity
of the construction hoist;
ƔWhen installing, dismantling or maintaining the construction hoist, install access device (escalator, aisle way,
platform) that complies with requirements of the located place.
ƔEquip maintenance personnel of the construction hoist with corresponding measurement and repairing tools.
ƔInform operators of the construction hoist to pay attention to dangers related to the work (such as appearance
of persons in the operation area of the cage, whistle for going up and down etc).
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net
A7

A.2.1.2 Stipulations for administrators in the construction site:
ƔInform the constructors at the location of the construction hoist of all the direct or indirect dangers that may
be caused by construction hoist (such as construction site influence, load fluctuation caused by wind, etc).
ƔInform the constructors at the location of the construction hoist of the meaning of the acoustical signal for the
operation of the construction hoist (refer to the chapter of “Safety Signal”).
ƔObtain the cooperation of the constructors in the located place of the construction hoist in proper ways, set up
anti-smash insulation protection device for buildings on the guard rail of the base frame and above the cage of the
construction hoist.
ƔProhibit constructors in the located place of the construction hoist from climbing the standard knot and
adhered strut of the construction hoist.
A.2.2 Provisions related to using conditions
A.2.2.1 Provisions related to mechanical equipment for building construction
Abide by relevant provisions for the use of mechanical equipment of building construction of the located place
Ɣ(Communications and transportation;
ƔArrangement of fire extinguishers;
ƔAttach importance to environmental protection;
ƔControl the receiving and emission of wireless radio frequency;
ƔPeriodical inspection.
A.2.2.2 Climate conditions
Under circumstance of special climate, users in the located place of the construction hoist should draw up
preliminary scheme that should be abided by (such as decreasing the working height, withdrawing from the
construction site).
This scheme can be formulated in accordance with the forecasting system of climate situation set up by the
meteorological department of the place.
A.2.2.3 Access to the construction hoist
ƔThe entry to the cab of the construction hoist should be conducted through a stipulated access when the
construction hoist stops.
ƔKeep the access to the cab of the construction hoist clean: dispose all the wastes, grease dirt, spare parts, tools,
etc; store tools, articles and components in the stipulated place.
ƔThe weight of the personnel, building materials and tools in the cage of the construction hoist should not
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net
A8

exceed the allowable maximum load.
A.2.2.4 Abnormal operation of construction hoist
When the construction hoist operates abnormally, it should be stopped, and checked by professionals and
evaluate its risks; should immediately eliminate abnormal situations that may endanger the safety; record those
abnormal situations in the tracking record of the construction hoist.
A.2.2.5 Power safety
For the possibility that the construction hoist may have electricity, users of the construction hoist in the located
place should formulate a preliminary scheme that should be obeyed for touching the power supply (direct touch or
generating electric arc), for example:
ƔDon’t leave the construction hoist;
ƔDon’t touch the metal structures of the construction hoist;
ƔNotify non-relevant personnel not to get close to and touch the construction hoist;
ƔCut off the power supply, and then leave the construction hoist.
A.2.2.6 Visibility conditions
ƔUse communication tools that are corresponding with the visibility condition of the construction site of the
construction hoist, such as interphone or video system;
ƔSet up enough lighting when the light is very weak.
A.2.3 Provisions related to special risks
A.2.3.1 Power
ƔCut off the power supply of construction hoist when the construction hoist does not need working power
supply;
ƔThe power box of the construction hoist should be closed with keys and monitored by special personnel;
ƔFor the power box with frequency conversion structure, wait at least 10 minutes after cutting off the power
and then close the power box to operate (condenser discharge within the frequency conversion structure).
A.2.3.2 Hydraulic device
ƔRelease pressure before the construction hoist with hydraulic device begins to work, (attention: after the
hydraulic device stops, the pressure can still be maintained). When radioactive oil leakage happens, stop the
operation of the construction hoist should immediately;
ƔDon’t use it to check whether there is leakage or not;
ƔDon’t smoke or use inflammable device near the devices with oil or grease (reducer, gear drive system etc);
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net
A9

ƔDon’t fold or knock hydraulic hose.
A.2.3.3 Chemical substances
ƔThe storage and utilization of chemicals (grease, oil, paint, glue, solvent etc) should comply with special safety
provisions of this product and descriptions on the container.
A.2.3.4 Falling of the objects
Proper measures should be taken within the operating area of the construction hoist to avoid the falling of tools
or non-fixed objects.
A.2.4 Provisions related to all stages of using the construction hoist
A.2.4.1 Transportation
In accordance with the transportation conditions of the construction hoist and situations of automobile lifting
of parts of the construction hoist (such as ground intensity, climatic conditions, slope of passageway, site for loading
and unloading etc.), determine the passageway of the installation site of the construction site.
Set up the alarming device for the ultrahigh parts including cage when transported on roads.
A.2.4.2 Site preparation
The using site should comply with all the technical performances and installation and utilization conditions of
the construction hoist.
A.2.4.2.1 Installation zone of construction hoist
Before installing the construction hoist, analyze relevant restrictions of using site, for example:
ƔRestrictions related to the air zone above the public buildings, other buildings, road, railway and river in the
located place.
ƔWhether there are other tower cranes, airports, electrical wires, electromagnetic wave launcher etc. nearby.
ƔSite state, ground intensity, groove hole, slope, underground construction etc.
ƔRestrictions about the electricity transmission cables, telephone, optical cables etc above the ground of the
located place.
Site for storing components and for lifting and transportation equipment when handling the construction hoist.
Determine the best position for construction hoist, ensure the handling and use of the construction hoist.
A.2.4.2.2 Installation, handling
a) Preparation for installation and disassembly;
ƔThe constructors at the located place of the construction hoist should establish corresponding management
materials, list risks that may happen when installing, handling and appending the construction hoist and
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net
A10
This manual suits for next models
18
Table of contents
Popular Lifting System manuals by other brands

Sunstream
Sunstream Swiftshield SS-AMU13110-FL6B ASSEMBLY, INSTALLATION AND USE MANUAL

Bend-Pak
Bend-Pak P-9000LTF Service manual

Power Fist
Power Fist 9104167 manual

ARJO HUNTLEIGH
ARJO HUNTLEIGH EASYTRACK FS Assembly instructions

SmartMetals
SmartMetals 182.7020 product manual

SmartMetals
SmartMetals 062.7430.01 product manual

Big Joe
Big Joe PTE 30 Series Operation, maintenance, repair parts list

Braun
Braun NUVL855ESM Service manual

Dino lift
Dino lift DINO 135TB Maintenance instructions

Bend-Pak
Bend-Pak HDSO-14P Installation and operation manual

WorkPro
WorkPro LW 461R Using & installation user manual

Bend-Pak
Bend-Pak HD-973P Installation and operation manual