manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. LSP inc.
  6. •
  7. Lifting System
  8. •
  9. LSP inc. LS5013BU User manual

LSP inc. LS5013BU User manual

Other LSP inc. Lifting System manuals

LSP inc. LSC850 User manual

LSP inc.

LSP inc. LSC850 User manual

LSP inc. LSC850D User manual

LSP inc.

LSP inc. LSC850D User manual

LSP inc. LSC1264A User manual

LSP inc.

LSP inc. LSC1264A User manual

LSP inc. LSC1264 User manual

LSP inc.

LSP inc. LSC1264 User manual

LSP inc. LSC1576 User manual

LSP inc.

LSP inc. LSC1576 User manual

LSP inc. EMPKIT User manual

LSP inc.

LSP inc. EMPKIT User manual

LSP inc. LSP16H User manual

LSP inc.

LSP inc. LSP16H User manual

LSP inc. LS5004B User manual

LSP inc.

LSP inc. LS5004B User manual

Popular Lifting System manuals by other brands

probst SDH-H-15 operating instructions

probst

probst SDH-H-15 operating instructions

Bruno OUTDOOR ELITE CRE-2110E Operator's manual

Bruno

Bruno OUTDOOR ELITE CRE-2110E Operator's manual

matev FPS Mounting Assembly Installation Guide

matev

matev FPS Mounting Assembly Installation Guide

Vestil CYL-HLT Series instruction manual

Vestil

Vestil CYL-HLT Series instruction manual

Butts Tools BXS0002 operating instructions

Butts Tools

Butts Tools BXS0002 operating instructions

Safelift MoveAround MA60 Original instructions

Safelift

Safelift MoveAround MA60 Original instructions

Terex Genie Z452513A-48153 Service and repair manual

Terex

Terex Genie Z452513A-48153 Service and repair manual

Granberg InDIago 510 Operating and care instructions

Granberg

Granberg InDIago 510 Operating and care instructions

EUFAB Bike Lift operating instructions

EUFAB

EUFAB Bike Lift operating instructions

morse 82H-124 Operator's manual

morse

morse 82H-124 Operator's manual

Braun NL955 Series Operator's manual

Braun

Braun NL955 Series Operator's manual

Protekt AT 252 instruction manual

Protekt

Protekt AT 252 instruction manual

R. Beck Maschinenbau HS 600 operating manual

R. Beck Maschinenbau

R. Beck Maschinenbau HS 600 operating manual

Nova Technology International, LLC NAS Series quick start guide

Nova Technology International, LLC

Nova Technology International, LLC NAS Series quick start guide

Genie Z-60/34 Operator's manual

Genie

Genie Z-60/34 Operator's manual

Screen Technics INTERFIT Vertical Up Lift instructions

Screen Technics

Screen Technics INTERFIT Vertical Up Lift instructions

Drive DUPONT SAMERY Hermes user manual

Drive

Drive DUPONT SAMERY Hermes user manual

Custom Equipment Hy-Brid 3 Series MAINTENANCE & TROUBLESHOOTING MANUAL

Custom Equipment

Custom Equipment Hy-Brid 3 Series MAINTENANCE & TROUBLESHOOTING MANUAL

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Manufacturers of Lakeshore Products
855 East Chicago Road, Quincy, MI 49082
www.lakeshoreproducts.com • tel: 517.639.3815 • fax: 517.639.4576
Assembly Instructions
LS5013BU
Under Deck Poly Rail Kit
For use with LS5004BU Leg Bundle.
Under Deck Poly Rail Kit Package
PARTS LIST
ref. part no. part name qty.
A 8' Poly Rail with cap 8
B 21032 Bunk Poly Rail Connector 4
C 21026 Bunk U Channel 4
D Y412 3/8" x 3" Hex Bolt 8
E Y403 3/8" x 3/4" Hex Bolt 28
F Y451 3/8" Nylon Lock Nut 36
G Y452 3/8" Flat Washers 12
A
B
C
D
EF
G
page 2
LS0190/0315
9/16" Ratchet 1
9/16" Wrench 1
tools needed
LS5013BU Under Deck Poly Rail Kit (For use with LS5004BU Leg Bundle.)
Assembly includes 2 top rails and 2 side rails.
1. Assemble the 2 side rails rst. Take (4) 8' POLY RAILS and
align them so the ends without caps are facing
each other. Slide:
1 – 3/8" x 3" hex bolt
3 – 3/8" x 3/4" hex bolts
(in that order) into the bolt groove on the uncapped end
of each POLY RAIL. Slide rails together and space the 3/8"
x 3/4" hex bolts so that the rail conector can be bolted on,
and secure the two POLY RAILS together using:
6 – 3/8" nylon lock nuts
2. Slide the 3/8" x 3" hex bolt so that it lines up with the lower
hole in the bunk leg assembly. Push bolt through, add:
1 – 3/8" at washer
1 – 3/8" nylon lock nut
3. Assemble 2 top rails. Take (4) 8' POLY RAILS and align
them so the ends without caps are facing each other.
Slide:
4 – 3/8" x 3/4" hex bolts
into the bolt groove on the end of each POLY RAIL.
Slide rails together and space the 3 hex bolts closest to
the uncapped end so the rail connector can be bolted
on, and secure the two POLY RAILS togetherusing:
6 – 3/8" nylon lock nuts
4. Take the 4th hex bolt and secure the BUNK U CHANNEL
onto the POLY RAIL. Slide the BUNK U CHANNEL out
so that it lines up with bunk leg. Use:
1 – 3/8" x 3" hex bolt
2 – 3/8" at washers
1 – 3/8" nylon lock nut
to secure rails to upright leg.
NOTE: In some cases the top hole may need to be
redrilled for the bolt to t through.
5. Center bunks on lift and tighten all bolts.