Siegenia PORTAL HS User manual

ASSEMBLY INSTRUCTIONS
PVC
Window systems
Door systems
Comfort systems
PORTAL
PremiDoor
with ECO PASS threshold
HS


H48.HSKFS0023EN 12.2019 3/66
Content
Inhalt
1 GENERAL NOTES........................................5
1.1 Target group of this documentaon ............. 5
1.2 Direcves of the Trade Organisaon for
Locks and Fings (Gütegemeinscha
Schlösser und Beschläge e.V.). ...................... 5
1.3 Informaon and instrucon obligaons........ 5
1.4 Dimensions ................................................... 5
2 SAFETY.......................................................6
2.1 Intended use ................................................. 6
2.2 Improper use................................................. 6
2.3 Safety notes .................................................. 6
2.4 Extreme weather condions......................... 7
3 OPERATING AND INSTALLATION INFOR
MATION .....................................................8
3.1 Handle operaon .......................................... 8
3.2 Descripon of symbols.................................. 8
4 PROCESSING SPECIFICATIONS ..................9
4.1 SI construcon drawings............................... 9
4.2 Applicaon diagram ...................................... 9
4.3 Test reports ................................................... 9
4.4 Threshold ...................................................... 9
4.5 Size ranges................................................... 10
4.6 Scheme versions ......................................... 10
5 BASIC HARDWARE...................................11
5.1 Hardware components scheme A ............... 11
5.2 Hardware list basic hardware...................... 12
6 ASSEMBLY OF BASIC HARDWARE ...........14
6.1 Milling bogie wheels ................................... 14
6.2 Insert distance piece ................................... 14
6.3 Installaon of corner drive.......................... 14
6.4 Installaon of bogie wheels ........................ 15
6.5 Gear ............................................................ 16
6.5.1 Milling and drilling the gear................................ 16
6.5.2 Milling the sliding grip ........................................ 17
6.5.3 Fixing gear .......................................................... 18
6.6 Installaon of locking parts and buffer ....... 19
6.7 Inserng the SOFT CLOSE sliding sash........ 20
6.8 Fixing the stop............................................. 21
6.9 Special features scheme C........................... 22
6.9.1 Posioning locking part G................................... 22
6.9.2 Posioning the raised countersunk head screw . 23
7 BURGLAR RESISTANCE ............................24
7.1 Hardware components RC2 ........................ 24
7.2 Hardware components RC3 ........................ 25
7.3 Hardware list RC2 and RC3.......................... 26
7.4 Required preliminary work ......................... 27
7.4.1 Adhesion of profine cover profile...................... 27
7.4.2 Fixing the central lock........................................ 28
7.4.3 Glue profine cover profile to the fixed sash....... 29
7.5 RC2.............................................................. 30
7.5.1 Fix RC2 plate to the sliding sash ......................... 30
7.6 RC3.............................................................. 31
7.6.1 Fix RC3 plate to the sliding sash ......................... 31
7.7 Posion the raised countersunk
head screws ................................................ 32
7.8 Fixing locking part G.................................... 32
8 HOOK BOLT GEAR....................................33
8.1 Hardware components hook bolt gear ....... 33
8.2 Hardware components hook bolt gear ....... 34
8.3 Frame milling .............................................. 35
8.4 Fixing the locking piece............................... 36
8.4.1 Adjustment of hook bolt locking piece............... 37
8.4.2 Adjustment of locking piece .............................. 37
9 BARRIERFREE SYSTEM ...........................38
9.1 Hardware overview..................................... 38
9.2 Stop for barrier-free systems ...................... 39
10 SASH FROM 301400 KG UPWARDS.........40
10.1 Hardware components for sashes
up to 400 kg ................................................ 40
10.1.1 For threshold with running rail 6.5/13 ............. 40
10.1.2 For threshold with running rail 6.5/5 ............... 40
11 ECO PASS THRESHOLD.............................41
11.1 Hardware components threshold ............... 41
11.2 Hardware list ECO PASS threshold............... 42
12 ASSEMBLY OF THRESHOLD ECO PASS.....43
12.1 Sealing wedges............................................ 43
12.2 Screwing on end caps.................................. 43
12.3 Frame corner connector jig......................... 44
12.4 Frame corner connector ............................. 44

12.20194/66 H48.HSKFS0023EN
Content
12.5 Running rail ................................................. 45
12.6 Seal REV ...................................................... 45
12.7 Support rail................................................. 46
12.8 Adapter rail ................................................. 46
12.9 Sealing piece MP......................................... 47
12.10 Sealing pad.................................................. 47
12.11 Flat threshold ............................................. 48
12.12 Sealing the threshold .................................. 48
13 ACCESSORIES FOR ECO PASS
THRESHOLD ............................................49
13.1 Assembly of accessories for threshold........ 51
13.1.1 Fixing sequence .................................................. 51
14 BASE PROFILE..........................................53
15 SOFT CLOSE..............................................54
15.1 SOFT CLOSE hardware overview ................. 54
15.2 Milling on sliding sash ................................. 55
15.3 Posioning the trigger................................. 55
15.4 Inserng the SOFT CLOSE............................ 56
15.5 Tensioning SOFT CLOSE ............................... 57
16 HANDLE OVERVIEW ................................58
17 SILL INSTALLATION..................................60
17.1 Fixing the sill installaon correctly.............. 60
17.2 Reveal connecon....................................... 60
18 PROFILE CROSSSECTIONS ......................61
18.1 SI construcon drawings............................. 61
19 JIGS ..........................................................62
20 MAINTENANCE........................................63
21 CLEANING AND MAINTENANCE..............63

H48.HSKFS0023EN 12.2019 5/66
PremiDoor 88
General notes PORTAL
HS
1 General notes
1.1 Target group of this documentaon
This documentaon is intended for use by specialists
only.
All work described in this document is to be performed
only by experienced professionals with training and
pracce in the assembly, commissioning as well as
the servicing and maintenance of PORTAL hardware.
The safe and appropriate installaon of the PORTAL
hardware is not possible without specialist experse.
Keep these assembly instrucons in a safe place so that
you have quick access to them in case of need.
1.2 Direcves of the Trade Organisaon for
Locks and Fings (Gütegemeinscha
Schlösser und Beschläge e.V.).
The direcves of the Trade Organisaon for Locks and
Fings provide comprehensive informaon on the
correct operaon and maintenance of hardware for
windows and pao doors.
It is mandatory to adhere to these direcves.
You can find the latest versions of the direcves here in
a range of languages:
hp://www.beschlagindustrie.de/ggsb/richtlinien.asp
VHBH – Hardware for windows and pao doors
Guidelines and notes on the product and on liability
VHBE – Hardware for windows and pao doors
Guidelines and notes for end users
The VHBH also contains informaon concerning
„instrucon obligaon“. The "instrucon
obligaon informaon concerning which
documents and informaon must be handed
out by/to the relevant target groups.
1.3 Informaon and instrucon obligaons
The following documents are available for the
performance of the informaon and instrucons
obligaons and must be be handed out to every
(intermediate) retailer and fabricator and subsequently
to the end customer as well as for the performance of
maintenance work:
• Planning documents
• Product catalogues
• Assembly instrucons
• SI construcon drawings
• Maintenance and service instrucons
• Operang instrucons
You can find the latest versions of the documents here
in a range of languages:
hps://downloads.siegenia.com/en/
You can obtain the SI construcon drawings from
SIEGENIA customer service.
Observe your instrucon obligaons towards your
customers, extending to end users!
All our product informaon, which is addressed to
building owners and/or end users, e.g. service and
maintenance instrucons, must be passed on to the
end user.
Our liability is excluded if defects or damage occur as
a result of violaon of our product informaon.
1.4 Dimensions
All dimensions are nominal values and include the
general tolerances (formerly "dimensional variaons").
All nominal values are given in mm.

12.20196/66 H48.HSKFS0023EN
PORTAL PremiDoor 88
Safety
HS
2 Safety
2.1 Intended use
The PORTAL HS hardware is designed only for use in
li& slide windows or pao doors with a maximum
sash weight of 400 kg.
The PORTAL HS hardware allows the horizontal opening
and closing of windows and pao doors from profiles
for liand slide elements.
The mber, PVC, aluminium, steel or material
composite li-slide elements must be installed
vercally, in no circumstances in a sloping posion.
Liand slide elements must be equipped with a
corresponding drainage system. The elements may not
be installed without providing appropriate drainage
and weather protecon.
Intended use comprises the adherence to all
informaon provided in product-specific documents
such as:
• These assembly instrucons
• Product catalogues
• Informaon, informaon from the profile
manufacturer (e. g. for PVC or light metal profiles)
• Direcves VHBE of the Trade Organisaon for Locks
and Fings (GütegemeinschaSchlösser und
Beschläge e.V.).
• Valid, naonal laws and regulaons
Any use beyond the defined intended use is regarded
as misuse.
2.2 Improper use
– When obstacles are placed in the opening range
and thus impede the intended use
– When window and pao door sashes are pressed
or even banged improperly or in an uncontrolled
manner (e.g. by wind) against window reveals in
such a way that either the hardware or the frame
materials or other individual window parts could
be damaged or destroyed, or consequenal
damage could occur
– When addional loads have an impact on
window or pao door sashes (for example,
when children rock on the window or pao door
sashes)
– If hands are placed in the rebate between the
frame and sash when closing windows (risk of
injury)
2.3 Safety notes
The PORTAL HS hardware must not be used in the
following cases:
– in damp locaons
– in environments where the air contains
aggressive, corrosive components
– in environments where the air contains salt
Liand slide elements for wet rooms and for use in
environments with aggressive, corrosive air need a
hardware which meets the special requirements.
Please contact your SIEGENIA sales consultant in such
situaons.
Avoid exposing the hardware directly to water and
do not let cleaning agents come into contact with the
hardware.
The complete set of hardware may only be composed
of original SIEGENIA hardware components. We
assume no liability if non-original or non-approved
system accessory parts are used.
WARNING
Risk of injury due to misuse and inappropriate
assembly of the hardware.
• Only use hardware combinaons which have
been approved by the hardware manufacturer.
• Only use original accessory parts or which have
been approved by the hardware manufacturer.
Do not use acid-releasing sealants to seal the liand
slide elements. These may cause the corrosion of
hardware components.
The li-slide elements may only be surface treated
before the hardware components are assembled.
Treang these surfaces at a later stage can reduce the
funconal capacity of the hardware components. We
assume no liability in this case.
Keep the track of the running rail and all rebates free
from
– cement or plaster residues
– debris
– dirt

H48.HSKFS0023EN 12.2019 7/66
PremiDoor 88
Safety PORTAL
HS
WARNING
Danger of injury if the stop/stopper of the
sliding sash is missing.
When the sliding sash is opened, a shearing zone
arises between the sliding sash and the fixed sash.
Bodily parts could be severed or crushed in the
shearing zone.
• Mount a stop/stopper for the sliding sash. A
shearing zone will hence be prevented.
2.4 Extreme weather condions
DANGER
Danger to life due to sliding sash falling out.
Damage could occur on the top guiding elements
in case of severe wind load and/or impact stress
on the sash, which could lead to breakage of the
guiding elements and to the sash falling out when it
is opened.
• Before hardware is used, the following tests
must be carried out using sliding windows/
pao doors equipped with the hardware under
consideraon of the intended installaon site /
applicaon:
– Tesng the resistance against wind load in
accordance with EN 12211 and classificaon
in accordance with EN 12210.
– Tesng the impact resistance in accordance
with EN 13049. Where special manufacturing
instrucons or fabricaon guidelines exist,
these must be explicitly adhered to
The PORTAL HS hardware must receive special
protecon in the case of extreme prevalent weather
condions e.g. gales or storms in the direct vicinity of
the coast.
PORTAL HS hardware must be sealed against the
permeaon of foreign bodies. Foreign bodies e.g.
sand and building dust lead to an abrasive impact on
the hardware surface and to further damage to the
hardware components.
The permeaon of foreign bodies must be prevented
by the applicaon of suitable seals in the profile system
or geometric profile design.
Especially in the case of externally running sashes,
it is essenal to ensure that the external hardware
components must be protected against gales and
storms.

12.20198/66 H48.HSKFS0023EN
PORTAL PremiDoor 88
Operang and installaon informaon
HS
3 Operang and installaon informaon
3.1 Handle operaon
Liand slide the sliding sash.
Lower the sliding sash. Locking posion.
Operang scker
Aach the operang scker (slide direcon DIN le
or DIN right) in a visible posion on the installed li&
slide sash. You can find the operang scker in the HS
400 basic carton.
Verschlußstellung
Locked position
position fermée
Schiebestellung
Sliding position
position coulissante
Für Spaltlüftung Schiebeügel ca. 10 mm
vor geschlossener Position in Verschlußstellung
schalten. Nicht möglich bei Schema G!
For night vent drop sliding sash 10 mm before
locking position. Not possible with Scheme G!
Pour position aération, laisser descendre le vantail
coulissant en tournant la poignée dans la position
fermeture, et l’arrêter env. 10 mm avant la n de
course. Ne pas possible pour Schéma G!
10003
Spaltlüftungsposition
night vent positon
position ventilation à fente
Verschlußstellung
Locked position
position fermée
Schiebestellung
Sliding position
position coulissante
Spaltlüftungsposition
night vent positon
position ventilation à fente
Für Spaltlüftung Schiebeügel ca. 10 mm
vor geschlossener Position in Verschlußstellung
schalten. Nicht möglich bei Schema G!
For night vent drop sliding sash 10 mm before
locking position. Not po ssible with Scheme G!
Pour position aération, la isser descendre le vantail
coulissant en tournant la poignée dans la position
fermeture, et l’arrêter env. 10 mm avant la n de
course. Ne pas possible pour Schéma G!
1000 4
3.2 Descripon of symbols
ø3Use Ø 3 drill.
ø12 Use groove cuer Ø 12.
Use a Phillips screwdriver.
Use a sloed screwdriver.
Tx25
Use a Torx screwdriver size 25
4Use a hexagon wrench WAF 4 mm.
11 Use a combinaon wrench, size 11 mm.

H48.HSKFS0023EN 12.2019 9/66
PremiDoor 88
Processing specificaons PORTAL
HS
4 Processing specificaons
To comply with the requirements of EN13126-16, a
handle length of 225 mm must be used.
The components of the liand slide element must be
stored at room temperature (20°C) for 24 hours before
processing.
For adhesion and sealing work, we recommend
– OTTO Chemie-OTTOSEAL® S 72
– Collano Adhesives AG-Collano® A 1970
– or a similar product.
The PORTAL HS hardware in this
documentaon is designed for the profile
systemsPremiDoor 88. Subsequent adjustments
can be made due to the system dimensions
influenced by the hardware. If a deviaon
from the system dimensions is only detected
aer the installaon in the window, the
hardware manufacture will not be liable for any
addional expenditure incurred.
4.1 SI construcon drawings
The dimensions of the SI construcon drawings must
be observed for the correct posioning of the holes
and the components on the profile.
You can obtain SL construcon drawings from the field
sales contact person on request.
4.2 Applicaon diagram
ItisessenaltoobservetheapplicaondiagramforPORTALHS
H58.AWD_P_S004EN.
You can obtain applicaon diagrams from the sales
contact person on request.
4.3 Test reports
Producon of the liand slide elements according to
the PORTAL HS system drawings is essenal for the use
of the SIEGENIA test reports for PORTAL HS. You will
obtain these from the sales field service.
Moreover, a wide range of individual systems can be
configured with the completely preassembled li-
slide package COMFORT UNIT. The test reports for this
purpose must be provided by the window producer.
4.4 Threshold
Seal the threshold components and seal between
the threshold and masonry or facade observing the
applicable rules in the trade.
The threshold must be lined at intervals of 300 mm to
be pressure-ght and sound-absorbing.
We recommend the use of stainless steel screws for the
assembly of components on the ECO PASS threshold.
You will find informaon about sill installaon here:
hp://www.bauanschluss.ch
Sill installaon manual
The sill installaon manual from SIEGENIA contains
comprehensive informaon about sill installaon.
You can obtain the relevant informaon on request
from your sales contact person.

12.201910/66 H48.HSKFS0023EN
PORTAL PremiDoor 88
Processing specificaons
HS
4.5 Size ranges
Profile design White Coloured
scheme A C A C
Frame width (RAB) up to 6500 up to 6500 up to 5260 up to 6500
Frame height (RAH) 1288–2600 1288–2600
Sliding sash width (FBS) 737–3000 737–2600
Sash height (FH) sliding sash 1156–24681) 1156–24681)
The FH is reduced by 8 mm for barrier-free elements
Gear backset 37.5
Sash weight max. 400 kg
Rao sash height (FH) / sash width (FB) < 2.5 : 1
1) only in conjuncon with addional lock
4.6 Scheme versions
scheme DIN leor DIN right
A
C
The corresponding SI construcon drawings for the listed schemes are available.

H48.HSKFS0023EN 12.2019 11/66
PremiDoor 88
Basic hardware PORTAL
HS
5 Basic hardware
5.1 Hardware components scheme A
5
5
121)
101)
26
14
21
121)
12
20
19
13
2
8
8
24
15
7
6
16
16
1
4
22 23
18
*See choice of
handles
1) Only with use of the guiding rail from PremiDoor
*
*
2525
9
9
9
33
3
101)
11
131)
27 28
Scheme A
Scheme C
2. 1.
17 17

12.201912/66 H48.HSKFS0023EN
PORTAL PremiDoor 88
Basic hardware
HS
5.2 Hardware list basic hardware
Item
VE for
scheme Material descripon Content
pro VE Material number
AC
1 1 Basic carton PORTAL HS scheme A PMKB0300-10001_
1 Corner drive 1
2 roller 1
3 Brush seal 1
— 1 Basic carton PORTAL HS scheme C PMKB0310-10001_
4 Corner drive 1
2roller 1
3Brush seal 1
1 — Carton PORTAL HS PVC PremiDoor 88 scheme A PMZB4170-10001_
5 Distance piece, boom PremiDoor 88 A0004 1
6 Locking part, top A0005 1
7 Locking part, boom A0005 1
8 Packer HS 1 mm 2
9 Grub screw M 8 x 16 for corner drive and bogie wheels 4
10 Guiding plate PORTAL HS for PremiDoor guiding rail 2
11 Front top guide for gear end 2
12 Chipboard screw 4.5 x 45l for front top guide 4
13 Special dowels for front top guide 4
14 Countersunk screw PZD M5 x 13 for gear on corner drive 1
15 Closing cap grey and brown 1
16 Stop HS for secondary sash gear 2
17 Cover profile for bogie wheels HS 300 2.5
mm 2
—Countersunk tapping screw PH 4.8 x 45 for locking part 4
—Countersunk tapping screw 4.8 x 70 for gear 8
—Countersunk tapping screw 4.8 x 50 for bogie wheels 1
—Countersunk tapping screw 4.8 x 32 for corner drive and bogie wheels 5
— 1 Carton PORTAL HS PVC PremiDoor 88 scheme C PMZB4180-10001_
5Distance piece, boom PremiDoor 88 A0004 2
6Locking part, top A0005 1
7Locking part, boom A0005 1
8Packer HS 1 mm 2
9Grub screw M 8 x 16 for corner drive and bogie wheels 8
10 Guiding plate PORTAL HS for PremiDoor guiding rail 4
11 Front top guide for gear end 4
12 Chipboard screw 4.5 x 45l for front top guide 8
13 Special dowels for front top guide 8
14 Countersunk screw PZD M5 x 13 for gear on corner drive 2
15 Closing cap grey and brown 2
16 Stop HS for secondary sash gear 4
17 Cover profile for bogie wheels HS 300 2.5
mm 4
18 Locking part G for scheme C 2nd sash 1
19 Countersunk screw PH M 6 x 20 1
20 Raised countersunk head screw B 6.6 x 38 1
—Countersunk tapping screw PH 4.8 x 80 for locking parts 4
—Countersunk tapping screw 4.8 x 70 for gear 16
—Countersunk tapping screw 4.8 x 50 for bogie wheels 2
—Countersunk tapping screw 4.8 x 32 for corner drive and bogie wheels 10
Depending on sliding sash width (FBS)
21 1 2 Connecng rod Ø 10 mm Size Length FBS
130
200
335
1015
1640
2750
770 - 1600
1601 - 2400
2401 - 3324
PVSE0030-1000_1
PVSE0060-10001_
PVSE0050-10001_

H48.HSKFS0023EN 12.2019 13/66
PremiDoor 88
Basic hardware PORTAL
HS
Item
VE for
scheme Material descripon Content
pro VE Material number
AC
Depending on sash height (FH)
22
1 2 Gear PORTAL HS300 PZ Size FH*
170
220
260
1185 - 1785
1786 - 2285
2286 - 2685
PGKB0010-52401_
PGKB0020-52401_
PGKB0030-52401_
1 2 Comfort gear PORTAL HS300 PZ Size FH*
220
260
1786 - 2285
2286 - 2685
PGKB4070-52401_
PGKB4080-52401_
23
1 2 Damper kit HS comfort gear PMZB1300-00001_
Damper 1
Locking washer 1
Spiral pin 1
* Informaon of sash height (FH) for installed guiding rail from SIEGENIA.
If the PremiDoor guiding rail is used, the sash height (FH) is 31 mm less.
Depending on frame width (RAB)
24 1 1 Guiding rail PremiDoor 88 Length
Required for use of SOFT
CLOSE
3500
4500
6700
PPFB1200-52401_
PPFB1210-52401_
PPFB1220-52401_
1 2 Accessories for HS-PVC SOFT CLOSE PremiDoor Only in conjuncon with guiding rail from SIEGENIA
25 PremiDoor guide 2 PZUB0460-02111_
1 1 Bag stop for scheme C RAL 9003 RAL 7040
26 Stop 1 821237 PMZB0140-0E601_
27 Cover cap 1
28 Countersunk tapping screw B 4.8 x 70 1

12.201914/66 H48.HSKFS0023EN
PORTAL PremiDoor 88
Assembly of basic hardware
HS
6 Assembly of basic hardware
6.1 Milling bogie wheels
400 300 85
22
85
6.2 Insert distance piece
Insert distance piece into the profile. Posion is fixed
by screwing the corner drive.
6.3 Installaon of corner drive
LV
FB Sash width
LV Length of connecng rod
up to 300 kg
from 301 kg
LV = FB – 658
LV = FB – 1274
1
max. 8 Nm
4
2x
2
Insert the connecng rod into the striker packer of the
corner drive and fix with dowel pins. Tightening torque
max 8 Nm.
Insert the corner drive with connecng rod into the
profile and push through completely. Clip corner drive
onto the fixing bolt of the distance piece.

H48.HSKFS0023EN 12.2019 15/66
PremiDoor 88
Assembly of basic hardware PORTAL
HS
4x
S2
S1
S1
S1
S1 Countersunk tapping screw B 4.8 x 32
S2 Countersunk tapping screw B 4.8 x 38
34
Fix the corner drive to the profile with the
corresponding screws
Clip the cover profile into the corner drive.
6.4 Installaon of bogie wheels
1 2
2x
2x
4
S1 Countersunk tapping screw B 4.8 x 32
S1
S1
max. 8 Nm
Aach bogie wheels with striker packer to the
connecng rod.
Fix the bogie wheels with dowel pins (ghtening
torque max 8 Nm) and then fix to the profile with the
corresponding screws.
3
Clip the cover profile into the bogie wheels.

12.201916/66 H48.HSKFS0023EN
PORTAL PremiDoor 88
Assembly of basic hardware
HS
6.5 Gear
6.5.1 Milling and drilling the gear
Abb. 1: Gear drills on sliding sash
90
210
16
80
69
(16)
38,5
Ø 12
Ø 20
Ø 20
Grip posion for running rail 6.5/5 (barrier-free)
Gear size G
170 398
220, 260 998
Grip posion for running rail 6.5/13
Gear size G
170 406
220, 260 1006
G
For boom profile cylinder bore.
Push jig 16 mm downwards and
fix here with drill Ø 12.
with HSS bi-metal
hole saw

H48.HSKFS0023EN 12.2019 17/66
PremiDoor 88
Assembly of basic hardware PORTAL
HS
6.5.2 Milling the sliding grip
92
12
26
38,5
Grip posion for running rail 6.5/5 (barrier-free)
Gear size G
170 398
220, 260 998
Grip posion for running rail 6.5/13
Gear size G
170 406
220, 260 1006
G

12.201918/66 H48.HSKFS0023EN
PORTAL PremiDoor 88
Assembly of basic hardware
HS
6.5.3 Fixing gear
Abb. 2: Fixing gear
Connect to bogie wheels
1
2
Cut to length
Screw on
GL Gear length
FH Sash height
S3 Countersunk tapping screw B
4.8 x 70
Gear length
for guiding rail SIEGENIA
with running rail 6.5/13 GL = FH – 123
with running rail 6.5/5 GL = FH – 115
3
S3
GL

H48.HSKFS0023EN 12.2019 19/66
PremiDoor 88
Assembly of basic hardware PORTAL
HS
6.6 Installaon of locking parts and buffer
Abb. 3: Posioning the locking parts
Posion on frame
Gear size A B1) C1)
170 1000 600 -
220 1600 1200 750
260 1900 1200 750
Posion on secondary sash
Gear size A B1) C1)
170 996 596 -
220 1596 1196 746
260 1896 1196 756
1) For burglar resistance RC2 top locking
parts. To do this, open the locking posions
provided on the gear.
Upper edge of running rail
250
200 200
2. Ø12
2. Ø12
1. Ø5
1. Ø5
C1)
B1)
A

12.201920/66 H48.HSKFS0023EN
PORTAL PremiDoor 88
Assembly of basic hardware
HS
6.7 Inserng the SOFT CLOSE sliding sash
Cut the guiding rail into two segments prior to inser-
ng the sliding sash. The length of the short segment
should amount to the sliding sash width (FBS) – 100.
Fix the short segment of the guiding rail in the frame.
Mounng posion on the locking side of the sliding
sash.
1. 2.
1. Place sliding sash on the running rail and lt into the
frame.
2. Push sliding sash into the locking posion.
Insert the second segment of the guiding rail between
the frame and sliding element and push through unl
the two segments touch each other.
Table of contents
Popular Intercom System manuals by other brands

Lippert Components
Lippert Components FASTEC owner's manual

Intratone
Intratone LABEL MODULE installation instructions

urmet domus
urmet domus 1150 quick start guide

Bpt
Bpt AS/200 installation instructions

Security Brands
Security Brands Ascent M1 quick start guide

FARFISA INTERCOMS
FARFISA INTERCOMS Exhito Series quick start guide