
Table of contents
SIPLUS HCS4300
6Operating Instructions, 11/2015, A5E35452705A/002
5.4 Installing the EM4315 expansion module .............................................................................. 40
5.5 Installing the I/O module (PM) ............................................................................................... 40
6 Connection ........................................................................................................................................... 43
6.1 Safety instructions and guidelines ......................................................................................... 43
6.2 Connecting the protective conductor ..................................................................................... 45
6.3 Connect PROFINET / PROFIBUS fieldbus ........................................................................... 46
6.4 Connecting the 24 V DC power supply.................................................................................. 47
6.5 Connecting the heating elements and three-phase line supply............................................. 48
6.5.1 Connecting the three-phase line supply ................................................................................ 48
6.5.2 Connecting heating elements ................................................................................................ 49
6.5.3 Block diagram ........................................................................................................................ 50
6.6 Connecting system interfaces................................................................................................ 51
6.7 Connecting I/O modules ........................................................................................................ 52
6.7.1 PM4000 DI/DO....................................................................................................................... 52
6.7.2 PM4000 U/I ............................................................................................................................ 54
6.7.3 PM4000 Temperature ............................................................................................................ 56
7 Commissioning ..................................................................................................................................... 59
7.1 Requirements......................................................................................................................... 59
7.2 Commissioning....................................................................................................................... 59
7.3 Insulation test ......................................................................................................................... 59
8 Planning/configuring ............................................................................................................................. 61
8.1 Integrating the HCS4300 into the PROFINET configuration ................................................. 61
8.2 Integrating the HCS4300 into the PROFIBUS configuration ................................................. 61
8.3 Device/hardware configuration in the TIA Portal ................................................................... 62
8.3.1 PROFINET device configuration............................................................................................ 62
8.3.2 PROFIBUS device configuration............................................................................................ 63
8.3.3 Configuration parameters ...................................................................................................... 64
8.3.3.1 CIM / POM configuration parameters .................................................................................... 64
8.3.3.2 Configuration parameters for I/O modules............................................................................. 65
8.4 Software tools for commissioning support ............................................................................. 67
8.4.1 Overview of tools for commissioning support ........................................................................ 67
9 Functions.............................................................................................................................................. 69
9.1 Status and actual displays ..................................................................................................... 69
9.2 Power output control .............................................................................................................. 70
9.2.1 Half-wave control ................................................................................................................... 70
9.2.2 Soft starting function .............................................................................................................. 71
9.2.3 Switch on heating................................................................................................................... 72
9.2.4 Channel control via setpoints................................................................................................. 72
9.2.5 Channel control via fields....................................................................................................... 73
9.2.6 Line voltage compensation .................................................................................................... 74
9.2.7 Behavior of the power outputs ............................................................................................... 74