
SECTION 1, Page 1
SJKB-40-D,SJKB-40-D/F JUN.1999
SECTION 1
INTRODUCTION
PURPOSE OF EQUIPMENT
TheSKYJACKSJKBBoomWorkPlatformsaredesigned
to transport and raise personnel and tools to overhead
workareas.
USE OF EQUIPMENT
Thework platforms(Figure1-2) arehighlymaneuverable
workstations. The SJKB-40-D/F and -40-D Modelsare
designedforbothslab-typeandroughterrainconstruction
applications.Liftingand elevateddriving thesemodels
MUST be on a flat, level, compacted surface.
WARNINGS
Theoperator MUSTreadandcompletely understandthe
frontpanel labels (Figures 1-1) andALL other warnings
in this manual and on the work platform. Compare the
labels on the work platform with the labels found
throughoutSections1 and 2 of thismanual. Ifanylabels
aredamaged or missing, replace themimmediately.
DESCRIPTION
The work platform consists of four major assemblies,
the platform, boom assembly, turret and drive chassis.
Anoperator’scontrol console is locatedontheplatform.
A foot switch on the platform enables and disables the
platformcontrols. Auxiliarybase controls are locatedin
the electric panel located on the rotating turret.
PLATFORM - The platform is constructed of a skid-
resistant see-thru deck surface and a 42" high tubular
steelrailingsystemwithmidrailsand6"toeboards. The
platform can be entered through a sliding midrail bar at
the center of the railing system or optional hinged gate.
The platform can be rotated 90 degrees from center in
either direction. A110 VAC GFI outletis also located on
theplatform.
BOOMASSEMBLY -Theboomis mounted ontheturret
and consists of a 4 foot hydraulic boom jib, telescoping
boom assembly and riser arm. This mechanism uses
double-actinghydraulic cylinders with holdingvalves to
control vertical movement. Manual lowering valves at
the base of the main boom and jib cylinders allow the
mechanism to lower in the event of an emergency or
electrical system failure.
TURRET -Theturret rotates360 degrees continuously.
On each side of the turret is an enclosure. One with
hinged doors that contains the swing out engine tray,
emergencypump,brakemanifoldandaccesstotheturret
transportation lock and battery. The other enclosure
contains the fuel tank, the hydraulic fluid tank and the
electricalpanel.
DRIVE CHASSIS - The chassis assembly consists of a
rigid one piece weldment and one of the following axle
configurations.
Standard 2WD machines have a straight front axle with
two non-driven wheels, steerable by a double acting
hydrauliccylinder andanhydraulic motordrivenrearaxle
withspringappliedhydraulicallyreleasedparkingbrakes.
Optional 4WD machineshave a hydraulic motor driven,
rigiddrive axleintherear.Thesteer axleiscoupledtothe
rear with a drive shaft. The driven steer axle has an
integrated double acting hydraulic cylinder for steering.
Both axles have spring applied hydraulically released
parking brakes. Machines equipped with the Dual Fuel
Optionhave LPtankmounting bracketsonthe sideofthe
chassis weldment.
PLATFORM CONTROL CONSOLE - Located on the
platform, this control station contains controls for work
platformmotionand emergency stopping. Also controls
forengineoperationandemergencypumpoperation.
OPTIONAL ACCESSORIES - The SKYJACK SJKB
Boom Work Platforms are designed to accept a variety
ofoptional accessories. ThesearelistedinSpecifications
andFeatures foundinthis section.Operatinginstructions
for these options (if required) can be found in Section 2
of this manual.
1
DEC.1999
SECTION 2, Page 8 SJKB-40-D,SJKB-40-D/F
JUN.1999
WARNING
DO NOT operate any control on the operator’s control
consolewithout yoursafetydevisefastened andproperly
securingthesafetylanyardto the platform lanyard rings.
Failure to avoid this hazard could result in death or
serious injury!
5. Attach the safety lanyards of each occupant to
theplatform lanyard rings.
6. Pull out the Emergency Stop Button.
7. ForgasenginemachinesequippedwiththeDual
Fuel Option. Select the desired fuel source.
8. When the engine is cold, press and hold the
Engine Choke Toggle Switch to the “ ð“
(right) position while starting engine. Release
switch once the engine starts (Kubota gas
engines) or press and hold Glow Plug Toggle
Switch to the “ ð“ (right) position for 15 to 20
seconds,thenrelease (Diesel engines).
9. TurnEngineStop/Run/StartSelect Switchtothe
“ ” (start) position until engine starts, then
release. DO NOT over crank the starter. (If
engine fails to start after multiple attempts,
consult the TROUBLE SHOOTING section in
theOperationalMaintenanceandPartsManual).
NOTE Engine will not start if foot switch is
depressed.
10. Select desired engine RPM using the Engine
Speed Select Switch.
REMEMBER
The following controls on the Operator’s Control
ConsoleWILLNOToperateunlesstheFootSwitchis
depressedandheld.
NOTE
When the operator is positioned over an axle, the
directionthe operator isfacing will beFORWARD!
11. TODRIVEFORWARD: Slowlymovethe Drive/
Steer Controller handle to the “ ñ“ (forward)
position. Releasecontroller handle to stop.
12. TO DRIVE IN REVERSE: Slowly move the
Drive/Steer Controller handle to the “ ò“
(reverse)position. Releasecontrollerhandleto
stop.
13. TO STEER: Depress the rocker on the Drive/
SteerControllerhandle in the directionyouwish
to steer.
14. TOADJUST BOOM FUNCTION SPEED:Turn
theBoomSpeedControlKnobcounter-clockwise
to decrease function speed or clockwise to
increasefuntionspeed.TheBoomSpeedControl
willaffectall lifting, loweringandrotatefunctions
but will not affect drive or steer speed.
15. TO MOVE THE JIB UPWARD: Press and hold
the Jib Up/Down Toggle Switch to the “ ñ“
(up) position. Release the switch to stop.
16. TO MOVE THE JIB DOWNWARD: Press and
holdtheJibUp/DownToggle Switch to the “ò“
(down) position. Release the switch to stop.
17. TO MOVE THE RISER UPWARD: Press and
hold the Riser Up/Down Toggle Switch to the
“ ñ“ (up) position. Release the switch to
stop.
18. TO MOVETHERISERDOWNWARD: Pressand
hold the Riser Up/Down Toggle Switch to the
“ ò“ (down) position. Release the switch to
stop.
19. TO MOVE THE BOOM UPWARD: Press and
hold the Boom Up/Down Toggle Switch to the
“ ñ“ (up) position. Release the switch to
stop.
20. TOMOVETHEBOOMDOWNWARD:Pressand
hold the Boom Up/Down Toggle Switch to the
“ ò“ (down) position. Release the switch to
stop.
21. TOROTATETHETURRETLEFT:Pressandhold
the Turret Rotate Toggle Switch to the
“ ï“ (left) position. Release the switch to
stop.
22. TO ROTATE THE TURRET RIGHT: Press and
hold the Turret Rotate Toggle Switch to the
“ ð“ (right) position. Release the switch to
stop.
23. TO LEVEL THEPLATFORM (Platformis tilted
awayfromthe jib):Pressand holdthePlatform
Leveling Toggle Switch to the
“ ñ“ (up) position.To stop release the switch.
24. TO LEVEL THEPLATFORM (Platformis tilted
toward the jib): Press and hold the Platform
Leveling Toggle Switch to the “ ò“ (down)
position.To stop release the switch.