socomec SUNSYS PCS2 IM UL Series User manual

SUNSYS PCS2 IM UL
Power Conversion System and Storage
with Islanding Mode
from 33 to 200 kVA
EN
INSTALLATION
AND OPERATING
MANUAL
www.socomec.com


3EN
SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
CONTENTS
1. SAFETY STANDARDS 6
1.1 DESCRIPTION OF SYMBOLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.2 ABBREVIATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2. FOREWORD 10
3. SUNSYS PCS² RANGES 12
3.1 IEC VERSIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
3.2 UL VERSIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
4. ENVIRONMENTAL REQUIREMENTS AND HANDLING 13
4.1 ENVIRONMENTAL REQUIREMENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
4.2 HANDLING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
4.3 FLOOR ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
4.4 INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4.4.1 PROCEDURE FOR PCS2IM 33 - 66 - 100 TR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4.4.2 PROCEDURE FOR PCS2IM 132 - 200 TL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
5. ELECTRICAL INSTALLATION 32
5.1 ELECTRICAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
6. OVERVIEW 34
6.1 SWITCHES AND INTERFACES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
6.2 DIAGRAM OF MAIN SYSTEM EXAMPLE FOR VERSION 100 TR . . . . . . . . . . . . . . . . 42
7. CONNECTIONS 43
7.1 INPUT CONNECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
7.2 INSTRUCTIONS FOR SUNSYS PCS2IM 200 TL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
8. CONTROL PANEL 51
8.1 EXCEPTION FOR PCS2IM 132 - 200 TL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
8.2 CONVERTER STATE MACHINE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
9. FIRST START-UP 54
10. MENU 57
10.1 DISPLAY OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
10.2 MENU TREE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
10.3 MENU DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
10.4 DEFAULT SETTINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
10.4.1 INTERCONNECTION SYSTEM RESPONSE TO ABNORMAL VOLTAGES . . . . . . . 64
10.4.2 INTERCONNECTION SYSTEM RESPONSE TO ABNORMAL FREQUENCIES . . . 64
10.4.3 INTERCONNECTION SYSTEM RESPONSE TO ABNORMAL VOLTAGES . . . . . . . 64
10.4.4 INTERCONNECTION SYSTEM RESPONSE TO ABNORMAL FREQUENCIES . . . 64
10.4.5 INTERCONNECTION SYSTEM RESPONSE TO ABNORMAL VOLTAGES . . . . . . . 65
10.4.6 INTERCONNECTION SYSTEM RESPONSE TO ABNORMAL FREQUENCIES . . . 65
11. OPERATING PROCEDURES 66
11.1 SWITCHING ON . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
11.2 SWITCHING OFF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
12. STANDARD FEATURES AND OPTIONS 68
12.1 SERIAL COMMUNICATION INTERFACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
12.2 MODBUS TCP INTERFACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70
12.3 ADC CARD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
12.4 SERIAL COMMUNICATION INTERFACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
12.5 SIGNAL CABLES ROUTE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
13. WARNINGS AND TROUBLESHOOTING 74
14. PREVENTIVE MAINTENANCE 77
14.1 BATTERIES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
14.2 FANS & CAPACITORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
15. UL1741SA: HOW TO CONFIGURE GRID SUPPORT FUNCTIONS 78
15.1 INTRODUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
15.2 TRIP THRESHOLDS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
15.3 RIDE THROUGH MODE & TIMINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
15.4 RAMPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
15.5 ACTIVE/REACTIVE POWER CONTROL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
16. SAFEGUARDING THE ENVIRONMENT 86
17. TECHNICAL SPECIFICATIONS 87


5EN
SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
SOCOMEC retains the full and exclusive ownership rights to this document. Only a personal entitlement to use the
document for the application indicated by SOCOMEC is granted to the recipient of this document. The reproduction,
modification, distribution of this document, either partially or wholly and in any manner, is strictly prohibited except
upon Socomec’s express prior written consent.
This document is not a specification. SOCOMEC reserves the right to make any changes to the information provided
without prior notice.

6EN SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
1. SAFETY STANDARDS
This user manual specifies installation and maintenance procedures, technical data and safety instructions for
SOCOMEC products. For further information visit the Socomec website: www.socomec.com.
The input and output circuits are isolated from the enclosure; the system grounding, when
required by Sections 690.41, 690.42, and 690.43 of the National Electric Code, ANSI/NFPA 70, is
the responsibility of the installer.
The wiring methods in accordance with the National Electrical Code, ANSI/NFPA 70 and
Canadian Electric Code (CEC) are to be used.
All national standards applicable to batteries must be observed.
CAUTION!
To reduce the risk of fire, connect only to a circuit provided with 170 amperes maximum branch-
circuit overcurrent protection in accordance with the National Electrical Code, ANSI/NFPA 70.
This inverter complies with Part 15 of the FCC Rules Operation so it must be able to handle any
interference and it must accept any interference received, including interference that may cause
undesired operation.
Overcurrent protection for the AC circuit is to be provided by others.
Before carrying out any operations read the interconnection manual and Battery Energy System
(BES) safety instructions carefully, in order to work under safe conditions.
If the Battery Energy System (BES) is not supplied by SOCOMEC, overcurrent protection for the
BES is to be provided by others.
NOTE!
Any work carried out on the equipment must be performed by skilled, qualified technicians.
NOTE!
Before carrying out any operations on the unit read the installation and operating manual care-
fully.
Keep this manual safe for future reference.
DANGER!
Failure to observe safety standards could result in fatal accidents or serious injury, and damage
equipment or the environment.
CAUTION!
If the unit is found to be damaged externally or internally, or any of the accessories are damaged
or missing, contact SOCOMEC.
Do not operate the unit if it has suffered a violent mechanical shock of any kind.
NOTE!
Install the unit in accordance with clearances in order to prevent access to handling devices and
guarantee sufficient ventilation (see Environmental requirements chapter).
NOTE!
Only use accessories recommended or sold by the manufacturer.
NOTE!
When the equipment is transferred from a cold to a warm place wait approx. two hours before
operating the unit.
DANGER! Live device! RISK OF ELECTRIC SHOCK!
SUNSYS PCS2IM is connected to two separately protected power supplies:
1) DC cable - BES power supply
2) AC cable - Power from the mains network, supplied by the electricity company
NOTE!
Before cleaning, performing maintenance work or connecting appliances to the unit, switch the
unit off and disconnect all power sources.

7EN
SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
DANGER! Live device! RISK OF ELECTRIC SHOCK!
Carry out the following steps before SUNSYS PCS2IM maintenance:
- Disconnect the battery system’s main DC switch.
- Disconnect the AC power supplies.
- Disconnect the DC disconnection switches.
- Make sure the cable is fixed in position securely.
- Make sure the system cannot be restarted.
- Make sure the electricity supply (AC and DC voltages) has been disconnected.
- Cover or separate nearby live device units.
DANGER! RISK OF ELECTRIC SHOCK!
After disconnecting all power sources wait approx. 5 minutes for the complete discharge of the
unit.
CAUTION! RISK OF BURNS!
During operation the casing can reach high temperatures. Do not touch the surfaces!
NOTE!
Use AWG, 90 °C copper wire.
NOTE!
The tightening torque for DC and AC terminals must be 180 lb-in (20.3 Nm).
NOTE!
Any use other than the specified purpose will be considered improper. The manufacturer/supplier
shall not be held responsible for damage resulting from this. Risk and responsibility lies with the
system manager.

8EN SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
1.1 DESCRIPTION OF SYMBOLS
Comply with all internal and external precautions and warnings on labels and plates on the equipment.
Symbols Description
UL 1741; CSA-C22.2 NO.107.1-01; MET file E113907
General warning – Important safety information
The circuit-breaker is ON
The circuit-breaker is OFF
5 min
Waiting time before operating
Protective earth terminal (PE).
Authorised personnel only.
No smoking.
Risk of electric shock!
Risk of explosion! Avoid short circuits!
Read the user instructions carefully.
Read the user manual before performing any operations.
Wear protective gloves
Wear safety shoes.
Wear protective goggles.
In the event of contact with the eyes, wash immediately with plenty of water and call a doctor.
Call a doctor immediately in the event of accidents or illness.
Do not dispose of in normal waste stream (symbol waste electrical and electronic equipment).

9EN
SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
1.2 ABBREVIATIONS
For the purpose of this document, the following abbreviations are used:
BES Battery Energy Storage
BMS Battery Management System
EMC Electro Magnetic Compatibility
EMS Energy Management System
ESS Energy Storage System
HMI Human Machine Interface
IEC International Electrotechnical Commission
IM Islanding Mode
IMD Insulation Monitoring Device
PCS Power Conversion System
PE Protective Earth
PMS Power Management System
PV Photovoltaic
SBMS System BMS
SOC State of Charge
SOH State of Health
SPD Surge Protection Device
THDI Total Harmonic Distortion in Current
THDV Total Harmonic Distortion in Voltage
TL Transformer-less
TR Transformer based

10 EN SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
2. FOREWORD
Energy storage is the key solution to meeting the challenges of energy transition, using renewable energy and provid-
ing energy cost reductions for the following 4 main applications.
• Behind-the-Meter Energy Storage:
Reduce peak consumption and maximise PV energy self-consumption. SUNSYS PCS² (IM) can limit the impact
of increases in the electricity retail price by supplying the load to cut peak demand (peak shaving), maximising PV
energy self-consumption at building or community level. Any PV energy surplus is stored in the SUNSYS PCS² (IM)
battery system. This stored energy is used later to supply the load.
1
• PV plants:
Manage the intermittence of renewable energy production. SUNSYS PCS2(IM) ensures the production profile of an
intermittent renewable energy plant by limiting production to a predefined value, injecting energy to compensate for
solar variations, setting constant ramp-up or ramp-down.
2

11EN
SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
• Grid support:
Meet the challenge of demand-response energy balance. When directly connected to the grid, SUNSYS PCS2(IM)
improves stability and management of grid operators thanks to voltage and frequency regulation, load shifting, peak
shaving and ancillary services for grid support.
3
• Microgrids:
Ensure energy availability and quality. The SUNSYS PCS² IM enables the microgrid to disconnect from the main grid
and be electrically autonomous thanks to local generation (PV, Wind, Diesel generators, etc.).
4
To sum up:
Products / Applications On-Grid On-Grid + Off-Grid Pure Off-Grid
SUNSYS PCS² •
SUNSYS PCS² IM • •

12 EN SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
3. SUNSYS PCS² RANGES
3.1 IEC VERSIONS
SUNSYS PCS² SUNSYS PCS² IM
33 kVA 66 kVA 100 kVA 132 kVA 200 kVA 33 kVA 66 kVA 100 kVA 132 kVA 200 kVA
Internal
transformer
(TR version)
External
transformer
(TL version)
3.2 UL VERSIONS
SUNSYS PCS² SUNSYS PCS² IM
33 kVA 66 kVA 100 kVA 132 kVA 200 kVA 33 kVA 66 kVA 100 kVA 132 kVA 200 kVA
Internal
transformer
(TR version)
External
transformer
(TL version)

13EN
SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
4. ENVIRONMENTAL REQUIREMENTS AND HANDLING
4.1 ENVIRONMENTAL REQUIREMENTS
Install the unit in an equipment room.
The room must be:
• of a suitable size;
• free from conductive, inflammable and corrosive items;
• not exposed directly to sunlight.
The floor must support the weight of the unit and guarantee its stability. The unit is designed for indoor rooms only.
For information regarding ambient temperature, dimensions and weights refer to 'Technical specifications' chapter.
To position the unit correctly see the diagrams below.
ROOM POSITIONING
Top view
Free area
SUNSYS
PCS2
SUNSYS
PCS2
SUNSYS
PCS2
30 cm1.5 m
SPACING-AIR FREE
To ensure the full unit power up to 40°C ambient temperature, observe the following minimum distances:
- rear space: 30 cm.
- above space: 45 cm.
This distance can be reduced depending on:
• the maximum ambient temperature accepted (Full load conditions).
Distance from the rear wall Space above the top panel Ambient temperature
30 cm 45 cm 40 °C
25 cm 35 °C
20 cm 45 cm 35 °C
25 cm 30 °C
10 cm 45 cm 25 °C
25 cm

14 EN SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
• the maximum power required from the load (at 40 °C ambient temperature).
Distance from the rear wall Space above the top panel Power
30 cm 45 cm 100%
25 cm 90%
20 cm 45 cm 90%
25 cm 80%
10 cm 45 cm 75%
25 cm 75%
SPACING-AIR FLOW
Typical air extraction structure
SUNSYS
PCS2
hood
air
air extractor
external
environment
internal
environment
≥10 cm
Minimum air extractor flow(1)
Models Minimum extraction flow
33 TR 600 m3/h
66 TR 1200 m3/h
100 TR 1800 m3/h
132 TL 1780 m3/h
200 TL 2700 m3/h
1. SUNSYS PCS2at a distance of 10 cm from the rear wall (40 °C ambient temperature and full load).
NOTE: the hood must prevent air losses and enable the removal of the SUNSYS PCS2’s top panel
for maintenance.

15EN
SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
CABINET LAYOUT
SUNSYS PCS2IM
33 - 66 TR
SUNSYS PCS2IM
100 TR
SUNSYS PCS2IM
132 - 200 TL
4.2 HANDLING
• The packaging guarantees the stability of the unit during shipping and physical transfer.
• The unit must remain in a vertical position during all shipping and handling operations.
• Ensure that the floor is strong enough to support the weight of the unit.
• Carry the packaged unit as close as possible to the installation site.
WARNING! HEAVY WEIGHT!
Move the unit using a fork lift truck taking the utmost caution at all times.
The unit MUST be handled by at least two people. The people MUST take position at the sides of
the PCS with respect to the direction of movement.
Do not move the unit by putting pressure on the front door.
When moving the unit on even slightly sloping surfaces, use the locking equipment and braking
devices to ensure that the unit does not fall over.
WARNING!
The following instructions must be carried out prior to moving the unit (after initial positioning).
Failure to heed this warning could result in the unit falling over, equipment damage, injury and
even death.

16 EN SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
4.3 FLOOR ASSEMBLY
• PCS2IM range 33 - 66 - 100 TR:
Remove the protective cover
30 cm
SUNSYS PCS2
Rear
• PCS2IM 132 - 200 TL:
Level adjustment and floor fixing
Level regulation bolt
Fixing bolt
618 mm
720 mm

17EN
SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
4.4 INSTALLATION
POWER MODULE INSERTION
WARNING: before installing the module ensure that there is no voltage.
NOTE: the module must be handled by at least two people (34.5 kg / 76 lb).
WARNING! RISK OF TIPPING OVER: before carrying out any operations, ensure the SUNSYS
PCS2IM is secured at the feet.
WARNING! RISK OF TIPPING OVER: the modules must be inserted from the bottom upwards
and removed from the top downwards to ensure the unit remains stable.
WARNING: the modules have to be moved individually. Never handle more than one module.
4.4.1 PROCEDURE FOR PCS2IM 33 - 66 - 100 TR
• Open the door with the appropriate key.

18 EN SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
• Position the cables in the hose clamp to enable correct module insertion.
• Remove the Lexan protection on the connectors.

19EN
SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
• Place the module on the guides and insert it up to the limit starting by the lower one.
In order to ensure the safety of installers, installers shall be at least two people to process the
installation (34.5 kg / 76 lb).
76
lb
34.5
kg
• Insert the connectors and secure them.

20 EN SUNSYS PCS2 IM UL Power Conversion System and Storage with Islanding Mode from 33 to 200 kVA - Ref.: IOMSUNPCXX07-EN 01
• Position the Lexan protection and secure it.
• Insert the module completely.
• Tighten the screws to secure the module to the SUNSYS PCS2IM.
This manual suits for next models
10
Table of contents
Other socomec Power Supply manuals
Popular Power Supply manuals by other brands

Cooper
Cooper Greengate DLVP quick start guide

MGE UPS Systems
MGE UPS Systems Galaxy PW user manual

Matsusada Precision
Matsusada Precision EQ Series instruction manual

Fracarro
Fracarro AMP2000 operating instructions

Manhattan
Manhattan 168205 user manual

Zennio
Zennio ALLinBOX 1612 v2 Technical documentation