
0118583R7 Page 3 of 4
Figure 4
Upright
assembly
1/4-20 x 15mm JC
bolts (4 required)
End cap
Figure 5
Upright opening
for routing cables
VESA mount
1. Attach the (2) upright brackets to the upright assembly as shown
using 1/4-20 x 15mm JC bolts (2 per). Tighten securely.
Note: Multiple mounting holes / height positions are available on
the upright assembly). Figure 3.
1. Refer to the instructions included with the VESA mount for complete
display installation procedure. (The hanging rails get installed to the
back of the display.)
2. Route cables through the upright opening.
3. Install end cap on top of upright.
WARNING
The display should always be removed
from the stand before moving the unit.
Hanging rail
5
3
Figure 3
1. Attach the VESA mount to the (2) upright brackets
using (12) 1/4-20 x 15mm JC bolts. Figure 4.
2. Tighten all bolts securely
4
1/4-20 x 15mm
JC bolts
(12 required)
Upright bracket
Upright bracket
VESA mount
Hanging rail
Worksurface
Refer to the instructions in-
cluded with the display mount
for complete VESA / display
installation procedure.
Refer to the instructions in-
cluded with the display mount
for complete VESA / display
installation procedure.
• The assembled display stand accommodates most
43”-90” displays.
• Be sure display does not exceed the weight capacity
of 125 lb.
• If installing the display stand onto a Spectrum
Console Gaming Hub, be sure the top of the installed
monitor will not exceed a 66” height from the oor.
• If installing the display stand onto a Spectrum
Console Gaming Hub, be sure the top of the installed
monitor will not exceed a 66” height from the oor.