
-7 -
SXJS3018 DOUBLE-DECKSCISSORLIFT
3.7Add oil and adjustment
Press UPbuttontoliftuptheplatforms.Iftwoplatformsarenoton thesame
level,adjustthebalancingvalvestolevelthetwoplatforms.Thestepsareas
below: (refertoFig.5)
If themainplatform(withthickercylinder),open valve8(Howmuchshouldbe
opendependingonhowmuchheightdifferencebetweentwoplatforms.)
Press UPbutton till the twoplatformsleveled.Closevalve8immediately. Ifthe
sub-platform(withthinnercylinder) ishigher,openvalve8.Press DOWN
button till the twoplatformsleveled.Closevalve8immediately.Ifnecessary,
repeatthestepsabovetill the twoplatformsleveled.
Attention!Implementation oftheleveling operation isprohibitedon the
busstate! Balancingvalvesarenot free toopen toavoiddanger.
3.8.Installation and horizontal adjustment
Lift the platformsup aboutonemeter.PressLOCKbutton.Keepthe leftand
rightmechanicallocksfall inthesamelock tooth.Adjustthespacearoundthe
liftswell(RefertoFig.2).Useabolttoborethe bolt Φ14 holesinthe ground.
Put intheboltsbutnotexpanded.
Usealevelingtooltomakesurethefront,back,left andrightoftheplatforms
areleveledmintolerance ≤3mm.Ifnotinthistolerancerange,pleasefill in
somewasherunderthefloorplate.Theclearancebetween the floorplateand
he groundmustbe filledwithsteelorcement.Then,expande thebolts.
3.9Loadtest
Check alltheoil andair pipestomakesurenooil orair leaking.Checkthe
boltstomakesuretheyaretight. Ifeverythingisnormaland ingoodcondition,
thencanstart totest.
Firstly,proceed withno-loadtest, run2-3times,noabnormalnoiseand
leakage,and liftingtimeand liftingheightareinline withthetechnical
parameters,thenthetestisfinished.ThetestisOK ,togetreadyfornormal
use.
Chapter 4.HydraulicSystem
4.1Lifthydraulicsysteminstalledinthecontrolcabinet,structureand
composition refertoFig.5,hydraulicsystemrefertoFig.6.Adjustthe relief
valvecanchangethesystempressure,changetheliftingcapacity.(Relief