SureCall
|
48346
Milmont
Dirve,
Fremont
CA
94538
|
1-888-365-6283
|
[email protected] SureCall | 48346 Milmont Dirve, Fremont CA 94538 | 1-888-365-6283 | [email protected] 1918Each bank of DIP switches contain ve switches.
• Turning a switch OFF increases booster gain for the selected channel.
• Turning that switch ON decreases booster gain for the selected channel.
From left to right, the DIP switches in each bank provide 1, 2, 4, 8, and 16 dB of attenuation
(reduced amplication). These switches are cumulative, meaning that the total amount of
attenuation for a channel is equal to the combined dB of all ON DIP switches in the corresponding
bank. For example:
• Turning all switches OFF = 0dB attenuation
(booster is at full gain).
• Turning ON Switch #1 in a bank = 1dB
attenuation (booster maximum gain is
reduced by 1dB).
• Turning ON Switches #1, 3, and 5 in a bank = 1+4+16dB attenuation = 21dB attenuation.
For example, in an 80dB booster, this means the selected channel would be reduced to 59dB (80db -21db).
• Turning ON all switches in a bank = 1+2+4+8+16dB attenuation = 31dB attenuation
For example, in an 80 dB booster, that means that the selected channel would be reduced
to 49dB (80dB-31dB).
When the booster is powered on:
• The green Power light (5) should illuminate.
• If any of the bands are oscillating, the corresponding Band lights (6, 7, 8 , 9, 10) will ash red and that
band will ash red and that band will shut down.
Note: When the booster is turned on, the Band lights will ash red and yellow for approximately 10
seconds.
Conguration and Testing
5.2 - Initial Conguration
By default, your booster ships with all DIP switches turned OFF to provide maximum gain in
all channels. This should always be your starting point whenever installing or reinstalling the
booster.
5.3 - Powering on the Booster
To power on the booster:
1. Make sure that exterior and interior antenna cables are rmly connected to the proper ports
on the booster.
2. Plug a surge suppressor into a grounded 110VAC wall outlet.
3. Plug the AC end of the power adapter that came with the booster into the surge suppressor.
4. Plug the DC end of the power adapter into the Power port on the booster.5. Verify that the
green Power light is illuminated.
5.4 – Testing
Once the booster is powered on and no Warning lights are illuminated, walk around the entire
area to test the voice and/or data signal. Rene the antenna locations and/or gain levels as
needed, and then complete the permanent installation once the system is working as desired.
5.5 - Adjusting the Booster
Keep the following points in mind when adjusting the booster:
• Full power is not always your best option. Your goal is to obtain a usable cellular signal in as
many areas of the building as possible. A successful installation means that you can make calls
without dropping and/or have a reliable data connection.
5. Verify that the green Power light is illuminated.
CAUTION: ONLY USE THE POWER SUPPLY INCLUDED
WITH THE BOOSTER. USE OF ANOTHER POWER
SUPPLY COULD DAMAGE THE BOOSTER AND/OR
POWER SUPPLY.
CAUTION: DO NOT PROCEED BEYOND THIS POINT
UNTIL THE BOOSTER IS POWERED ON AND NO RED
WARNING LIGHTS ARE ILLUMINATED.
Conguration and Testing
123 4 5
124 8 16
UPLINK
123 4 5
124 8 16
DOWNLINK