
1001 East Highway 212 • Hector, MN USA 55342 • suttlesolutions.com
Toll Free: 1 (800) 852-8662 • Local: (320) 848-6711 • Fax: (320) 848-6218
Specifications subject to change without notice. Copyright 2014. 1120514
FutureLinkTM Tool-less VDSL NID Splitter
The cradle comes attached to the splitter in shipping.
First, make sure the network leads out of the splitter are facing the
TELCO side of the NID.
Second, tilt the attached splitter and cradle down towards the right
side of the NID slot and rock the left side down into position.
The cradle comes attached to the splitter in shipping.
First, detach the cradle from the splitter by pulling back on the
cradle arm from the splitter.
Second, tilt the splitter down to the right so that the tab beneath
the splitter slides under the knob fixed on the NID.
Lastly, push the left side of the splitter down while snapping the
NID arm tab into a latching position with the splitter.
■ Remove cradle from module.
■ The cradle may be attached to a premise backboard with two
flathead screws. Attach the cradle close to the 66 block so that
the 12” tail from the module can reach.
■ Snap the module into the cradle and attach the network leads
to the connector block for the Telco feed.
■ Data and voice jumpers can be run from the module to the
proper distribution connections.
To view a demonstration video, visit the Suttle website
(www.suttleonline.com) and select the video area under the
support tab.
If you need additional training please call Customer Service at
1-800-852-8662.
Premise Application
Mounting Instructions (with cradle)
Mounting Instructions (without cradle)
■ Install 649NV module, terminate all network and premise
connections.
■ Use a test set with a 6 position, 4 conductor RJ plug.
■ Open cover, disconnecting network input, and insert test set
into the “TEST” jack.
■ Test the line for shorts or opens using L1 (center pair of RJ
contacts).
■ Test the bridged POTS drops (up to 3 premise connections)
for shorts using L2 (outer pair of RJ contacts).
■ To test for open circuits in the bridged POTS drops; close
the 649NV module cover completely, plug test set into user
interface jacks in the premise.
■ To test for shorts or opens on the data port; close the 649NV
module cover completely, plug test set into use interface jack
in the premise.
Testing Procedure
Application Diagrams