Talmir TENMA User manual

TM
Soldering & Rework Station
Features:
• Closed loop control of sensor, accurate and stable temperature, which can
safely desolder the temperature-sensitive components, such as QFP, PLCC,
SOP, BGA and so on Intelligent cooling system, Delay blast after operation,
automatic power off when air temperature is less than 100°C
• Original imported heating element, rapid warming, and long life, and good
wielding safety performance, constant and adjustable temperature
• Original imported air pump, low vibration, noise design, which can make the
workplace quiet
• Anti-Static design to avoid bringing damage to PCB board due to static and
creepage
Apply:
R and D
production
lab of scientic research
Specications:
Input voltage : 110V / 220V AC optional
Maximum power consumption : 550W
Air pump : Diaphragm
Volume : 23L / min (max)
Temperature : 100°C to 480°C
Dimension : 224mm (L) × 126mm (W) × 110mm (H)mm
Before Operation:
1.
Select the Nozzle that matches the size of the IC attach the Nozzle when both the pipe and the Nozzle are cool. Should
either be warm, check to make sure that the temperature control knobs set to1
2. Loosen the screw on the Nozzle
3.
Attach the Nozzle. Do not force the nozzle or pull on the edge of the Nozzle by pliers. Also, do not re-tighten the screw
too tightly
Operating Instructions:
1.
Plug the power cord into the power supply. After connection, the automatic blowing function will start sending air
through the pipe, but the heating element remains cool
2.
Turn the Power switch on. The power switch may be turned on at any time while the automatic blowing function is
operating. Once the power switch is turned on, the heating element will begin to warm up
3.
Adjust the air ow and temperature control knobs. After adjusting the air ow and temperature control knob, wait for
the temperature to stabilize for a short period of time
4.
Melt the solder. Hold the iron so that the Nozzle is located directly over, but not touching the IC and allow the hot air to
melt the solder. Be careful not to touch the leads of the IC with the Nozzle
5. Remove the IC. Once the solder has melted, remove the IC by lifting the plier
6.
Turn the power switch off. After the power switch is turned off, an automatic blowing function begins sending cool air
through the pipe in order to cool both the heating element and the handle. So do not disconnect the plug during this
cooling process. In case you don’t use the unit for a ling time, disconnect the plug
7. Remove any remaining solder. After removing the IC, remove remaining solder with a wick or desoldering tool
Note: After turn off the power switch of about 1 minute later, power is automatically shut off.
:טירפ רואית
תנחת
םח ריווא
תילטיגיד
560W
:ןרצי
TENMA
:םגד21-10125
:רימלט ט"קמ
2362602
המחלה תונחת / המחלה תונחתו םימחלמ / המחלה דויצו םימחלמ :רתאב םוקימ
מ"עב הקינורטקלא רימלט :ןאובי

TM
Soldering & Rework Station
QFP Soldering:
1. Apply the solder paste. Apply the proper quantity of solder paste and install the SMD on the PCB
2. Preheat SMD. Refer to the photo to preheat SMD
3. Soldering heat the lead frame evenly
4. Washing when soldering is completed, wash away the ux
Note : While here is a merit to solder by Hot air, it’s also possible to cause the defects such as solder balls, older bridges.
We recommend you to examine the conditions of soldering sufciently.
Precautions:
1. Before attach the nozzle, make sure that both the heating tube and the nozzle are cool down
2. Caution high temperature operation do not use the unit near ignitable gases, paper, or other inammable materials.
Both the nozzle and the heated air are extremely hot and can cause painful burns. Never touch the heater pipe or allow
the heated air to blow against your skin. Initially, the iron may emit white smoke, but this will soon disappear
3. After use, be sure to cool the unit. After turning off the power switch, the unit will automatically blow cool air through
the pipe for a short period of time. Do not disconnect the plug during this cooling process
4. Never drop or sharply joint the unit. The pipe contains quartz glass, which can break if the unit is dropped or jolted
sharply
5. Disconnect the plug when you don’t use the unit for a long time. When the power cord is connected into the power
supply, the unit has a little ow of electricity, even the power switch is in off position. So when you don’t use the unit for
a long time, disconnect the plug
Replacing the Heating Element:
1. Remove the screws, slide the tube. Remove the 3 screws, which secure the Handle and slide the cord tube
2. Open the handle. Disconnect the ground wire sleeve and remove the pipe. In the pipe. The quartz glass and heat
insulation is installed. Do not drop or miss it
3. Remove the heating element. Disconnect the terminal and remove the heating element
4. Insert a new heating element. Handle it with care. Never rub the heating element wire. Insert a new heating element
and reconnect the terminal. Reconnect the ground wire after replacing the element. Assemble the Handle in the
reverse order of disassembly. Insert the Handle’s projection into the hole in the pipe
:טירפ רואית
תנחת
םח ריווא
תילטיגיד
560W
:ןרצי
TENMA
:םגד21-10125
:רימלט ט"קמ
2362602
המחלה תונחת / המחלה תונחתו םימחלמ / המחלה דויצו םימחלמ :רתאב םוקימ
מ"עב הקינורטקלא רימלט :ןאובי
Table of contents