Taylor TAYLOR-GTW-2A User manual

2022-012-R-0017-A2_Draft 4 1
O T I M U S
S O R T E R S
Gateway
Installation manual
Taylor Technologies BV
Torenallee 32-14
5617 DB Eindhoven
The Netherlands
tel: +31 (0)85 107 1871
mail: support@taylor.solar
web: www.taylor.solar

2022-012-R-0017-A2_Draft 4 2
O T I M U S
S O R T E R S
Gateway
Table of contents
1 About this document...................................................................................2
1.1
Purpose of this document
................................................................................2
1.2 How to use this document................................................................................2
1.3
Language
...........................................................................................................2
1.4
Symbols and signal
words used in this document........................................2
2 Safety............................................................................................................3
2.1 General................................................................................................................3
2.2 Connect to the inverter......................................................................................3
3 Packaging.....................................................................................................4
4 Description...................................................................................................5
4.1 Overview of the system.....................................................................................5
4.2
Overview of the gateway
..................................................................................5
4.3 Data cables delivered seperate from gateway...............................................5
4.4
Status shown by the indicator
light in the power switch...............................6
4.5
Status shown by indicator lights 1 and 2
......................................................6
5 Installation....................................................................................................7
5.1 Preliminary equirements...................................................................................7
5.2
Install the gateway
............................................................................................8
6 Declaration of conformity..........................................................................11
7 Technical
specication..............................................................................11
7.1
Gateway
............................................................................................................14
7. 2
Smart module
...................................................................................................14
8Drill template...............................................................................................16
11

2022-012-R-0017-A2_Draft 4 3
O T I M U S
S O R T E R S
Gateway
1.1 Purpose of this document
This document is only applicable for the gateway. Refer to the technical
specications for the applicable part numbers.
From here on, this document refers to the gateway as the equipment.
The equipment is part of a solar power system, from here on in this
document referred to as the system.
The document is for approved personnel and gives the information that is
necessary to install the equipment.
1.2 How to use this document
1. Make sure that you know the structure and contents of this document.
2. Read the safety chapter and make sure that you know all the instructions.
3. Do the steps in the procedures fully and in the correct sequence.
4. Keep the document in a safe location that you can easily access.
This document is a part of the equipment.
1.3 Language
The original instructions of this document are in English (EN-US). All other
language versions are translations of the original instructions.
1.4 Symbols and signal words used in this document
Symbol Signal word Description
Warning Obey the instruction.
If not, this can cause injury.
Caution Obey the instruction.
If not, this can cause damage to the machine,
to equipment or to property.
Note A note gives more data, to make it easier to do the
steps, for example.
- Read the instructions.
1 About this document
2

2022-012-R-0017-A2_Draft 4 4
O T I M U S
S O R T E R S
Gateway
2.1 General
WARNING:
- Before you switch the inverter on or o, stop the gateway. Set the power
switch of the gateway in the o position (0).
- Incorrect installation can cause electric shock or can cause damage to
the equipment and property. Obey the local regulations and electrical
standards.The system must be installed and maintained by trained and
authorized personnel.
- The gateway is designed to apply within the Taylor system, do not use it for
any other purposes.
- Use the equipment only in combination with inverters that are approved by
Taylor.
- Before you install the equipment, read all instructions.
- When the photovoltaic array is exposed to light, it supplies a DC voltage.
- Read the documentation and safety instructions of the inverter.
- Do not disconnect the junction box under load.
- Do not install the equipment in areas that contain ammable materials or
gases.
- Install the equipment in a dry location.
- If the power cable has damage, switch o the gateway and remove the
power source before you touch the power cable.
- If the equipment has damage, disconnect the power cable. Replace the
equipment.
- Do not open the equipment.
- Do not make changes to the equipment.
- Recycle the equipment as electronic waste. Do not put the equipment in
unsorted municipal waste. Obey the local regulations.
2.2 Connect to the inverter
2 Safety
Caution:
- On the inverter, do not
connect more than one string
of solar panels to an MPPT
connection.
- Refer to the documentation
of the inverter.
3

2022-012-R-0017-A2_Draft 4 5
O T I M U S
S O R T E R S
Gateway
A B C
E D
3 Packaging
A. Gateway
B. Installation manual
C. Power cable
D. Fastening materials
E Drill template
4

2022-012-R-0017-A2_Draft 4 6
O T I M U S
S O R T E R S
Gateway
4.1 Overview of the system
A. Gateway
B. Solar panel
C. String of solar panels
D. Inverter
4.2 Overview of the gateway
A. Inverter data connection
B. Power connection
C. Power adapter
D. LAN connection
E. Indicator light 1
F. Indicator light 2
G. PV cable feed-through hole
H. Cable clamp
I. Power switch with indicator light
J. Identication plate
K. Datacable
L. Cap
H
C
IJ G
BFE A
KD
L
2
4.3 Data cables delivered seperate from gateway
Data cable Part number (P/N) To use with this inverter
A. TAYLOR-GTW-C-00 Goodwe
B. TAYLOR-GTW-C-SL Solis
4 Description
A
B
D
C
5

2022-012-R-0017-A2_Draft 4 7
O T I M U S
S O R T E R S
Gateway
4.4 Status shown by the indicator light in the power switch
Indicator light in the
power switch
Status of
the gateway
Remarks
On On The system produces energy. The cable
from the solar string is energized.
O O When the gateway is o, the system is
in safety mode. The cable from the solar
string has approximately 1 Volt per
solar panel.
Warning: To make sure that the
system is in safety mode, disconnect
the power adapter of the gateway.
4.5 Status shown by indicator lights 1 and 2
Indicator light 1 Indicator light 2 Equipment status
Flashes 7 times O There is a connection with the 4G network.
On O The gateway updates the software
Flashes O The gateway does a factory reset.
6

2022-012-R-0017-A2_Draft 4 8
O T I M U S
S O R T E R S
Gateway
2. The solar panels (A) are installed and
the smart modules (B) are connected.
3. The inverter is installed.
Warning:
- Obey the instructions that come with the
solarpannels, the smart modules and the
inverter.
- When the photovoltaic array is exposed
to light, it supplies a DC voltage.
- + - +
BA
2
5 Installation
2
Design rules
- Multiple orientations within one string are allowed
- Each orientation should reach the start-up voltage (input DC)
7
5.1 Preliminary requirements
1. Scan the barcode of each individual
solar panel. In the onboarding
application on your mobile device, On
the 'Scan' screen (A), select the 'Scan'
button (B).
4 3
2 1
9 10
XXXXXXXXX
B
A
1

2022-012-R-0017-A2_Draft 4 9
O T I M U S
S O R T E R S
Gateway
Warning:
- Obey the safety instructions of the
inverter.
- Make sure that the inverter is o and de-
energized.
- Do not connect more than one string of
solar panels to a MPPT connection.
- Do not connect parallel module strings
per MPPT tracker
1. Scan the gateway. Select the 'SCAN
GTW' button (A).
A
11 10 9
8 7
6 5 4
3 2 1
4
Note: If necessary, drill holes. Drill
safely. Do not drill or screw in electricity
lines, water pipes, and such items. Use
the correct type of wall plugs.
2. Install the fasteners. Use the drill
template on the last page of this
manual.
3. Attach the gateway to the fasteners (B).
B
5
5.2
Install the gateway
.
3
8

2022-012-R-0017-A2_Draft 4 10
O T I M U S
S O R T E R S
Gateway
Caution: Never put both cables
through the hole (B).
4. Put one of the cables (A) (either + or -)
through the hole (B).
5. Put the other cable through the clamp
(C)
6. Connect the cables to the inverter
(D). Refer to the documentation of the
inverter
D
4
7. Connect the data cable to the inverter
(B). Refer to the website:
www.taylor.solar > Downloads >
Manuals.
8. Connect the data cable to the data
connection (A).
B
A
5
AB
C
3
9

2022-012-R-0017-A2_Draft 4 11
O T I M U S
S O R T E R S
Gateway
9. Connect the power cable (A).
10. Put the power adapter (B) in a wall
socket.
Warning: - Make sure that the
solarpannels, the smart modules and
the inverter are installed correctly.
- Before you switch the inverter on or o,
stop the gateway. Set the power switch
of the gateway in the o position (0).
11. Start the inverter. On the inverter, set the
DC switch to on.
B
A
6
12. On the 'launch' screen (A), select the
'launch' button (B). When the system
onboarding is conrmed, the customer
receives an e-mail to register to the
Taylor dashboard.
B
A
10 XXXXXXXXXXXXXXXXXXXXXX
9XXXXXXXXXXXXXXXXXXXXXX
8XXXXXXXXXXXXXXXXXXXXXX
7XXXXXXXXXXXXXXXXXXXXXX
6XXXXXXXXXXXXXXXXXXXXXX
5XXXXXXXXXXXXXXXXXXXXXX
4XXXXXXXXXXXXXXXXXXXXXX
3XXXXXXXXXXXXXXXXXXXXXX
2XXXXXXXXXXXXXXXXXXXXXX
1
XXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXX
GTW
7
13. Set the switch (A) in the on position.
The light in the switch comes on.
Note:
- A few seconds may be necessary for
the system to start.
- If a 4G connection is not available,
use a wired LAN connection. If a wi
connection is necessary, please refer to
Taylor.
A
8
10

2022-012-R-0017-A2_Draft 4 12
O T I M U S
S O R T E R S
Gateway
6 Declaration of conformity
Hereby, Taylor Technologies B.V. declares that the radio equipment type
TAYLOR-GTW-2A is in compliance with Directive 2014/35/EU. The full text of
the EU declaration of conformity is available at this internet address:
www.taylor.solar/declaration.
7 Technicalspecications
7.1 Gateway
Item Specication Value
Gateway Input Part number
(P/N)
TAYLOR-GTW-2A
Voltage 12 VDC
Maximum
current
1.5 A
Maximum power 18 W
Environment IP code IP3X
environmental
category
indoor, unconditioned
maximum
altitude rating
2000 meter
Temperature Operating: (0 ~ 40)°C
Storage: (-20 ~ 85)°C
Humidity Operating: (8 ~ 90)% RH
Storage: (5 ~ 95)% RH non
condensing
Frequency
bands
Cat-M B1/B2/B3/B4/B5/B8/B12/B13/B14/
B18/B19/B20/B25/B26/B27/B28/
B66/B85
Cat-NB B1/B2/B3/B4/B5/B8/B12/B13/B18/
B19/B20/B25/B26/B28/B66/B71/B85
GSM 850/900/1800/1900 MHz
Radio
transmitted
power
LTE RF Power
Class
Class 5 (Typ. 21dbm)
11

2022-012-R-0017-A2_Draft 4 13
O T I M U S
S O R T E R S
Gateway
15
Power
adapter
Output Model SYS1308-2412-W2E
Min. Load 0 A
Max. load 2 A ±5%
OCP 3.5~5.5 A
OVP 14~16 V
Eciency >70%
Max. power 24 W
Ripple & N 120 mV
Overvoltage
category
II
input Voltage (90 ~ 264) VAC
Frequency (47 ~ 63) Hz
Current 1A @ 230VAC
Surge Current
max.
60Amax. @ at 240Vac input, with
rated load and 25° ambient
Leakage current <0.25 mA @ 240Vac input
protection Over load
OCP
Fold back
Over Voltage
OVP
Voltage limiting
Short Circuit Yes, Output to Ground, Auto recovery
when fault has been removed.
Short Current & Over Current can not
exceed 8A max. after 1minute at nomi-
nal line input.
Protection class II
No Load
Operation
Yes, to protect the power supply and
system from damage
others Dielectric
Strength
HI-POT B / I/P-O/P (FG): 3KVAC /
10mA / 1 minute
Set up time 7s max. @ AC low line Input &
Output full load
12

2022-012-R-0017-A2_Draft 4 14
O T I M U S
S O R T E R S
Gateway
Hold-up Time 10ms @ AC nominal Input and
Output full load
MTBF
Qualication
> 35K hours
DC cable &
connector
Standard length of the cable
1,8m & It depends on customer
requirements and upon
specications
Eciency
(Normal)
>77.6% min. @ 240VAC input & Full load
Power
Consumption
Max. 0.5W @ AC nominal Input and
Output min. load
Input Fuse 1A protected against power line
surges and any abnormal conditions
EMC EMI EN55022 Class B / FCC part 15
subpart B Class B / EN61000-3-
2(2000) / EN61000-3-3(1995) +
A1(20 01)
EMS IEC61000-4-2,5,8(2001) /
IEC61000-4-3(2002) / IEC61000-4-
6(2002)+A1(2003) /
IEC61000-4-4,11(2004)
EN55024(1998)+A1(2001)+A2(2003)
13

2022-012-R-0017-A2_Draft 4 15
O T I M U S
S O R T E R S
Gateway
17
7.2 Smart module
Cell-stringoptimizer: CSO-72
Input Cell-string (3 per module)
Input MPP voltagerange 7.5Vdc – 20Vdc
Rated for solar PV moduleswith max.
Voc at lowest temperature
20V
Rated for solar PV moduleswith max. Impp at
STC
11.5
Output operational mode Cell-string (3 per
module)
Module
Nominaloutput current (STC) 12V
Nominaloutput voltage(STC) 10V 30V
Max. output current limit 14A
Max. bypass current 14A
Max. output voltageif installed on
solar module
Voc of cell-string Voc of solar module
Max. output voltageif separate
from solar module
20V 60V
Max. output power 475W
Max. reverse current 0A
Output safe mode
Output voltage 1.1±10%Vdc
Compliance
Junction box certication IEC 62790, IEC 62109-3
RoHS Yes
14

2022-012-R-0017-A2_Draft 4 16
O T I M U S
S O R T E R S
Gateway
General data
Operatingtemperaturerange junction box -40 °C / +85 °C
Output wire 2x 1.2 m 4mm2 (standard
conguration)
Connectors MC4 (standard conguration)
Overvoltage category III
Pollution degree Pollution 1 for potting part
Pollution 2 for non-potting part
Degree of protection P65/IP67
Protection class II
Max. system voltage 1000V
15

2022-012-R-0017-A2_Draft 4 17
O T I M U S
S O R T E R S
Gateway
X
Drill/Screw here
TOP
85 mm
P/N: 2021-012-D-0003
taylor.
Drill Template
CAUTION:
- Measure the control line (X). If the control line is not 100 mm, do not use this
drill template.
- Do not drill or screw in electricity lines, water pipes, and such items.
Drill safely.
Use the wall plugs, use a 06 diameter drillbit size and Pozidriv Z1 for driver.
8 Drill template
16

2022-012-R-0017-A2_Draft 4 18
O T I M U S
S O R T E R S
Gateway
Table of contents