
7B53A/7B53AN Operators
TABLE
OF
CONTENTS
Page Page
SECTION I OPERATING INSTRUCTIONS SECTION I OPERATING INSTRUCTIONS (cont)
7B53A/7B53AN Features
1-1
Applications 1-15
General
1-1
General 1-15
Installation
1-1
Comparison Measurement
Controls and Connectors 1-3 Techniques 1-15
Main Triggering Controls 1-3
Time
Duration Measurements 1-16
Sweep Controls 1-4 Determining Frequency 1-16
Delay
Time
Control 1-4 Risetime Measurements 1-17
Delayed Triggering Controls 1-4 Delayed Sweep Measurements 1-18
I
nput/Output
Connectors 1-4 Delayed Sweep Magnification 1-18
Operating
Checkout
1-4 Triggered Delayed Sweep
Introduction
1-4 Magnification 1-20
Setup
Procedure 1-4 Displaying Complex Signals
Sweep
Control
Functions 1-5 Using Delayed Sweep 1-20
Sweep Calibration (front-panel) 1-5 Pulse
Jitter
Measurements 1-21
Main and Delayed Triggering
Functions 1-6 SECTION
II
SPECI FICATlON
General Operating Instructions 1-7
Pushbutton
Switch Logic 1-7 Table 2-1, Electrical
2-1
Triggered Light 1-7 Main Sweep
2-1
Main Trigger Mode 1-7 Delayed Sweep
2-1
Main Triggering Coupling 1-8 Mixed Sweep, Variable Time Delay 2-2
Main Triggering Source 1-9 Amplifier 2-2
Trigger Slope 1-9 Main Triggering 2-3
Trigger Level 1-11 Delayed Triggering 2-4
Selecting Sweep Rates 1-11
Output
Signals 2-4
Time Measurement 1-12 Table 2-2, Environmental 2-5
Sweep Magnifier 1-12 Table 2-3, Physical 2-5
Display Modes 1-13
Delay
Time
Multiplier 1-13 NOTE
Delayed Sweep Triggering 1-14
Input/Output
Connectors 1-14 Refer to the
1853A/1853AN
Service Manual for circuit
X-V
Operation 1-14 description, maintenance, calibration, diagrams, and parts
Mainframe Operating Modes 1-15 replacement information.
®