User's Guide
SLUU656–October 2011
bq27425 EVM: Single-Cell Impedance Track Technology
This evaluation module (EVM) is a complete evaluation system for the bq27425. The EVM includes one
bq27425 circuit module with an integrated current-sense resistor. A separated orderable EV2300 or
EV2400 PC interface board for gas gauge interface along with a PC USB cable, and Windows™-based
PC software is needed when using this EVM. The circuit module includes one bq27425 integrated circuit
and all other onboard components necessary to monitor and predict capacity for a system-side fuel gauge
solution. The circuit module connects directly across the battery pack. With the EV2300 or EV2400
interface board and software, the user can:
•Read the bq27425 data registers
•Program the chipset for different configurations
•Log cycling data for further evaluation
•Evaluate the overall functionality of the bq27425 solution under different charge and discharge
conditions
The latest Windows™ – based PC software can be downloaded from the product folder on the Texas
Instruments Web site.
Contents
1 Features ...................................................................................................................... 2
1.1 Kit Contents ......................................................................................................... 2
1.2 Ordering Information ............................................................................................... 2
2 bq27425-Based Circuit Module ........................................................................................... 3
2.1 Circuit Module Connections ...................................................................................... 3
2.2 Pin Description ..................................................................................................... 3
3 bq27425 Circuit Module Schematic ...................................................................................... 3
3.1 Schematic ........................................................................................................... 3
4 Circuits Module Physical Layout and Bill of Material ................................................................... 3
4.1 Board Layout ....................................................................................................... 3
4.2 Bill of Material ...................................................................................................... 6
4.3 Schematic ........................................................................................................... 6
4.4 bq27425 Circuits Module Performance Specification Summary ............................................. 6
5 EVM Hardware and Software Setup ..................................................................................... 7
5.1 System Requirements ............................................................................................. 7
5.2 Software Installation ............................................................................................... 7
6 Troubleshooting Unexpected Dialog Boxes ............................................................................. 7
7 Hardware Connection ...................................................................................................... 7
7.1 Connecting the bq27425 Circuit Module to a Battery Pack .................................................. 7
7.2 PC Interface Connection .......................................................................................... 8
8 Operation ..................................................................................................................... 8
8.1 Starting the Program .............................................................................................. 8
8.2 Setting Programmable bq27425 Options ....................................................................... 9
9 Calibrate Screen ........................................................................................................... 11
9.1 To Calibrate the bq27425 ....................................................................................... 11
9.2 Coulomb Counter Offset Calibration ........................................................................... 11
9.3 Board Offset Calibration ......................................................................................... 11
9.4 Voltage Calibration ............................................................................................... 11
9.5 Temperature Calibration ......................................................................................... 11
1
SLUU656–October 2011 bq27425 EVM: Single-Cell Impedance Track Technology
Submit Documentation Feedback Copyright ©2011, Texas Instruments Incorporated
This datasheet has been downloaded fromhttp://www.digchip.com at this page