manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Tigo
  6. •
  7. Control System
  8. •
  9. Tigo TS4-A-F User manual

Tigo TS4-A-F User manual

TS4-A-F Quick Start Guide
Pg 1 of 2
1. General Information - Specications
2. Installation
!ATTENTION - READ FIRST
!Wear and USE appropriate PPE for the application.
!Install the TS4-A-F, and/or TS4-A-2F BEFORE powering on the RSS transmitter. All PV
modules from the same inverter must have a TS4 connected.
1. MOUNT 2. Connect MODULES to TS4s 3. Connect the TS4s
!Energy is supplied to the Tigo TS4 output cables immediately upon connection to a PV
module exposed to sunlight. Use care when handling. Do not mate connectors from
different manufacturers.
!Each module in the PV system must contain a TS4-A-F or TS4-A-2F for safe and proper
operation of the PV system.
1. This document is for quick guidance only. For details, please refer to
the TS4-A-F/-2F Installation Manual.
2. Damage caused by failure to follow the contents of the TS4-A-F/-2F
Installation manual is not covered by the warranty.
3. Install all TS4-A-F, and/or TS4-A-2F BEFORE powering on the RSS
transmitter.
4. TS4-A-F, TS4-A-2F and a Tigo RSS Transmitter are a solution to meet
NEC 2017 & 2020 690.12 Rapid Shutdown requirements. TS4-A-F and
TS4-A-2F units automatically enter rapid shutdown mode when the
RSS Transmitter is switched off, and resumes energy production when
power is restored to the RSS Transmitter. Wait 30 seconds after rapid
shutdown activation before disconnecting DC cables or turning off DC
disconnect.
1. PV module Input
• Negative (-) LEFT
• Positive (+) RIGHT
2. Output to String
• Negative (-) LEFT
• Positive (+) RIGHT
Max voltage: 80VDC
Max current Imp/Isc: 20/25ADC
Max power: 700W
Max string voltage: 1000/1500VDC (connector dependent)
System components:
1. PV inverter
2. Tigo RSS Transmitter
3. Tigo TS4-A-Fs (qty. will vary)
4. PV modules (qty. = TS4)
1.1 Package Contents
1.2 Rapid Shutdown (RSD) System Wiring Diagram
1.3 TS4-A-F Overview
Item Quantity
TS4-A-F 20
Quick Start Guide 1
Rapid Shutdown label 1
ATigo RSS Transmitter is
required for the proper
operation of this rapid
shutdown system. For more
information, scan the QR
code here.
Mounting the TS4 to the PV module frame and dressing the input conductors BEFORE taking the module to
the roof helps save time.
Many leading inverters integrate the Tigo RSS Transmitter. Look for the Tigo Enhanced label or check for Tigo
integration partners at https://www.tigoenergy.com/ul-pvrss
A PLC-based RSD system consists of a transmitter and receivers.
TS4-A-F TS4-A-FTS4-A-F TS4-A-FTS4-A-FTS4-A-F TS4-A-FTS4-A-F
TS4-A-F
1
23
1
2 3
4
TS4-A-F
TS4-A-F TS4-A-F TS4-A-F
1
2
3
3. Module clips
• With clips on, mount
to PV module
• Remove clips to
reveal M8 mounting
holes
PN: 002-00101-00 | Rev. 1.1 | Oct. 26, 2022
PN: 002-00101-00 | Rev. 1.1 | Oct. 26, 2022
TS4-A-F Quick Start Guide
Pg 2 of 2
3. Commissioning
!Wear and USE appropriate PPE for the application.
!Wear and USE appropriate PPE for the application. Live voltages may be present.
1. Each PV string will produce less than 30VDC until the RSS Transmitter is activated/powered.
2. When power is provided to the RSS Transmitter the PV strings will produce full voltage under the
environmental conditions.
3. Commission the PV system as per best practice.
3.1 Pre-commissioning checklist
3.2 Commissioning notes
Check Item Acceptance Criteria
TS4 installation All PV modules are connected to a TS4-A-F/TS4-A-2F.
Tigo RSS
Transmitter/PST
The Tigo RSS Transmitter is installed per the RSS Transmitter Installation Manual. If
inverter integrated, follow the inverter manufacturer’s instructions for signal/power.
Voltage check The TS4-A-F passes 0.6VDC when the keep-alive signal is not present.
String voltage = 0.6VDC x # of TS4 in the string
Connections All connectors are securely mated and of same type.
Wire Management
All conductors are properly secured throughout the array. ANSI/NFPA 70 wiring methods
used. Multi transmitter systems have PST transmitters installed and properly wired. Refer
to RSS Transmitter Installation manual for details.
Workmanship Wire management and general best practices were used.
Issue Check
No string voltage Check that all string connectors are securely connected.
Lower voltage than
expected
Check that all PV module connectors are securely connected.
Note – with no keep-alive signal the string voltage will be less than 30VDC.
Check that the RSS transmitter is powered on. If multiple transmitters are used, check that all
are of the Pure Signal Technology (PST) series and are properly wired.
Inconsistent
voltage reading
when no signal is
present
1. Apply power to the RSS Transmitter
2. Use an RSS Signal Detector to determine if the individual TS4s are receiving the keep
alive signal. If so, check the string is less than 300m.
4. Troubleshooting
5. Your Customer Service Contact
United States (HQ):
Tigo Energy, Inc.
655 Campbell Technology Pkwy
Campbell, CA 95008
EMEA Office:
Tigo Energy Italy
Srl Via Calamandrei 36 52025
Montevarchi Tuscany, Italy
Americas: +1 408 402 0802
International: 00800 2255 8446
https://support.tigoenergy.com/
Class II double insulation
High Voltage
DANGER

Other manuals for TS4-A-F

2

Other Tigo Control System manuals

Tigo TS4-A-O User manual

Tigo

Tigo TS4-A-O User manual

Tigo TS4-L User manual

Tigo

Tigo TS4-L User manual

Tigo TS4-R Datasheet

Tigo

Tigo TS4-R Datasheet

Tigo TS4-A User manual

Tigo

Tigo TS4-A User manual

Popular Control System manuals by other brands

Measurement Computing CIO-DAS1401/12 user manual

Measurement Computing

Measurement Computing CIO-DAS1401/12 user manual

Prolon PL-RS quick start guide

Prolon

Prolon PL-RS quick start guide

TROLLMaster ProAngler user manual

TROLLMaster

TROLLMaster ProAngler user manual

SMC Networks CEU2 user guide

SMC Networks

SMC Networks CEU2 user guide

Velux KUX 100 instructions

Velux

Velux KUX 100 instructions

Belimo LonWorks GMX24-LON quick start guide

Belimo

Belimo LonWorks GMX24-LON quick start guide

Condor 900 191 - V1.0 operating instructions

Condor

Condor 900 191 - V1.0 operating instructions

SVT 5100 user manual

SVT

SVT 5100 user manual

SICE Tech WHY PRO WHY-PH1 INSTRUCTION MANUAL AND WARNINGS

SICE Tech

SICE Tech WHY PRO WHY-PH1 INSTRUCTION MANUAL AND WARNINGS

Hunter 45051 Installation and operation manual

Hunter

Hunter 45051 Installation and operation manual

Basler DECS-100 instruction manual

Basler

Basler DECS-100 instruction manual

Genmitsu PROVerXL 6050 Plus user manual

Genmitsu

Genmitsu PROVerXL 6050 Plus user manual

Panasonic Imagechecker P400 Specifications

Panasonic

Panasonic Imagechecker P400 Specifications

BFT RANCH C 275/600CN Instructions for installation

BFT

BFT RANCH C 275/600CN Instructions for installation

Pentair IntelliSync 523404 user guide

Pentair

Pentair IntelliSync 523404 user guide

SMA SUNNY BOYSTORAGE Service manual

SMA

SMA SUNNY BOYSTORAGE Service manual

Beninca VE.500 Operating instructions and spare parts catalogue

Beninca

Beninca VE.500 Operating instructions and spare parts catalogue

Raypak TempTracker mod+ Installation and operation instructions

Raypak

Raypak TempTracker mod+ Installation and operation instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.