
TOA Electronics, Inc.
2. INSTALLATION PROCEDURE
The MB-AM1B-Q(MB-AM1W-Q) may be used to mount the AM-1 in the following ways:
Securing to Podium or Flush-mounted on wall or ceiling
Step 1: Position mount on wall, ceiling or table and mark holes on surface with marker or pencil.
Please make sure to allow sufficient space behind the rear of the mic to be able to insert
the rear mounting screws (approx 2” or more)
(If using toggle bolt proceed to Step 6)
Step 2: Remove mount and drill holes (1/4” recommended) to correspond to anchors to be
used (max screw size #10, provided in kit).
Step 3: Insert anchors into holes, push in place until flush.
Step 4: Place mount on surface aligning with holes.
Step 5: Insert and tighten #10 flat head sheet screws into mount until secure. (Proceed to Step 8)
(For toggle bolt application)
Step 6: Remove mount and drill holes (5/8” recommended) to correspond for toggles to be
used (max screw size #10, provided in kit).
Step 7: Install bolts through countersunk holes in bracket and attach toggle wings (orient so that
they collapse back toward the mount); run wings up screws >5 threads. Push toggle
wings through drilled hole until it expands. Tighten screw until mount is secure.
Step 8: Insert mic plug from AM-1M into rear opening. Snake through to exit point for connection
to AM-1C controller.
Step 9: Align microphone bottom opening to hooks on mount, then push and move right to lock in
place.
Step 10: Insert M3 screws into rear holes and tighten until secure.