14-Feb-22 2 of 10 GH98A
•Review the main operational parameters such as UV Dose, UVI, and UVT.
•Review the Message History for any incidents such as warnings or alarms
•Review the System Info screens for Total Starts (of the lamp) and Power Ups (of
the unit) –this information can reveal excessive lamp cycling or unreliable input
power
•Confirm PCB fan and UV fan are both operational
•Confirm purge valve is working and purge water flows to drain
•Confirm shutoff valve (if installed) stops the water flow when valve is de-
energized
Weekly –For systems that are monitored, there are no weekly requirements.
For unmonitored systems, perform the following tasks every week for the first month of
operation:
•Review the main operational parameters such as UV Dose, UVI, and UVT.
•Review the Message History for any incidents such as warnings or alarms
•Review the System Info screens for Total Starts (of the lamp) and Power Ups (of
the unit) –this information can reveal excessive lamp cycling or unreliable input
power
Monthly Activities
Some activities may depend on the regulation requirements.
First Month –After the first month of operation, it is advisable to perform the following
tasks:
•Review the main operational parameters such as UV Dose, UVI, and UVT.
•Review the Message History for any incidents such as warnings or alarms
•Review the System Info screens for Total Starts (of the lamp) and Power Ups (of
the unit) –this information can reveal excessive lamp cycling or unreliable input
power
•Inspect cleanliness of air filter –clean or replace if necessary. A dirty air filter will
warrant monthly maintenance.
•Inspect the inside of the UV chamber for dust. This includes the UV Lamps, the
outside of the quartz sleeves, the reflectors and the photodiodes of the UV
sensors. Wipe off any dust with a clean, soft cloth or paper towel. Rubbing
alcohol can be used on these surfaces.
•Inspect inside of quartz sleeve for cleanliness. If there is any sign of fouling in the
first month, confirm operation of the wiper and purge valve. Lowering the purge
valve setpoint may be required.