4.Ensure all cabinets are locked properly.
6.Connect the main power cable from power box to screen,and main signal cable from PC to screen.
7.Ensure power&signal cable connected,then turn on power.
8. Insert sending card in CPU at first and please install software in computer , to connect software set up with screen
9. If you use notebook control,put the sending card to sending box,then use the HDMI-DVI cable connect
the sending box with the notebook.
Please be sure to read this section of the security measures before installation,power supply,
operating and adjusting product!
This product is intended for professional use only!
Due to fire, electric shock and drop, the products will result in severe injury or even death
Warning ! Please be careful as the cabinet is heavy! Avoid finger injuries.
Warning! Be careful of shock
Close the general gates when the power cabling and wiring.
Close the gates before disconnecting and connecting any part of the unit cabinet.
Keep good grounding of the product.
The installation location of total power switch should be close to the product and in a obvious, easy place reach
cause we can disconnect the power in time when some error appears.
When finished the display assembling ,please carefully check if power wiring is in good condition.
Warning ! Be careful
The installation location of displays need good ventilation. Do not hang anything on the display.
Warning! Wearing a crash helmet, so as to avoid personal injury.
Instructions
1.Each cabinet equipped with a synchronous receive card.
2.In the height direction,maximum connecting cabinet is 12 unit ones
3.Signal between cabinets use the up and down or left and right, the default cascading is the up and down connection.
5.Connect each cabinet,use screws connect steel connector with steel structure.
And then connect the signal&power cable(in and out) from cabinet to cabinet.