3.3.2
Meters
Agas
meteris
connected
tothe
service
pipe
by
the local gas region or a local gas region
contractor.
Anexisting
metershouldbecheckedto
ensure
that it is capable of passing an additional
2.95 ms/h (106 CFH) before the VCW 20
(or
3.38mslh
(122
CFH)before
theVCW25or
2.47melh
(89
CFH)
before
theVCW-sine18)
is
installed.
3.3.3
lnstallationpipes
Installation
pipes
should
be
fitted
inaccordance
withCP
331
:3.
Pipework
from the meterto the combi boiler
must
beofaadequate
size.Donot
use
pipes
of
a smaller size than the combi boiler gas
connection.
The completeinstallation
must be testedfor
soundness
asdescribedintheabove
Code.
3.4Flue
system
Detailed
recommendationsforfluing
are
given
inBS
5440
:1.Thefollowingnotes
are
intended
togivegeneral
guidance.
\=i= 3.4.1
VCW-sine
(B.F.
Appliance)
The boilermust be installedso that the flue
terminalis
exposed
totheexternal
air.
Terminationshouldbe on a clearexpanse
of
wall;
the terminal being preferably
not less than
600mm(2
ft.)awayfromacorner,
arecessora
projecilon.
Donot installthe terminal:
a) Within300 mm (1 ft.) measured
vertically
fromthebottomofanopenablewindow,
air
vent,
oranyother
ventilation
opening.
b) Within 300 mm (1 ft.) above adjacent
ground
level.
c) Within
600mm (2ft.)of anysurfacefacing
theterminal.
d) lmmediately
beneatheavesora balcony.
Wherethe lowestpart of the termlnal
is less
than2 m(6,6
ft.)abovethelevel
ofany
ground,
balcony,flatroofor placetowhichpeoplehave
access, the terminal must by protected by a
guard
ofdurable
material.
Aterminal
protective
guard
isavailableasanoptionalextrawith
the
combiboiler.The airinleVproducts
outletduct
andtheterminaloftheboilermustnot
becloser
than 50 mm (2 in.) to combustiblematerial.
Detailed recommendations
on Drotection
of
combustible
material
are
given
inBS5440: 1.
3.4.2
VCW(O.F.
Appliance)
Detailedrecommendationsforfluing
are
given
inBS5440:1.Thefollowingnotes
are
intended
togivegeneralguidance.
The crosssectionalareaofthefluefittedtothe
combiboilermustbe notless
thantheareaof
the flueoutletof the appliance.An adapteris
suppliedtoallowthefittingof125mm
steelflue
pipe
or125mmlight
asbestoscement
flue
pipe.
When fitting flue pipes a split socket
connector must be fitted to ensure easy
disconnection of the flue pipe (seepage13
fig.
16).
Fluepipesand fittings
shouldbe constructed
from
oneofthefollowingmaterials:
a) Asbestoscement,
b) Aluminium
orstainlesssteel,
c) Cast-iron acid-resistant
vitreous enamel
lined.
lfdouble-walledflue
pipe
is
useditshouldbeof
atype acceptableto BritishGas.
lfachimney
isusedit
preferably
shouldbeone
thatis composedof or linedwitha nonporous
acid-resistant material. (Chimneys lined
with salt-glazed earthenware pipes are
acceptableifthepipes
complywithBS65and
540:1.)Aflue
pipe
constructedfrom
oneofthe
materialsin
a)toc)above
should
formtheinitial
connection to lined chimneys. Where a
chimney
isto
beusedwhichisnotcomposed
of
or lined with a non-porous acid-resistant
materialitshouldbelinedwith
astainlesssteel
flexibleflue lineror any other
liner
thatis of a
typeacceptabletoBritish
Gas.
Theinternal
dia-
meter
ofthelinermust
notbelessthan
shown
inthe technical
dataandthe number
ofjoints
mustbekepttoaminimum.lf
thefluelinerisnot
to be connected
directlyto the combi boiler
draught diveder a flue pipe which is
constructedfrom
oneofthematerialsin
a)
to
c)
aboveshould
form
theconnection
between
the
draughtdiverterand
flue
liner.
Before connectingthe combi boiler to, or
insertinga liner into, a flue that has been
previously
used,the flue must be thoroughly
sweptcleanofanysoot
and
loosematerial.lfa
register
plate,restrictor
plate,damperetc. is
fitted in the flue, it must be removedbefore
connectingthe combiboilerto, or inserting
a
linerinto,theflue.
The flueshouldterminate
in accordancewith
the relevant recommendations
given in BS
5440:1,table4.
A terminal of a type that has been tested and
found satisfactory by British Gas should be
fitted
at
theflue
outlet.
The point of terminationmust not be within
600mm(2ft.)
ofanopenablewindow,
airvent
oranyotherventilation
opening. c