1
Introduction
This manual provides instructions to install, setup, and operate the components of Veeder-Root Pressure
Management Control (PMC) equipment. The PMC feature is an option for the TLS console platform, and as such,
many of the installation/setup/operation instructions for non-PMC specific tasks are covered in TLS-3XX supplied
literature. Do not use this manual when PMC is installed with ISD. Use the ISD Setup & Operation Manual,
577021-800.
Site Requirements
Below are the requirements for all PMC installations:
• V-R TLS-350R/EMC w/BIR, TLS-350 Plus/EMC Enhanced, TLS-350/EMC and ProMax consoles with ECPU2
- install as per TLS-3XX Site Prep manual, setup following instructions in TLS-3XX System Setup Manual.
• A flash memory board (NVMEM203) for PMC software storage - installed on the ECPU2 board in place of the
console’s 1/2 Meg RAM board - install as per TLS-350 Series Board and Software Replacement Manual, no
setup required.
• Smart Sensor Module and Vapor Pressure Sensor. Install and connect following instructions in the Vapor
Pressure Sensor installation Guide.
• Multiport card connected to a hydrocarbon sensor module installed according to processor manufacturers
specifications.
• A 4-Relay or I/O Combination Module to control the vapor processor motor and setup as instructed in this
manual.
• An RS-232 Port will be available for use by contractor or government inspectors.
Contractor Certification Requirements
Veeder-Root requires the following minimum training certifications for contractors who will install and setup the
equipment discussed in this manual:
Installer (Level 1) Certification: Contractors holding valid Installer Certification are approved to perform wiring and
conduit routing; equipment mounting; probe, sensor and carbon canister vapor polisher installation; wireless equipment
installation; tank and line preparation; and line leak detector installation.
ATG Technician (Level 2/3 or 4) Certification: Contractors holding valid ATG Technician Certifications are approved
to perform installation checkout, startup, programming and operations training, system tests, troubleshooting and
servicing for all Veeder-Root Series Tank Monitoring Systems, including Line Leak Detection. In addition, Contractors
with the following sub-certification designations are approved to perform installation checkout, startup, programming,
system tests, troubleshooting, service techniques and operations training on the designated system.
• Wireless 2
•TallTank
VR Vapor Products Certification: Contractors holding a certification with the following designations are approved to
perform installation checkout, startup, programming, system tests, troubleshooting, service techniques and operations
training on the designated system.
• ISD – In Station Diagnostics
• PMC – Pressure Management Control
• CCVP - Veeder-Root Vapor Polisher
• Wireless – ISD/PMC Wireless
• A current Veeder-Root Technician Certification is a prerequisite for the VR Vapor Products course.
Warranty Registrations may only be submitted by selected Distributors.