Vericom VC5 Series User manual

vericomsolutions.com — +1 (865) 671-4455
OWNER’S MANUAL
Server / Network Cabinet
Installation / Mounting Instructions
VC5 Model Series
ENGLISH

Vericom Global Solutions Legal Disclaimer
While every precaution has been taken to ensure the accuracy and completeness of this document, Vericom assumes no
responsibility and disclaims all liability for damages resulting from use of this information or for any technical or editorial
errors or omissions contained herein. The products covered by this instruction manual are manufactured and/or sold
by Vericom. This document is the property of Vericom and contains condential and proprietary information owned by
Vericom and protected by copyright. No part of this document may be photocopied, reproduced, or translated to another
language without the prior written consent of Vericom.
The only warranties for Vericom products and services are set forth in the express warranty statements accompanying
such products and services. Nothing herein should be construed as constituting an additional warranty.
© 2022 Vericom Global Solutions.
The information contained in this document is subject to change without notice and may not be suitable for all applications.

Table of Contents
Safety Information ....................................................................................................................... 1
Introduction ................................................................................................................................ 2-5
Introduction to the VC5 Series .................................................................................................. 2
Item List ................................................................................................................................. 2-4
Component Identication ........................................................................................................... 5
Included Hardware .................................................................................................................... 5
Tools Required .......................................................................................................................... 5
Installation ............................................................................................................................... 6-12
Unpacking .................................................................................................................................. 6
Moving and Placement ............................................................................................................. 7-8
Leveling ..................................................................................................................................... 9
Anchoring / Floor Mounting ........................................................................................................ 10
Ganging Multiple Cabinets ......................................................................................................... 11
Grounding ................................................................................................................................. 12
Conguration ......................................................................................................................... 13-18
Removing and Installing Doors .................................................................................................. 13
Removing and Installing Side Panels ......................................................................................... 14
Removing and Installing Top Panel ........................................................................................... 14
Removing and Installing Bottom Panel ....................................................................................... 15
Adjusting Mounting Rail Position ........................................................................................... 16-18
Equipment Installation .......................................................................................................... 19-20
Specications ........................................................................................................................ 21-24
Weight Capacity ....................................................................................................................... 21
Size Chart .......................................................................................................................... 21-24
Optional Accessories ............................................................................................................ 25-26
Cable Management ................................................................................................................. 25
Thermal Management ............................................................................................................. 25
Storage / Shelves .................................................................................................................... 25
Hardware & Mounting .............................................................................................................. 26
Doors ...................................................................................................................................... 26
Side Panels ............................................................................................................................ 26
Other Miscellaneous Accessories .............................................................................................. 27
Warranty Information .................................................................................................................. 27

1
IMPORTANT SAFETY INFORMATION
Save These Instructions
This manual contains important safety information and instructions that should be followed during the installation and use
of this product. Read and follow all safety, installation, and operating instructions contained in this manual to maintain
compliance with agency listings. Failure to follow these instructions may result in equipment damage, personal injury, or
death, and may void the warranty.
• Only trained service personnel should receive, unpack, and assemble this product.
• Inspect the shipping container and the cabinet for damage prior to installation. Do not use if the cabinet is damaged.
• Move the cabinet as close to the installation location as possible before removing packing materials. Casters are
meant for moving the cabinet over short distances only on smooth, at surfaces.
• Use caution when cutting packing materials. Damage that occurs during unpacking is not covered by the warranty.
• Save all packing materials for future use.
• Do not attempt to remove the cabinet from the pallet unassisted – a minimum of 2 people is required.
• Use extreme caution when moving the cabinet on its casters. Sudden stops, excessive force, or uneven surfaces may
cause the cabinet to tip over, potentially causing personal injury and/or property damage.
• When rolling the cabinet on casters, always push from the front or rear. Never push on the side panels.
• Casters are only designed for short-distance movement and not long-term support. Use the levelers and/or mounting
brackets for long-term support and security.
• Install the cabinet in a controlled indoor environment, free from moisture, ammable liquids, gasses, corrosive
substances, dust and other contaminants, and temperature extremes. Do not use outdoors or in harsh environments.
• This cabinet must be installed on a at, level, structurally sound surface that is able to bear the weight of the cabinet
and all the installed equipment, as well as neighboring cabinets and their equipment.
• Leave adequate space at the front and rear of the cabinet for proper ventilation and door swings.
• Never block or insert objects into the ventilation holes or other openings.
• Anchor the cabinet to the oor using the mounting brackets that secured the cabinet to the shipping pallet.
• Only trained service personnel should install equipment in the cabinet.
• Install equipment from the bottom up, never from the top down, and install the heaviest equipment in the bottom
one-third of the cabinet.
• Be sure to read and follow all individual manufacturer equipment manuals for safety and installation instructions.
• This product is designed for commercial/industrial use only. It is not intended for use with life support or other
U.S. FDA designated “critical” devices.

2
INTRODUCTION
Vericom VC5 Series Data, Network, and Server Cabinets are robust, high-quality solutions for storing a wide variety of
standard EIA-310 19” rack mount equipment. Available in several height/width/depth combinations, VC5 cabinets provide
the versatility and exibility to meet the needs of today’s demanding applications. And with an expansive list of available
accessories, VC5 cabinets can be further customized for specic installations.
This manual includes instructions for the installation and basic conguration of VC5 cabinets. For more detailed
specications and dimensions of a specic model, please refer to the specication drawing and data sheet available for
download on our website.
VC5 Models
NOTE: Not all models are available in all regions. Please contact your Vericom representative for additional information.
VC5-6842- x¹x²x³x⁴x⁵ 42U x 24” (600mm) W x 31.5” (800mm) D Server Cabinet *
VC5-6845- x¹x²x³x⁴x⁵ 45U x 24” (600mm) W x 31.5” (800mm) D Server Cabinet *
VC5-6942- x¹x²x³x⁴x⁵ 42U x 24” (600mm) W x 35.4” (900mm) D Server Cabinet
VC5-6945- x¹x²x³x⁴x⁵ 45U x 24” (600mm) W x 35.4” (900mm) D Server Cabinet
VC5-6947- x¹x²x³x⁴x⁵ 47U x 24” (600mm) W x 35.4” (900mm) D Server Cabinet
VC5-6948- x¹x²x³x⁴x⁵ 48U x 24” (600mm) W x 35.4” (900mm) D Server Cabinet
VC5-6042- x¹x²x³x⁴x⁵ 42U x 24” (600mm) W x 39.4” (1000mm) D Server Cabinet
VC5-6045- x¹x²x³x⁴x⁵ 45U x 24” (600mm) W x 39.4” (1000mm) D Server Cabinet
VC5-6047- x¹x²x³x⁴x⁵ 47U x 24” (600mm) W x 39.4” (1000mm) D Server Cabinet
VC5-6048- x¹x²x³x⁴x⁵ 48U x 24” (600mm) W x 39.4” (1000mm) D Server Cabinet
VC5-6A24- x¹x²x³x⁴x⁵ 24U x 24” (600mm) W x 42” (1070mm) D Server Cabinet *
VC5-6A42- x¹x²x³x⁴x⁵ 42U x 24” (600mm) W x 42” (1070mm) D Server Cabinet *
VC5-6A45- x¹x²x³x⁴x⁵ 45U x 24” (600mm) W x 42” (1070mm) D Server Cabinet *
VC5-6A47- x¹x²x³x⁴x⁵ 47U x 24” (600mm) W x 42” (1070mm) D Server Cabinet
VC5-6A48- x¹x²x³x⁴x⁵ 48U x 24” (600mm) W x 42” (1070mm) D Server Cabinet *
VC5-6A52- x¹x²x³x⁴x⁵ 52U x 24” (600mm) W x 42” (1070mm) D Server Cabinet *
VC5-6124- x¹x²x³x⁴x⁵ 24U x 24” (600mm) W x 43.3” (1100mm) D Server Cabinet
VC5-6142- x¹x²x³x⁴x⁵ 42U x 24” (600mm) W x 43.3” (1100mm) D Server Cabinet
VC5-6145- x¹x²x³x⁴x⁵ 45U x 24” (600mm) W x 43.3” (1100mm) D Server Cabinet
VC5-6147- x¹x²x³x⁴x⁵ 47U x 24” (600mm) W x 43.3” (1100mm) D Server Cabinet
VC5-6148- x¹x²x³x⁴x⁵ 48U x 24” (600mm) W x 43.3” (1100mm) D Server Cabinet
VC5-6152- x¹x²x³x⁴x⁵ 52U x 24” (600mm) W x 43.3” (1100mm) D Server Cabinet
VC5-6224- x¹x²x³x⁴x⁵ 24U x 24” (600mm) W x 48” (1200mm) D Server Cabinet
VC5-6242- x¹x²x³x⁴x⁵ 42U x 24” (600mm) W x 48” (1200mm) D Server Cabinet *
VC5-6245- x¹x²x³x⁴x⁵ 45U x 24” (600mm) W x 48” (1200mm) D Server Cabinet *
VC5-6247- x¹x²x³x⁴x⁵ 47U x 24” (600mm) W x 48” (1200mm) D Server Cabinet
VC5-6248- x¹x²x³x⁴x⁵ 48U x 24” (600mm) W x 48” (1200mm) D Server Cabinet *
VC5-6252- x¹x²x³x⁴x⁵ 52U x 24” (600mm) W x 48” (1200mm) D Server Cabinet *
VC5-7842- x¹x²x³x⁴x⁵ 42U x 29.5” (750mm) W x 31.5” (800mm) D Data Cabinet
VC5-7845- x¹x²x³x⁴x⁵ 45U x 29.5” (750mm) W x 31.5” (800mm) D Data Cabinet
VC5-7942- x¹x²x³x⁴x⁵ 42U x 29.5” (750mm) W x 35.4” (900mm) D Data Cabinet
VC5-7945- x¹x²x³x⁴x⁵ 45U x 29.5” (750mm) W x 35.4” (900mm) D Data Cabinet
VC5-7947- x¹x²x³x⁴x⁵ 47U x 29.5” (750mm) W x 35.4” (900mm) D Data Cabinet
VC5-7948- x¹x²x³x⁴x⁵ 48U x 29.5” (750mm) W x 35.4” (900mm) D Data Cabinet
VC5-7952- x¹x²x³x⁴x⁵ 52U x 29.5” (750mm) W x 35.4” (900mm) D Data Cabinet

3
VC5-7042- x¹x²x³x⁴x⁵ 42U x 29.5” (750mm) W x 39.4” (1000mm) D Data Cabinet
VC5-7045- x¹x²x³x⁴x⁵ 45U x 29.5” (750mm) W x 39.4” (1000mm) D Data Cabinet
VC5-7047- x¹x²x³x⁴x⁵ 47U x 29.5” (750mm) W x 39.4” (1000mm) D Data Cabinet
VC5-7048- x¹x²x³x⁴x⁵ 48U x 29.5” (750mm) W x 39.4” (1000mm) D Data Cabinet
VC5-7052- x¹x²x³x⁴x⁵ 52U x 29.5” (750mm) W x 39.4” (1000mm) D Data Cabinet
VC5-7A24- x¹x²x³x⁴x⁵ 24U x 29.5” (750mm) W x 42” (1070mm) D Data Cabinet
VC5-7A42- x¹x²x³x⁴x⁵ 42U x 29.5” (750mm) W x 42” (1070mm) D Data Cabinet
VC5-7A45- x¹x²x³x⁴x⁵ 45U x 29.5” (750mm) W x 42” (1070mm) D Data Cabinet
VC5-7A47- x¹x²x³x⁴x⁵ 47U x 29.5” (750mm) W x 42” (1070mm) D Data Cabinet
VC5-7A48- x¹x²x³x⁴x⁵ 48U x 29.5” (750mm) W x 42” (1070mm) D Data Cabinet
VC5-7A52- x¹x²x³x⁴x⁵ 52U x 29.5” (750mm) W x 42” (1070mm) D Data Cabinet
VC5-7124- x¹x²x³x⁴x⁵ 24U x 29.5” (750mm) W x 43.3” (1100mm) D Data Cabinet
VC5-7142- x¹x²x³x⁴x⁵ 42U x 29.5” (750mm) W x 43.3” (1100mm) D Data Cabinet
VC5-7145- x¹x²x³x⁴x⁵ 45U x 29.5” (750mm) W x 43.3” (1100mm) D Data Cabinet
VC5-7147- x¹x²x³x⁴x⁵ 47U x 29.5” (750mm) W x 43.3” (1100mm) D Data Cabinet
VC5-7148- x¹x²x³x⁴x⁵ 48U x 29.5” (750mm) W x 43.3” (1100mm) D Data Cabinet
VC5-7152- x¹x²x³x⁴x⁵ 52U x 29.5” (750mm) W x 43.3” (1100mm) D Data Cabinet
VC5-7224- x¹x²x³x⁴x⁵ 24U x 29.5” (750mm) W x 48” (1200mm) D Data Cabinet
VC5-7242- x¹x²x³x⁴x⁵ 42U x 29.5” (750mm) W x 48” (1200mm) D Data Cabinet
VC5-7245- x¹x²x³x⁴x⁵ 45U x 29.5” (750mm) W x 48” (1200mm) D Data Cabinet
VC5-7247- x¹x²x³x⁴x⁵ 47U x 29.5” (750mm) W x 48” (1200mm) D Data Cabinet
VC5-7248- x¹x²x³x⁴x⁵ 48U x 29.5” (750mm) W x 48” (1200mm) D Data Cabinet
VC5-7252- x¹x²x³x⁴x⁵ 52U x 29.5” (750mm) W x 48” (1200mm) D Data Cabinet
VC5-8842- x¹x²x³x⁴x⁵ 42U x 31.5” (800mm) W x 31.5” (800mm) D Network Cabinet *
VC5-8845- x¹x²x³x⁴x⁵ 45U x 31.5” (800mm) W x 31.5” (800mm) D Network Cabinet *
VC5-8942- x¹x²x³x⁴x⁵ 42U x 31.5” (800mm) W x 35.4” (900mm) D Network Cabinet
VC5-8945- x¹x²x³x⁴x⁵ 45U x 31.5” (800mm) W x 35.4” (900mm) D Network Cabinet
VC5-8947- x¹x²x³x⁴x⁵ 47U x 31.5” (800mm) W x 35.4” (900mm) D Network Cabinet
VC5-8948- x¹x²x³x⁴x⁵ 48U x 31.5” (800mm) W x 35.4” (900mm) D Network Cabinet
VC5-8952- x¹x²x³x⁴x⁵ 52U x 31.5” (800mm) W x 35.4” (900mm) D Network Cabinet
VC5-8042- x¹x²x³x⁴x⁵ 42U x 31.5” (800mm) W x 39.4” (1000mm) D Network Cabinet
VC5-8045- x¹x²x³x⁴x⁵ 45U x 31.5” (800mm) W x 39.4” (1000mm) D Network Cabinet
VC5-8047- x¹x²x³x⁴x⁵ 47U x 31.5” (800mm) W x 39.4” (1000mm) D Network Cabinet
VC5-8048- x¹x²x³x⁴x⁵ 48U x 31.5” (800mm) W x 39.4” (1000mm) D Network Cabinet
VC5-8052- x¹x²x³x⁴x⁵ 52U x 31.5” (800mm) W x 39.4” (1000mm) D Network Cabinet
VC5-8A24- x¹x²x³x⁴x⁵ 24U x 31.5” (800mm) W x 42” (1070mm) D Network Cabinet
VC5-8A42- x¹x²x³x⁴x⁵ 42U x 31.5” (800mm) W x 42” (1070mm) D Network Cabinet *
VC5-8A45- x¹x²x³x⁴x⁵ 45U x 31.5” (800mm) W x 42” (1070mm) D Network Cabinet *
VC5-8A47- x¹x²x³x⁴x⁵ 47U x 31.5” (800mm) W x 42” (1070mm) D Network Cabinet
VC5-8A48- x¹x²x³x⁴x⁵ 48U x 31.5” (800mm) W x 42” (1070mm) D Network Cabinet *
VC5-8A52- x¹x²x³x⁴x⁵ 52U x 31.5” (800mm) W x 42” (1070mm) D Network Cabinet *
VC5-8124- x¹x²x³x⁴x⁵ 24U x 31.5” (800mm) W x 43.3” (1100mm) D Network Cabinet
VC5-8142- x¹x²x³x⁴x⁵ 42U x 31.5” (800mm) W x 43.3” (1100mm) D Network Cabinet
VC5-8145- x¹x²x³x⁴x⁵ 45U x 31.5” (800mm) W x 43.3” (1100mm) D Network Cabinet
VC5-8147- x¹x²x³x⁴x⁵ 47U x 31.5” (800mm) W x 43.3” (1100mm) D Network Cabinet
VC5-8148- x¹x²x³x⁴x⁵ 48U x 31.5” (800mm) W x 43.3” (1100mm) D Network Cabinet
VC5-8152- x¹x²x³x⁴x⁵ 52U x 31.5” (800mm) W x 43.3” (1100mm) D Network Cabinet
VC5-8224- x¹x²x³x⁴x⁵ 24U x 31.5” (800mm) W x 48” (1200mm) D Network Cabinet

4
VC5-8242- x¹x²x³x⁴x⁵ 42U x 31.5” (800mm) W x 48” (1200mm) D Network Cabinet *
VC5-8245- x¹x²x³x⁴x⁵ 45U x 31.5” (800mm) W x 48” (1200mm) D Network Cabinet *
VC5-8247- x¹x²x³x⁴x⁵ 47U x 31.5” (800mm) W x 48” (1200mm) D Network Cabinet
VC5-8248- x¹x²x³x⁴x⁵ 48U x 31.5” (800mm) W x 48” (1200mm) D Network Cabinet *
VC5-8252- x¹x²x³x⁴x⁵ 52U x 31.5” (800mm) W x 48” (1200mm) D Network Cabinet *
x¹: Front door designation (A=single mesh; B=split mesh; C=high flow mesh; D=solid steel; E=acrylic window
w/solid steel frame; F=glass window w/vented steel frame; H=steel w/hexagon holes)
x²: Rear door designation (A=single mesh; B=split mesh; C=high flow mesh; D=solid steel; E=acrylic window
w/solid steel frame; F=glass window w/vented steel frame; H=steel w/hexagon holes)
x³: Top panel designation (V=vented; F=w/fans; S=solid)
x⁴: Color designation (0=White RAL7035; 1=Black RAL9005; 2=White RAL9002)
x⁵: Delivery option (A=Assembled; F=Flat Packed)
*: Denotes models stocked at global headquarters in Knoxville, TN

5
Included Hardware
• (50) 10-32 screws
• (50) cage nuts
• (6) keys
• (2) oor mounting brackets
• (1) cage nut tool
1. Cabinet frame 4. Rear door 7. Bottom panel
2. Mounting rails (4) 5. Side panels (4) 8. Zero-U PDU lacing panels (2)
3. Front door 6. Top panel 9. Casters and levelers
Tools Required
• Utility knife
• Phillips screwdriver and/or power drill with Phillips bit
• 10mm socket, box, or open end wrench (optional)
• 9/16” socket, box, and/or open end wrench (2 required)
• 19mm open end wrench
• Carpenter’s level (min 3 ft recommended)

6
INSTALLATION
Unpacking
This cabinet is very heavy – do not attempt to unpack, move, or install it without assistance.
NOTE: Upon receipt and before moving or unpacking the cabinet, inspect the packaging for signs of damage or mishandling during
shipment. If any is found, notify the carrier immediately and contact your distributor or Vericom representative.
1. Before removing any packaging, use a forklift or pallet jack to move the cabinet on its pallet as close to the nal
installation location as possible.
2. Use a utility knife to carefully cut the plastic stretch wrap along one of the corner protectors. Do not cut between
two corner protectors as you risk scratching the cabinet. Remove the outer layer of stretch wrap.
3. Remove the corner protectors and save if the cabinet will be reshipped.
4. Carefully remove the inside layer of stretch wrap and/or the plastic bag. Do not allow the utility knife to come in
contact with the cabinet.
5. Inspect the cabinet once again for damage
(NOTE: do not install equipment in a cabinet with structural damage).
Remove the hardware pack and any boxed accessories packed inside the cabinet. If any items are missing,
please call customer service at 865-671-4455, M-F 8:00AM-5:00PM ET, for replacement.
6. To remove the Mounting Brackets, open and/or remove the doors (see instructions for removing the doors on
page 13). Using a 9/16” socket and box wrench or crescent wrench, remove the bolts that secure the Mounting
Bracket to the pallet.

7
7. Next, use a 10mm socket, box wrench, or a Phillips screwdriver to remove the bolts that secure the Mounting
Bracket to the cabinet.
NOTE: Do not throw away the Mounting Brackets or the 10mm bolts – they are used to anchor the cabinet to the floor.
8. Use a 19mm open end wrench to completely raise the levelers. Rotate levers counterclockwise to raise them and
clockwise to lower them.
Moving and Placement
Remember these important safety instructions when moving this cabinet:
• Do not attempt to remove the cabinet from the pallet unassisted – a minimum of 2 people is required.
• Use extreme caution when moving the cabinet on its casters. Sudden stops, excessive force, or uneven surfaces may
cause the cabinet to tip over, potentially causing personal injury and/or property damage.
• When rolling the cabinet on casters, always push from the front or rear. Never push on the side panels.
• Casters are only designed for short-distance movement and not long-term support. Use the levelers and/or mounting
brackets for long-term support and security.
1. To make it easier to remove the cabinet from the pallet, you may wish to remove the doors (if not already
removed) and side panels. See pages 13 - 14 for instructions on how to remove both items.
2. With at least one person positioned in front of the cabinet and one person at the rear, push the cabinet forward
until the front casters are well o the edge of the pallet. Slowly tip the cabinet forward until the front casters are
resting on the oor. Continue to carefully slide the cabinet forward until the rear casters are o the edge of the
pallet and resting on the oor.

8
3. Move the cabinet into the desired installation position. Refer to the chart below to ensure proper clearance
around all sides for installation and maintenance of installed equipment.
4. If ganging cabinets together, remove round plastic caps from sides that will be ganged (4 per side).
CABINET
WIDTH
CABINET
DEPTH ABC D E
24 in.
(600 mm)
31.5 in. (800 mm) 64.2 in. (1630 mm)
10.3 in.
(269 mm)
22.1 in.
(561mm)
45.9 in.
(1167 mm)
45.9 in.
(1167 mm)
35.4 in. (900 mm) 68.1 in. (1730 mm)
39.4 in. (1000 mm) 72.0 in. (1830 mm)
42.0 in. (1067 mm) 74.0 in. (1879 mm)
43.3 in. (1100 mm) 76.0 in. (1930 mm)
47.2 in (1200 mm) 79.9 in. (2030 mm)
31.5 in.
(800 mm)
31.5 in. (800 mm) 76.0 in. (1930 mm)
14.5 in.
(368 mm)
30.0 in.
(761 mm)
61.7 in.
(1567 mm)
61.7 in.
(1567 mm)
35.4 in. (900 mm) 79.9 in. (2030 mm)
39.4 in. (1000 mm) 83.8 in. (2130 mm)
42.0 in. (1067 mm) 86.5 in. (2196 mm)
43.3 in. (1100 mm) 87.8 in. (2230 mm)
47.2 in (1200 mm) 91.7 in. (2330 mm)

9
Leveling
REMINDER: This cabinet must be installed on a at, level, structurally sound surface that is able to bear the weight of the
cabinet and all the installed equipment, as well as neighboring cabinets and their equipment.
1. Using a 19mm open end wrench or crescent wrench, lower all four levelers until they come in rm contact with
the oor. Rotate levelers clockwise to lower them and counterclockwise to raise them.
2. Place a carpenter’s level across the bottom of the cabinet and check to see if it is level both side to side and front
to back. If it is not, adjust the levelers accordingly until the cabinet is level in both directions and does not rock in
any direction. NOTE: All four levelers must maintain rm contact with the oor during adjustment.
3. Raise the hex nut on the leveler up until it reaches the bottom of the cabinet and snug with the 19mm wrench.
This will lock the leveler in place.

10
Anchoring / Floor Mounting
All VC5 cabinets should be anchored to the oor to ensure proper safety. Failure to do so can lead to serious injury and/or
damage to your equipment.
1. To anchor the cabinet to the oor, reuse the mounting brackets that secured the cabinet to the pallet.
2. Place the mounting brackets at the front and rear of the cabinet and use the M6 hex head screws (the same
screws that secured the mounting bracket to the cabinet and were previously removed) to fasten the
brackets to the cabinet frame.
3. Secure the brackets to the oor using user-supplied hardware.
CABINET
WIDTH
CABINET
DEPTH* ABC D
24 in.
(600 mm)
31.5 in. (800 mm) 31.5 in. (800 mm)
1.0 in.
(25 mm)
10.2 in.
(260 mm)
6.7 in.
(170 mm)
35.4 in. (900 mm) 35.4 in. (900 mm)
39.4 in. (1000 mm) 39.4 in. (1000 mm)
42.0 in. (1067 mm) 42.0 in. (1067 mm)
43.3 in. (1100 mm) 43.3 in. (1100 mm)
47.2 in (1200 mm) 47.2 in (1200 mm)
31.5 in.
(800 mm)
31.5 in. (800 mm) 31.5 in. (800 mm)
18.1 in.
(460 mm)
35.4 in. (900 mm) 35.4 in. (900 mm)
39.4 in. (1000 mm) 39.4 in. (1000 mm)
42.0 in. (1067 mm) 42.0 in. (1067 mm)
43.3 in. (1100 mm) 43.3 in. (1100 mm)
47.2 in (1200 mm) 47.2 in (1200 mm)
* Including doors

11
Ganging
WARNING: Ganging of cabinets provides limited stability and is not a substitute for proper leveling and
anchoring to the oor.
NOTE: Item # RAGAN04 Ganging Kit is required to gang two cabinets together (sold separately).
1. Cabinets can be ganged together with or without side panels installed.
2. Ensure cabinets are level and anchored to the oor before ganging.
3. If installed, remove the front and rear doors (see instructions for removing doors on page 13).
4. Install (2) ganging brackets on the front posts and (2) on the rear posts, using (2) M5 screws to secure each
bracket. One bracket should be installed towards the top of the cabinet and the other towards the bottom.
5. Replace doors if removed.

12
Grounding
WARNING: Electrical Shock Hazard
Each cabinet must be connected to the Common Bonding Network (CBN) separately – do not daisy-chain. Do not use the
cabinet without an earth ground connection.
1. There are four 16mm cable entry holes in the bottom of the cabinet frame (one in each corner). Select the location
that is most appropriate for your installation, remove the plastic plug, and route the ground wire (not included) up
through the hole from below the cabinet.
NOTE: Select the ground wire conductor size based on guidance from national and local electrical codes and install
according to those codes.
2. Attach the ground wire to the cabinet frame as shown below using the included M6 copper screw. Be sure to
install the included paint piercing washer between the ground terminal and the cabinet frame, or alternatively
remove the paint on the frame under the ground terminal, as per NEC NFPA 70 Article 250.12.
3. Torque the screw to 8 N-m (70 lb-in).
4. Place the included yellow ground symbol label on the cabinet frame next to the ground location.

13
CONFIGURATION
The VC5 Series Cabinet is designed for exibility and can be congured to meet a wide variety of application
requirements.
Removing and Installing Doors
1. Open the door a minimum of 90°.
2. Disconnect the door’s ground wire.
3. Lift the door o the hinges and move it away from the cabinet.
4. Reverse steps 1-3 to reinstall the door.
NOTE: The top hinge pin is longer than the lower pins. When reinstalling the door, align the top hinge pin with the top door
hinge rst, then align the lower pins and hinges.
5. Refer to separate instructions for reversing the swing of a single door.

14
Removing and Installing Side Panels
VC5 Series Cabinets include (4) side panels that are
easily removable.
1. Use the key to unlock the side panel.
2. Disconnect the panel’s ground wire.
3. Lift up on the lock latch and tilt the panel away
from the cabinet.
4. Lift up on the panel and move away from
the cabinet.
5. Reverse steps 1-4 to reinstall the side panel.
Removing and Installing the Top Panel
1. Use a Phillips screwdriver to remove the
(4) screws securing the top panel to the cabinet
frame (one in each corner).
2. Lift o the top panel.
3. Reverse steps 1-2 to reinstall the top panel.

15
Removing and Installing the Bottom Panel
The standard conguration of the VC5 Series Cabinet includes a bottom panel consisting of three or four center panels
(depending on the depth of the cabinet) and two side panels that run the entire depth of the cabinet. Each center panel
can be removed individually, or the entire bottom can be removed. To remove the entire bottom:
1. Use a Phillips screwdriver to remove the two screws that secure each center panel to the side panels.
Lift o each center panel and set aside.
2. Remove the two screws that secure each side panel to cabinet frame.
3. Carefully lift the side panel enough to slide it out from under the mounting rails.

16
Adjusting Mounting Rail Position
VC5 Series Cabinets include two sets of preinstalled mounting rails that can be innitely adjusted front to back.
WARNING: Do not attempt to adjust rail position with equipment installed.
NOTE: Each rail must remain perpendicular to the cross members of the side frame after adjustment. In addition, both
front rails must be the same distance from the front of the cabinet, and both rear rails must be the same distance from the
rear of the cabinet. Failure to maintain these parameters will make equipment and accessory installation very dicult.
24” (600mm) wide cabinets:
1. Each mounting rail is secured to the side frame at the top, middle, and bottom with a M5 screw. Remove
these three screws using a Phillips screwdriver.
2. Slide the mounting rail into the desired position. Measure the distance from the rail to the outside of the
cabinet frame at the top and bottom of the rail to ensure perpendicular positioning.
3. Install the three M5 screws to secure the mounting rail to the frame.

17
29.5” (750mm) and 31.5” (800mm) wide cabinets:
1. Remove the M5 screws at the top and bottom of the mounting rail.
2. Remove the two M5 screws from the top edge of the rail extension bracket.
3. Slide the mounting rail into the desired position. Measure the distance from the rail to the outside of the cabinet
frame at the top and bottom of the rail to ensure perpendicular positioning.
NOTE: Mounting positions on the side frame cross members are numbered to help you position left and right
mounting rails at the same depth.
4. Install the four M5 screws to secure the mounting rail and rail extension bracket to the side frame.