Vertiv Tech SmartCabinet2-E Series User manual


SmartCabinet2-E Series Computer Room Solution Product
User Manual
Version V1.30
Revision Date 2020-06-18
BOM
Vertiv Tech Co., Ltd. provides customers with technical support. Users may contact the nearest
Vertiv local sales office or service center.
Copyright by Vertiv Tech Co., Ltd.
All rights reserved. The contents in this document are subject to change without notice.
Vertiv Tech Co., Ltd.
Address: XUEYUAN ROAD, NANSHAN I PARK, BLOCK B2, NANSHAN DISTRICT, SHENZHEN
China
Post Code: 518055
Homepage: www.Vertiv.com
Customer service hotline: 4008876510(GC only)
E-mail: Vertivc.service@vertiv.com

Safety precautions
1. Keep this manual throughout the life of the product.
2. Users should read this manual carefully before performing any operation on the product.
3. “Notices” and “Warnings” in this manual do not represent all safety precautions to be observed, but they are
only supplements to various operational safety precautions.
4. This product is professional equipment, used in industrial, commercial or other professional occasions, not to
the general public.
5. This product is only used for the purpose of its design. The manufacturer will not bear any responsibility for
incorrect use.
6. The key provided by the product must be kept by the person responsible for maintenance.
Electrical safety
Dangerous voltage
Danger
Some components of the system carry dangerous voltage in operation. Direct contact or indirect contact
through moist objects with these components will result in fatal injury.
Safety rules in the industry must be observed for installation of the AC power supply. The installation personnel
must be licensed to operate high voltage and AC power.
Never wear a watch, bracelet, bangle, ring, or other conductive objects during operation.
When water or moisture is found on the cabinet, turn off the power immediately. In a moist environment,
precautions must be taken to keep moisture out of the power supply.
In the installation process, a prohibition signboard must be put on the operating switch and button.
Danger
High voltage construction operation may cause fire or electric shock. Areas for connection and wiring of
AC cables must be in compliance with the local rules and regulations.Only those who are licensed to
operate high voltage and AC power can perform high voltage operations.
High leakage current
Warning
High contact current must be grounded before power connection.
Tools
Warning
In high voltage and AC operation, special tools must be used. No common or self-carried tools should be
used.
危险
危险
危险
危险

In thunderstorms, a strong electromagnetic field will be generated in the air. Therefore, equipment should be well
earthed in time to avoid damage by lightning strikes.
ESD
Notices
Static electricity generated by the human body will damage the static sensitive elements, such as large-
scale integrated circuits (ICs), on the circuit board. Before touching the equipment or holding a plugboard,
the circuit board, or an IC chip, an ESD wrist strap must be worn to prevent body static electricity from
damaging the static sensitive elements. The other end of the ESD wrist strap must be well earthed.
Reversed connection
Warning
It is forbidden to connect the live wire (L) and neutral wire (N) of AC input in reverse. Otherwise, the
system equipment will be damaged.
Never wear a watch, bracelet, bangle, ring, or other conductive objects during operation.
Insulated tools must be used during operation.
During live operation, the hand, wrist, arm must be kept in the tense state, to prevent such an accident that the
tool or the human body moves with a large amplitude in the case of tool slipping.
Others
Sharp object
Warning
When moving the equipment by hand, wear protective gloves to avoid injury by sharp objects.
Power cable
Notices
Prior to cable connection, verify the compliance of the cable and cable label with the actual installation.
Binding of signal cables
Notices
The signal cables should be bound separately from heavy current or high voltage wires, with a binding
interval of at least 150 mm.
危险
危险
危险
危险
危险

Contents
Chapter 1 Product Overview...............................................................................................................................................1
1.1 Model Description.................................................................................................................................................1
1.2 Application Scenario.............................................................................................................................................1
1.3 Product Characteristics.........................................................................................................................................1
1.4 Product Specification and Appearance.................................................................................................................2
1.5 Using Environment................................................................................................................................................3
1.5.1 Operating Environment..............................................................................................................................3
1.5.2 Storage Environment.................................................................................................................................3
1.5.3 Space ........................................................................................................................................................3
1.5.4 Load Bearing Capacity ..............................................................................................................................4
1.6 System Architecture..............................................................................................................................................4
1.6.1 Cabinet Structural Components.................................................................................................................4
1.6.2 Power Supply and Distribution System......................................................................................................4
1.6.3 Cooling System .........................................................................................................................................6
1.6.4 Monitoring management system................................................................................................................6
1.6.5 Alarm system.............................................................................................................................................6
1.6.6 Lightning protection grounding system......................................................................................................6
1.7 Technical Specifications .......................................................................................................................................6
Chapter 2 Product Installation And Commissioning............................................................................................................8
2.1 Installation Preparation.........................................................................................................................................8
2.1.1 Materials....................................................................................................................................................8
2.1.2 Tools and Accessories...............................................................................................................................8
2.1.3 Installation Environment ..........................................................................................................................10
2.1.4 Personnel ................................................................................................................................................11
2.2 Equipment Installation.........................................................................................................................................11
2.2.1 Moving and Handling...............................................................................................................................11
2.2.2 Installing the Cabinet...............................................................................................................................12
2.2.3 ECO fan module......................................................................................................................................15
2.2.4 The wiring of water immersion sensor.....................................................................................................17
2.2.5 Battery module (optional).........................................................................................................................17
2.2.6 GSM MODEM installation (optional)........................................................................................................19
2.2.7 Install Airduct (optional)...........................................................................................................................20
2.2.8 User Cable Connection............................................................................................................................21
2.2.9 Installation Inspection..............................................................................................................................21
2.3 Software and Hardware Commissioning.............................................................................................................22
2.3.1 Commissioning process...........................................................................................................................22
2.3.2 Preparation..............................................................................................................................................22
2.3.3 Inspection................................................................................................................................................22
2.3.4 Startup commissioning ............................................................................................................................23
2.3.5 System commissioning............................................................................................................................24
2.3.6 Smart door lock commissioning...............................................................................................................25

2.3.7 Shutdown.................................................................................................................................................26
Chapter 3 Operation Settings............................................................................................................................................27
3.1 HMI Local Display Interface................................................................................................................................27
3.1.1 Introduction to Local Display....................................................................................................................27
3.1.2 Startup Screen.........................................................................................................................................27
3.1.3 Home.......................................................................................................................................................28
3.1.4 Thermal ...................................................................................................................................................28
3.1.5 Power ......................................................................................................................................................29
3.1.6 ENV.........................................................................................................................................................31
3.1.7 Alarm.......................................................................................................................................................31
3.1.8 Log ..........................................................................................................................................................32
3.1.9 Settings....................................................................................................................................................33
3.2 Remote WEB Intelligent Monitoring Access Interface.........................................................................................36
3.2.1 Login Preparation ....................................................................................................................................36
3.2.2 Logging in the remote monitoring platform ..............................................................................................40
3.2.3 Monitoring Homepage .............................................................................................................................41
3.2.4 Menu items..............................................................................................................................................44
3.3 ECO Settings and Operating Instructions...........................................................................................................70
3.3.1 Setting ECO Mode...................................................................................................................................70
3.3.2 Descriptions of Operating Conditions......................................................................................................70
Chapter 4 Maintenance.....................................................................................................................................................72
4.1 Precautions before Maintenance ........................................................................................................................72
4.2 Maintenance Preparation....................................................................................................................................72
4.2.1 Technical Materials..................................................................................................................................72
4.2.2 Tools........................................................................................................................................................72
4.2.3 Personnel ................................................................................................................................................73
4.3 Equipment Maintenance.....................................................................................................................................73
4.3.1 Maintenance of WEB Monitoring Unit......................................................................................................73
4.3.2 Air Conditioner System Maintenance ......................................................................................................74
4.3.3 UPS power distribution system maintenance ..........................................................................................76
4.4 Alarm reference ..................................................................................................................................................76
4.5 Troubleshooting..................................................................................................................................................77
4.6 Parts Replacement and Recycle.........................................................................................................................78
4.6.1 Replace equipment filter..........................................................................................................................78
4.6.2 Parts replacement and decomposition ....................................................................................................79
Appendix 1 System Wiring Diagram..................................................................................................................................80
Appendix 2 AC schematic diagram ...................................................................................................................................81

SmartCabinet2-E Series Computer Room Solution Product User Manual
Chapter 1 Product Overview 1
Chapter 1 Product Overview
The SmartCabinet 2-E series of computer room solution products (referred to as SmartCabinet 2-E products for
short) are the data cabinet solution products produced by Vertiv Tech Co., which are applied to micro data centers,
office areas and other indoor environments. The SmartCabinet 2-E products are used for installation and placement
of 19-inch cabinet-type hardware equipment in line with industry standards (EIA-310-E), including servers, voice,
data, Internet network equipment and including power supply and distribution system, air conditioning system, rack
support system, monitoring management system and fire subrack system (optional). It realizes the safe and efficient
operation of the miniature data center and maintains the normal and stable operation of the important equipment
such as the server inside the cabinet. It achieves standardized design and standardized on-site assembly without the
needs to elevate the floor and install outdoor unit, and the integrated delivery greatly shortens the delivery cycle.
The monitoring management system is based on the powerful data center monitoring and management platform of
Vertiv. It is compatible with the whole series of Vertiv products, and it is “Plug and Play”. It also provides additional
value which is difficult to achieve in separate purchasing such as energy consumption analysis. The new self-learning
ECO mode is adopted. Under the suitable equipment environment, the ECO fan is used to replace the air conditioner
to refrigerate the load. It has low noise and low power consumption, which greatly helps customers to quickly build a
green and healthy data center.
This chapter mainly introduces the model description, application scenario, product characteristics, appearance and
specifications, using environment, system architecture and performance indicators of SmartCabinet 2-E products.
1.1 Model Description
The model description of SmartCabinet 2-E is shown in Figure 1-1.
Figure 1-1 Model Description
1.2 Application Scenario
The SmartCabinet 2-E products mainly target small data center solutions in air-cooled scenarios. They are mainly
used in government, education, health care, transportation, energy, finance, small and medium-sized enterprises and
large company branches, and are mainly sold in China and Asia-Pacific region, and are usually applicable to
government agencies, bank outlets, offices, small data centers, etc.
1.3 Product Characteristics
Dust and noise control, high efficiency and energy saving: Fully closed operation and internal circulation system
to ensure the cleanliness of cabinets and temperature and humidity, prolong the life of IT equipment. The use of high
efficiency special UPS for computer room, combined with precision air conditioner, and sealed cold/hot aisle
technology, improves the efficiency of computer room refrigeration. The built-in fan and silent design make it suitable
for being used in the office area.

SmartCabinet2-E Series Computer Room Solution Product User Manual
2 Chapter 1 Product Overview
Intelligent monitoring: Integrating intelligent control functions such as environmental monitoring, equipment
monitoring, alarm linkage, etc., to provide a centralized monitoring platform for computer room management.
Highly integrated and space-saving: A standard cabinet provides constant operating conditions for all IT
equipment, and only power supply is needed at the user site. The system occupies no more than 1 m2 and is
compact and state-of-art.
Integrated air conditioner: The latest customized integrated TMM air conditioner equipment, which integrates
indoor and outdoor units, eliminates installation and maintenance troubles.
Friendly interface, unattended guarding: Ultra-large 9-inch HMI wide screen display integrates monitoring center
and display center in one, providing the equipment operation/alarm/security information at a glance, which is easy to
achieve all-weather remote monitoring of cabinet-level data center to meet different application scenarios.
Fast Delivery: Once in place, build in one hour, start in one day.
Access control management: Smart locks at cabinet level can be selected to ensure the safety of IT equipment in
cabinet.
Video management: Supporting IPC equipment, realizing video surveillance function of network camera.
ECO mode: The ECO mode can be activated intelligently according to the outside environment of the cabinet. The
whole load of fan equipment can be used for cooling, energy saving and noise reduction, environmental protection
and low carbon.
1.4 Product Specification and Appearance
Figure 1-2 SmartCabinet2-E product appearance
(
Glass door on the left, sheet metal door on the right
)
Table 1-1 SmartCabinet2-E product specifications
Parameters
Specifications
Model
Local model
(mechanical lock)
Local model
(smart lock)
Asia Pacific model
(mechanical lock)
Asia Pacific model
(smart lock)
sheet metal door
(mechanical lock)
Dimensions (W×D×H)
600 mm×1200 mm×2150 mm (including ECO module) 770 mm×1330 mm×2500 mm (including Airduct)
Equipment installation
available height
24U(1U=44.45mm)
IT equipment power
≤3kW
Voltage
L+N+PE, 220Vac/230Vac/240Vac

SmartCabinet2-E Series Computer Room Solution Product User Manual
Chapter 1 Product Overview 3
Parameters
Specifications
Sealed mode
Cold and hot aisles are fully sealed
Color
EG7021
Air conditioner cooling capacity
0.9~3.5W
Weight
<420kg
Noise
Overall<75dB, ECO mode only ≤50dB
1.5 Using Environment
1.5.1 Operating Environment
SmartCabinet 2-E products should be installed away from heat sources and sparks, avoid direct sunlight, and there
should be no corrosive gases and organic solvents in the room. The operating conditions are shown in Table 1-2.
Table 1-2 SmartCabinet2-E Operating Environment Requirements
Installation location
The installation site needs to be level;
The height of using space should not be less than 2400mm (If the Airduct is include , The height of using
space should not be less than 2700mm);
Using scenarios
In the computer room and office area, the front door is more than 1.2m away from the wall or obstacles
and the rear door is more than 1.0m away from the wall or obstacles.
Ambient
temperature
0˚C to 40˚C
Ambient humidity
≤80%RH (Notices *)
Altitude
< 2000m, air conditioners need to be derated for higher than 1000m
Rated operating
voltage
L+N+PE, 220Vac/230Vac/240Vac; 50/60Hz
Applicable form of
power grid
TN-S
Overvoltage level
II
Class of pollution
II
Notices *
When the whole unit runs in high temperature and humidity environment, condensation water may appear
outside the front glass door and the display panel, which is a normal phenomenon and does not affect the
use.
1.5.2 Storage Environment
The storage environment of SmartCabinet 2-E products is shown in Table 1-3.
Table 1-3 Storage Environment for SmartCabinet 2-E Products
Item
Requirement
Storage environment
Indoor, clean (no dust, etc.)
Ambient humidity
≤95%, (40˚C) RH
Ambient temperature
-25˚C to +55˚C
1.5.3 Space
When installing SmartCabinet 2-E, enough space should be reserved to facilitate the installation and maintenance of
cabinets. The required space for opening the front and rear doors of the cabinet is shown in Figure 1-3.

SmartCabinet2-E Series Computer Room Solution Product User Manual
4 Chapter 1 Product Overview
1. Front door of cabinet 2. Rear door of cabinet
Figure 1-3 SmartCabinet2-E Product Maintenance Space
The space using requirements of SmartCabinet 2-E model product are shown in Figure 1-4.
Figure 1-4 SmartCabinet2-E product using space
1.5.4 Load Bearing Capacity
The SmartCabinet 2-E product is heavier after the user equipment is installed in it, so the load-bearing capacity of the
computer room must be considered before installation. The SmartCabinet 2-E weighs about 350 kg. During
installation, it is necessary to evaluate the floor load-bearing according to the total weight of the equipment installed
by the users. If you can't determine, please consult the Vertiv office or the service center nearby.
1.6 System Architecture
1.6.1 Cabinet Structural Components
The cabinet adopts integrated sealed cold and hot aisle cabinet, which is used to install 19-inch hardware equipment
in line with industry standard (EIA-310-E), including server, voice, data, Internet network equipment and other
equipment. The whole rack system is fully sealed to keep the system clean, dust-free, energy-saving and noise
reduction (system noise ≤ 50dB with ECO mode).
1.6.2 Power Supply and Distribution System
The SmartCabinet 2-E product integrates ITA2 6kVA UPS, PMU and intelligent switch PDU components, provides
AC220V and DC12V/24V output, and provides a safe and reliable power supply system for the whole system and IT
load.
The SmartCabinet 2-E product integrates the latest ITA2 6kVA UPS, provides distribution support for IT load, air
conditioner equipment, ECO module, monitoring system and illumination system.

SmartCabinet2-E Series Computer Room Solution Product User Manual
Chapter 1 Product Overview 5
PMU, which is used to distribute and control power for PDU, air conditioner and monitoring system, implements the
centralized management for the power supply and distribution of the whole system, and has the function of one-way
input and multiple-way output control, which is easy to operate and easy to use.
Intelligent switch PDU: It can monitor parameters such as voltage/total current/active power/electricity, support the
connection / disconnection of the remote bit-by-bit control socket, and support socket sequential power-on.
UPS
Liebert® ITA2 6kVA UPS (hereinafter referred to as UPS for short) is an intelligent, on-line, sinusoidal uninterruptible
power supply system developed by Vertiv Tech Co., Ltd. It can provide reliable and high-quality AC power supply for
precision instruments and equipment. The UPS can be assembled into tower or rack type as required. This
equipment is suitable for AC power supply of small computer center, network, communication system, automatic
control system and precision instrument equipment.
Table 1-4 SmartCabinet2-E UPS Parameters
Item
ITA2 6kVA UPS
Input
Rated voltage
220Vac/230Vac/240Vac
Phase Voltage Range
176Vac~288Vac: Full load operation
100Vac~176Vac: Linear Derating
Half-load operation at 100Vac
Rated Frequency
50Hz/60Hz
Frequency range
40Hz to 70Hz
Output
Rated power
6kW
Voltage
220Vac/230Vac/240Vac
Overload capacity
105% to 125%: 5min; 125% to 150%: 1min; 150%: 200ms
(ambient temperature: 25 C)
Transfer time
Utility power←→Battery
0ms
Inverter←→Bypass
Synchronized transfer: <0ms
Asynchronous transfer (default): <20ms
Or 40 ms, 60 ms, 80 ms, 100 ms, 200 ms optional
Mechanical sizes
Dimensions (width x depth x height)
430mm*400mm*85mm
Weight
11 kg (gross weight 13 kg)
Environment
conditions
Working temperature
From 0˚C to 50˚C (at 50˚C, derated to 0.7)
Storage temperature
- 40˚C to + 70˚C without batteries; - 25˚C to + 55˚C with batteries
Relative humidity
5%RH to 85%RH, no condensation
Altitude
Less than 3000m; over 3000m, derate with reference to
GB/T3859.2
Rack-Mounted Distribution Module (PMU)
The SmartCabinet 2-E products use customized PMU equipment to provide distribution management for the whole
unit, equipped with level C SPD.
Table 1-5 SmartCabinet2-E PMU parameters
Parameters
Values
Product Model
MSC-TMM-PMU-G3
Rated operating voltage
220V/230V/240V
Rated insulation voltage
450Vac
Rated frequency
50/60Hz
Inlet and Outlet cables
Rear cabling

SmartCabinet2-E Series Computer Room Solution Product User Manual
6 Chapter 1 Product Overview
Power frequency withstand voltage 1 minute
1500V
SPD level
Level C protection
1.6.3 Cooling System
The SmartCabinet 2-E products use customized TMM integrated air conditioner, which integrates condensation
measurement and evaporation side in the same rack structure, without installing separate outdoor unit, reducing the
environmental requirements of equipment and facilitating rapid deployment of cabinets.
Table 1-6 SmartCabinet2-E Cooling System
Parameter Names
Parameter value
Power supply voltage
198Vac~264Vac
Power supply frequency
50/60Hz
Cooling capacity
Cooling capacity adjustable range:900W~3500W.( Cooling capacity is related to the working
environment)*
Air volume
The maximum air volume is 700m^3/h, and the minimum air volume is 350m^3/h.
Cooling system sealing
performance
Under the normal refrigerant (R410A) filling capacity, the leakage rate of the cooling system is ≤
5.7g / year.
Temperature setting range
Temperature setting and control range: 13 to 28°C, Minimum setting accuracy: ±1°C.
Refrigerant charge
720g
Notices *
If the system load is less than the minimum cooling capacity of the air conditioner, in combination
with the ambient temperature and humidity conditions may produce condensation on the inside
surface of the cabinet door, this phenomenon will not affect the stable operation of the cabinet
equipment, and will naturally disappear with changes in load and environmental conditions.
1.6.4 Monitoring management system
The SmartCabinet2-E product uses the HMI display screen as the whole unit monitoring management center. It has
an intelligent management system that can provide power and environment monitoring inside the cabinet. It supports
the plug-and-play of Vertiv intelligent sensor modules and provides various types of alarm notifications of equipment
and environment status and provides the user with integrated web page access function and local display and
control functions.
1.6.5 Alarm system
It is equipped with monitoring and alarming devices such as temperature and humidity sensor, digital signal input and
output module, water sensor, tri-color ambience lamp, smoke detector alarm (optional) and smart door lock. It can
detect the temperature and humidity, condensation water, and security inside and outside the cabinet in real time, and
automatically make judgment of alarm information and can issue the alarm through HMI screen, WEB background
monitoring system, SMS Modem and other means.
1.6.6 Lightning protection grounding system
The SmartCabinet2-E products are equipped with Level C SPD. The power distribution of the whole unit meets the
requirements of Level C lightning protection test. It has passed the lightning protection test of L-PE and N-PE 15kA,
and meets the YD/T944 standard. The SmartCabinet2-E product connects to the TN-S power distribution system.
The power neutral point is directly grounded.
The cabinet enclosure and other accessible conductive enclosures are connected to the external grounding system
by a special grounding cable. The grounding resistance of the whole unit is <0.1, and the current can withstand ≥25A.
1.7 Technical Specifications
Table 1-7 SmartCabinet2-E Technical Specifications
Power supply and
distribution system
Input voltage
220Vac/230Vac/240Vac(phase)
Input voltage range
AC176V~288V

SmartCabinet2-E Series Computer Room Solution Product User Manual
Chapter 1 Product Overview 7
Input frequency
50Hz/60Hz
Output voltage
220Vac/230Vac/240Vac (single-phase output)
Output frequency
50Hz/60Hz , rated frequency ±3Hz
Lightning protection
Configure a Level C SPD
IT power consumption
≤3kW
UPS Power Distribution
ITA2 6K UPS
Battery pack
16-cell 12V 9Ah battery
IT power distribution
dual PDU(optional)
PDU with 16 ports
DC output
12Vdc
24Vdc
Cooling system
Air conditioner model
TMM-AR3W1
Power supply
220V/1P/50&60Hz single-phase input
Voltage range 198Vac to 264Vac
Cooling capacity range
Cooling capacity adjustable range:900W~3500W。
Refrigerant
R410A
Certification
CE Certification
Weight
45kg
Emergency fan unit(ECO
module)
1 groups: rear door top (self-starting: high temperature alarm in the
cabinet, and ambient temperature lower than cold passage
temperature)

SmartCabinet2-E Series Computer Room Solution Product User Manual
8 Chapter 2 Product Installation And Commissioning
Chapter 2 Product Installation And Commissioning
2.1 Installation Preparation
This chapter mainly introduces the preparation of SmartCabinet2-E products before installation, including installation
tools, accessories, shipping accessories, moving and transportation, unpacking, inspection, installation precautions
and equipment room requirements.
Notices
1. The components of the SmartCabinet2-E are bulky and heavy, posing a risk of tipping, which can result in personal injury,
death, and equipment damage.
2. Read all the instructions below before attempting to move, lift the components, or remove the package.
3. Sharp edges, pointed corners and bare shackles can cause injuries. Only trained personnel with appropriate safety helmets,
gloves, shoes and glasses can move, lift components, unpack or prepare for installation.
4. The cabinet kit may be too high to pass through the doorway with the pallet. Measure cabinet assembly and doorway height
and identify space before moving cabinet components and air conditioner indoor units to avoid damaging equipment and
buildings.
2.1.1 Materials
Before installing the SmartCabinet2-E product, in addition to this document, you need to prepare the following
materials in advance so that you can refer to it at any time.
Table 2-1 SmartCabinet2-E system features
Materials
Purpose
Access method
SmartCabinet2-E whole unit
wiring schematic diagram
Confirm the electrical and control loop of the whole unit,
and the distribution system organization structure
Refer to Appendix 1 System
Power Distribution Diagram
SmartCabinet2-E Product Quick
Installation Guide
Guides on-site installation
Shipped with the product
2.1.2 Tools and Accessories
To install the cabinet, you need to prepare the following tools.
Table 2-2 SmartCabinet2-E install tools
Name
Purpose
Appearance
Utility knife
Disassemble all kinds of equipment packaging
Philips screwdriver
Tighten the screws when assembling the parts, recommended size: 1X300
Flat-blade screwdriver
Dismantle wooden box steel tongue
Claw hammer
Dismantle wooden box steel tongue
Levelling meter
Displays the horizontal status of the cabinet system when it is leveled

SmartCabinet2-E Series Computer Room Solution Product User Manual
Chapter 2 Product Installation And Commissioning 9
Name
Purpose
Appearance
Floating nut buckle
Dismantle or install floating nut
#19 open end wrench
Remove M12 foot nut
Adjustable wrench
Remove the foot press M8 bolt
Step ladder
Assist the removal of packaging, installation of ECO fan module
Multimeter
Detect power distribution system status and cable wiring
The accessories are placed in the accessory box inside the cabinet. As shown in Figure 2-1, open the accessory box
to obtain the accessories. The list of accessories is as follows:
Figure 2-1 The accessories
Table 2-3 The accessories list
Name
Purpose
Appearance
Quantity
Floating nut
Used with M6 screws for the installation of user parts
in the cabinet
40
M6x16 panel screws
Used for the installation of user parts in the cabinet
30
Accessories

SmartCabinet2-E Series Computer Room Solution Product User Manual
10 Chapter 2 Product Installation And Commissioning
Name
Purpose
Appearance
Quantity
295mm black cable-ties
Binding wires
70
100mm black cable-ties
Binding wires
30
Cable tie base
Used for fixing the cable
10
1U dummy panel with
brush
Used for blocking the U position with cable passing
1
1U plastic blind plate
Used for blocking U position
12
UPS User Manual
/
1
OT terminal
Clamped onto the user input power cable
4
Floating nut handle
Remove or install the floating nut
1
Combination screw
M5*12
Used for the installation of user parts in the cabinet
6
Plastic Parts
plug a hole on cabinet
4
AC handle
Dismantling and installing AC
1
2.1.3 Installation Environment
Cabinet information
Table 2-4 Cabinet information
Cabinet status
Dimensions (width × depth × height)
Weight
Wooden packaging
770mm×1420mm×2260mm
450kg
Bare cabinet
600mm×1200mm×2000mm
390kg
Installation Environment
Table 2-5 Installation Environment
Item
Requirements
Site
Ground flatness tolerance 3mm/2000mm
Site height ≥ 2.4m(If the Airduct is including, Site height ≥ 2.7m)

SmartCabinet2-E Series Computer Room Solution Product User Manual
Chapter 2 Product Installation And Commissioning 11
Item
Requirements
Power supply
Minimum cable cross-sectional area ≥6mm2
Minimum MCB specification ≥63A
The length of the cable connected inside the cabinet is about 0.6m
Communication
The length of the cable connected inside the cabinet is about 0.6m
Drainage
Allows 12mm diameter silicone hose to be inserted
2.1.4 Personnel
The construction personnel must have basic safety operation knowledge and must be professionally trained to
master the correct operation method. The construction personnel must pass the startup and debugging certification of
Vertiv small UPS DPG\air-conditioner and have a certificate.
Notices
Vertiv does not assume any responsibility for damage to individuals and equipment caused by the construction personnel who
obtained the above certification.
2.2 Equipment Installation
2.2.1 Moving and Handling
Transportation
When transporting cabinet components, air conditioner indoor units and outdoor units, it is recommended to choose
rail transportation or shipping. If you choose to transport by a vehicle, you should choose a road with better road
conditions to prevent excessive bumps.
Moving and Handling
The user needs to transport the cabinet, air conditioner and components to the nearest location to the installation
site. Due to the heavy weight, it is recommended to use mechanical handling tools, such as pallet trucks (commonly
known as “land cows”) or electric forklifts, as shown in Figure 2-2.
Figure 2-2 Hand Pallet Truck & an Electric Forklift
When unloading and transporting with “land cow” or electric forklifts, it is recommended that the fork is at the center of
gravity to prevent tipping, as shown in the Figure 2-3.

SmartCabinet2-E Series Computer Room Solution Product User Manual
12 Chapter 2 Product Installation And Commissioning
叉入方向
Figure 2-3 Forklift Direction
When transporting each component, the inclination of each equipment should be kept within the range of 80° to 100°,
and should not be excessively tilted, as shown in the Figure 2-4.
Figure 2-4 Carrying obliquity
Notices
1. Always keep the equipment upright and do not leave the equipment outdoors.
2. Use a forklift or pallet truck to ensure that the fork arms (if adjustable) are opened to the widest distance so that they are placed
just below the equipment pallet. Also, make sure the length of the fork arm matches the length of the device.
3. When moving the condenser manually, do not touch the copper tube to avoid bending and deformation of the copper tube and
system leakage.
2.2.2 Installing the Cabinet
1. Unpacking
It is recommended to unpack the cabinet before placing it in the designated site. The steps are as follows:
1) Check the anti-tipping label outside the box before opening the box. If the anti- tipping label is activated (the anti-
tipping label turns red), please contact the staff of Vertiv in time for proper disposal.
2) If you receive the carton packaging, use a utility knife to remove the packaging material, as shown in the
Figure 2-5.
100°
80°

SmartCabinet2-E Series Computer Room Solution Product User Manual
Chapter 2 Product Installation And Commissioning 13
Figure 2-5 Remove paper package
3) If you receive the wooden box packaging, use a flat-blade screwdriver with a claw hammer to open the steel
tongue and remove the packaging board, as shown in Figure 2-6.
Figure 2-6 Remove wooden package
4) Use a #19 wrench to screw the foot nut, lower the foot, and lift the cabinet. Remove the M8 bolt with the movable
wrench and remove the foot-press plate, as shown in Figure 2-7.
叉入方向

SmartCabinet2-E Series Computer Room Solution Product User Manual
14 Chapter 2 Product Installation And Commissioning
Figure 2-7 Remove foot-press plate
Notices
1. The cabinet kit has 4 press plates.
2. There is a risk of scratching the bottom of the cabinet when the floor pressure plate is disassembled.
5) Lift the cabinet horizontally, remove the pallet at the bottom, and gently place the cabinets on the horizontal floor
as shown in the figure 2-8.
Figure 2-8 Removing the pallet
Notices
After the cabinet is placed on the ground, it needs to be leveled, and the inclination angle is less than 5°.
2. Cabinet placement
The cabinet should be placed for future maintenance, as shown in Figure 2-9.
Table of contents
Popular Computer Hardware manuals by other brands

Linksys
Linksys EtherFast PCM100 v2 user guide

Dialogic
Dialogic D600JCT-1E1-120-EW installation guide

Hakki Pilke
Hakki Pilke 43 Pro Instructions for assembly, operation and maintenance

Nvidia
Nvidia BlueField-2 BF2500 user guide

HighPoint
HighPoint SSD7103 installation guide

ICP Electronics
ICP Electronics PX-10S user manual