1. IMPORTANT INFORMATION TO REVIEW PRIOR TO INSTALLATION, OPERATION
AND MAINTENANCE
Read the ENTIRE MANUAL prior to installing and maintaining the pressurization unit. Do not install or
perform maintenance on the pressurization unit if you do not understand all of the instructions. Contact
VoltAire at (407)378-7482 with any technical questions or concerns.
Warning: Improper installation and operation may cause property damage, personal injury or loss of
life. The pressurization unit shall only be installed and maintained by a qualified professional in strict
accordance with the requirements within this manual and in accordance with all local, state and federal codes.
In the event of a conflict, code requirements shall take precedence over the instructions provided within this
manual. The installer shall be aware of all code requirements and shall comply fully.
Use care when transporting and lifting the pressurization unit.
Remove power from the unit during maintenance and installation, as line voltage may be dangerous,
hazardous and lethal.
Warning: Wear proper personal protection equipment, including but not limited to safety glasses,
goggles and gloves. Edges may be sharp.
These instructions should be retained by the owner and/or with the unit.
2. PARTS SHIPPED LOOSE AND TOOLS/MATERIALS PROVIDED BY INSTALLER
Materials Shipped Loose for field installation by Installer:
a) Seven (7) ¼-20 Bolts with Seven (7) ¼-20 Nuts and Seven (7) ¼-20 Lock Washers
b) One (1) Intake Air Hood
Required Tools and Materials provided by Installer:
a) External disconnect
b) Conduit nut and bushing for high voltage wiring
c) Exterior rated silicone sealant
d) ¼-20 HEX head screw driver
e) ¼-20 Nut Driver/wrench
f) Sixteen (16) 5/16" Ø fasteners and nylon
washers