manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Von Duprin
  6. •
  7. Industrial Equipment
  8. •
  9. Von Duprin EPT2 User manual

Von Duprin EPT2 User manual


941071-00
Electric Power Transfer (EPT)
EPT2, EPT10,
& EPT10C Installation Instructions
© Allegion 2014
Printed in U.S.A.
941071-00 Rev. 10/14-e
Customer Service
1-877-671-7011 www.allegion.com/us
A. Frame Backbox
B. Metal - #10-24 x 3/8” Flat Phillips Head Machine Screw (4)
Wood - #10 x 3/4” Flat Phillips Head Wood Screw (4)
C. EPT2 - Wire Connectors 12 Gauge Yellow (4)
EPT10 - Wire Connectors 18 Gauge Violet (20)
EPT10C - Wire Connectors 18 Gauge Violet (20)
D. EPT Assembly
E. Metal - #10-24 x 3/4” Flat Phillips Head Machine Screw (8)
Wood - #10 x 3/4” Flat Phillips Head Wood Screw (8)
F. Door Backbox
G. Strain Relief
Tools for Install Read all Warnings Before Starting Installation!
D
A
F
C
G
EPT2 Shown
E
B
Door Leaf
Frame Leaf
EPT10 EPT10C
Note: Door backbox is
beveled to match door
EPT2
To ensure the maximum amount of
travel in arm for cam lift hinges, install
EPT so door side leaf is oriented with
knuckle on top.
2
General Information
Specifications
Read all Warnings Before Starting Installation!
An electric power transfer (EPT) provides a wiring path from the door to the frame.
These instructions assume that a factory-prepped door and frame are being used. If the door and frame have not
been factory-prepped, see the included dimensioned template.
Before beginning the installation, review “Specifications” and “Warnings”.
Applications
EPT can be used for:
s$OOR Thickness - 1-3/4” minimum
Note: The following specifications apply to a
1-3/4” thick door.
sOPENINGWITHUPTO” butt hinges
sOPENINGWITHUPTO” offset pivots
sOPENINGWITH” butt hinges
sOPENINGWITH” butt hinges
Electrical Ratings
%04
s TwOAWG wires
s-AX. Rating:6$C!OR
6AC NEC Class 3
EPT cannot be used for:
s” offset pivots
sLARGERTHAN” butt hinges
sPOcket pivots
sswing clear hinges
sCENTERHUNGDOOR
(center pivot)
sBALANCEDDOOR
%04%04#
s TENAWG wires
s-AX2ATING:6$C, 1A
$ONOTeXCEEDrated specifications (shown above).
EPT must be installed in accordance with these instructions by a qualified electrician.
Wiring must be in accordance with all local codes and regulations.
CAUTION
!
CAUTION
!
CAUTION
!
3
Installation
Mount Door Backbox
1Use Template from Back Page to Verify Preparation
2
3
Top Knockout
(1/2”)
Mount Frame Backbox
A. Remove knockout from top
B. Install 1/2” conduit, if used
C. Pull 5” of field wiring through knockout
Field Wiring
A. Ensure backbox bevel matches door bevel
B. Remove knockout: - from bottom for metal doors
- from back for wood doors
C. Pull 5” of field wiring through knockout
D. Install strain relief
Field Wiring
Strain Relief
Frame
Door
OR
Door backbox bevel must
match bevel on door
Top View
Backbox is required for
fire wood doors. Rear
knockout must be used.
5
Mount EPT Assembly
4Connect Wires
6
Verify that door opens and closes properly without
binding and that electrical components function
Connectors
Keep area under elbows free
of connectors. splices, and
field wiring cable
Do not pinch wires
between backbox and
EPT assembly
Elbows must have
approximately 1/2”
of free motion when
pulled straight out
Refer to wiring information
in product instructions
4
MIN.
11
4
"
11
32
"
83
8
"
MAX.
33
4"
3
4
"
3
8
"
21
32
"
91
16
"
FROM OUTSIDE
FACE OF DOOR
7
8
"
FOR FRAME
5
8
"
73
4
"
FOR DOOR
5
8"
*ALL DIMENSIONS ARE TYPICAL
1
4
"
15
8
"
15
8
"
REINFORCEMENT
.060" (16 GA.)
MINIMUM
OF EPT IN FRAME MUST ALIGN
WITH OF EPT IN DOOR.
1
4
"
FRAME DOOR DOOR OR FRAME
DOOR OR FRAME
(SIDE VIEW) (SIDE VIEW)
WHEN INSTALLED
WOOD:
HOLES PREPARED
DURING INSTALL.
METAL:
#10-24 TAPPED
HOLE (12 PLCS)
(OPEN 180 )
RECOMMENDED 6" BELOW
UPPER HINGE
METAL WOOD
X 1
4DEEP
1" DIA.
"
THRU TO
WIRE
CHANNEL
5
8DIA.
"
Note: This drawing is not to scale
Template

This manual suits for next models

2

Popular Industrial Equipment manuals by other brands

ABB +Q957 user manual

ABB

ABB +Q957 user manual

G.B.C BASIC EDGE 50 instruction manual

G.B.C

G.B.C BASIC EDGE 50 instruction manual

Tronair Batpak 11-6602-1000 Operation & service manual

Tronair

Tronair Batpak 11-6602-1000 Operation & service manual

Pilz PNOZ mi2p Operation manual

Pilz

Pilz PNOZ mi2p Operation manual

Clemco Zero BNP 6012 manual

Clemco

Clemco Zero BNP 6012 manual

Erskine Attachments V-Plow Operator's manual

Erskine Attachments

Erskine Attachments V-Plow Operator's manual

ABB HT610965 Operation manual

ABB

ABB HT610965 Operation manual

Morra MH 540 user manual

Morra

Morra MH 540 user manual

Eaton S090ST manual

Eaton

Eaton S090ST manual

GRIGGIO G 240 P4 instructions

GRIGGIO

GRIGGIO G 240 P4 instructions

Nexen AIR CHAMP HT45 user manual

Nexen

Nexen AIR CHAMP HT45 user manual

WTE V5 installation manual

WTE

WTE V5 installation manual

ABB HT845232 Operation manual

ABB

ABB HT845232 Operation manual

SMC Networks CJP Series Operation manual

SMC Networks

SMC Networks CJP Series Operation manual

JohnDow Industries JDI-AFT58 Operator's manual

JohnDow Industries

JohnDow Industries JDI-AFT58 Operator's manual

IMB MB9016A instruction manual

IMB

IMB MB9016A instruction manual

Clarke CUMB1 Assembly & operating instructions

Clarke

Clarke CUMB1 Assembly & operating instructions

amiad Arkal Spin Klin 2 user guide

amiad

amiad Arkal Spin Klin 2 user guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.